Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

TECHNIP CONSORTIUM

DUNG QUAT REFINERY PROJECT


WORKS INSPECTION REPORT

Form No:
Subc. No:
Sheet:

QCF 010
1 of 1

Consecutive No.
DESCRIPTION OF WORKS TO BE INSPECTED:
LOCATION:
DRAWINGS-PROCEDURE-DOCUMENTS REFERENCE:
MATERIALS
TOOLS
Nil
COMPLIANCE WITH DOCUMENTS

WORKMANSHIP
Normial Diameter of Pipe :
IDENTIFICATION OF PIPE :
OTHERS
CONCLUSION/REMARKS:

INSPECTED BY: ___________________________


Name (Subcontractor)

_________________________
Signed

__________________
Date

INSPECTED BY: ___________________________


Name (Contractor)

_________________________
Signed

__________________
Date

INSPECTED BY: ___________________________


Name (CLIENT/PMC)

_________________________
Signed

__________________
Date

You might also like