HSE WEEKLY REPORT

BNPP Project
REPORT NUMBER: HSE- WR SM-0015 REPORT PERIOD: 4-9 MAY 2013 SAFE MANHOUR: 3,240 Total man hour work without LTI 3,240 Total man hour this week 3,240 Average Manpower Daily 54 No DESCRIPTION 1. 2. 3. 4. 5. 6. 7. 8. 9.
Fatal Accident Lost Time Injury (LTI) Restricted Work Cases (RWC) Medical Treatment Case (MTC) Vehicle/Property/Equipment Damage Accidents First Aid Treatment Cases (FAC) No. of Ill-Health Cases No. of Heat Related Illness /Injury No. of Reported Near Miss(NM)

BNPP TARGET 0 5/ yr. 7/ yr. 23/ yr. 22/ yr.


Actual Actual Actual Actual TBD/wk 12/wk 1/wk 6/wk 1/ wk 1/wk 90% per year

THIS PERIOD 0 0 0 0 0 0 0 0 0 3 0 0 6 0 0 0

ACCUMULATION 0 0 0 0 0 0 0 0 0 25 0 0 84 0 0 0

10. No. of Reported CAR 11. No. of inspection Report (for Daily) 12. No. of Environmental Findings 13. No. of tool box Meeting Conducted 14. No. of Internal HSE Meeting 15. No.
of (Internal) Assisted) Training Conducted

16. No. of Training Percentage (HSJV

ACHIEVEMENTS THIS PERIOD: Achieved 3,240 hours safe work. No First aid cases and zero tolerance to unsafe acts. Minimized hazards by ensuring that all jobs are well planned,workers are properly trained and all safesafe practices and procedures are followed. Implemented safety programs to ensure all workers on the job work safely. Ventilation on the workshop has been improved toxic fumes and irritants was minimized.

Page 1

HSE WEEKLY REPORT


BNPP Project

MEDICAL CONCERNS 1. Always advised the workers never take medicines that were not prescribed by the doctor. TARGET FOR NEXT WEEK 1. Encourage everyone to continue and persevere to achieve company by complying right procedure in designated job. the goal of the

2. Keep on reminding everyone to do the certain activity effectively and efficiently. 3. Develop safety awareness for new starters and issue PPE base on their designated job that they were perform.

4. We will keep on reminding our workers about safe working procedures to maintain zero accidents and injuries.

ATTACHMENTS: 1. Tool box meeting 2. Organizational chart 3. Housekeeping checklist