Finish CBTs Talk to people about HVRU controls project Follow up with Brian or Walt on tuning for T5500 Investigate 40 F alarm on T5500 and talk to Rusty Lewis when he gets back from vacation Talk to Paul and schedule meeting for options on air compressors Call Owen Vaughn Begin collecting information for Israel Contact Peerless Read control design in Process Design Basis file for cyclo When with Ed in afternoon, ask him to show tuning for T5500 controllers Check TDC and steam flow controller change FF ratio from .024 to .018 Simulate T5500 for controls Check hydraulics from T5500 to tank farm Can we historize LT5500? (stabilizer bottoms level) Call Amistco to ask about the quote, then schedule meeting Why does TD PV change with no other variables changing? (does transmitter need to be checked?) Contact Trevor Lane with regards to compressors in Sweeny (Awaiting info) Look at other compressors rated at 2400 V Find available space for substation (Briefly scoped out area. More investigation needed) Talk to Johnny Polar about HVRU

For Tags list: - Update database to include ACTIVE_CHK field - Filter out all records that start with P_ in PARENT_TAGNAME field - Get with walt to check tags - Check indicator tags with Vision Flow database to see if they are used. If so, they will need to be configured as such: o Bring in the transmitter signal into PIDA block and historize it in the DCS o Modify the indicator tag in PHD to update the parameters according to how it is configured in Experion o This will ensure that the indicator tag still exists so it can be used in Vision Flow - Update attributes on each tag

You might also like