Professional Documents
Culture Documents
QCF007 Post Pour Inspection and Concrete Repair
QCF007 Post Pour Inspection and Concrete Repair
SUBCONTRACTOR ACCEPTANCE
TPC ACCEPTANCE
REMARKS
CONDITION OF SURFACE
CONCRETE REPAIR
DESCRIPTION OF DEFECT : PROPOSED REPAIR PROCEDURE NO. : ____________ DESCRIPTION REMOVAL OF SURPLUS MATERIAL SURFACE PREPARATION INSPECTION MATERIALS EQUIPMENT AND TESTING POST REPAIR INSPECTION INSPECTED BY: _____________________________ Name (Subcontractor) INSPECTED BY: _____________________________ Name (Contractor) INSPECTED BY: _____________________________ Name (CLIENT/PMC) _______________________ Signed _______________________ Signed _______________________ Signed __________________ Date __________________ Date __________________ Date or NCR No. ___________ TPC ACCEPTANCE CLIENT/PMC ACCEPTANCE SUBCONTRACTOR ACCEPTANCE