BREAKDOWN COST PT. BUKIT JAYA GROUP Surabaya Attention : Mr.Aditya Hardo Wardhana Staf Vendor management Dept aditya.hardo@bukitjaya.com Dear Project : Client : Location : Periode : NO Herewith we would like to submit the captioned subject as follows as : PT.PLTU PT, BUKIT JAYA GROUP REMBANG 2011 PEKERJAAN Prepared by Check by Date Revision UNIT PRICE (Rp) : : : : Sabar Ir.Alim .s Des, 14- 2010 0 PRICE (Rp)

***VOLUME

SATUAN

A A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 B

PREPARATION WORKS Mobdemob tool Borring pile Mobdemob tool & equipment Mobdemob manpower Site office & facility Mess for staff Mess for non staf PPE ( Safety Cost) Security Sosial cost

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ls Ls Ls Ls Ls Ls Ls Ls Ls

60,000,000 17,500,000 12,500,000 65,000,000 14,750,000 22,500,000 15,000,000 8,700,000 4,500,000

60,000,000.00 17,500,000.00 12,500,000.00 65,000,000.00 14,750,000.00 22,500,000.00 15,000,000.00 8,700,000.00 4,500,000.00

CIVIL WORKS B.1 FONDATION & COLOUMN B.2 BOR PILE d60 CM PILE CAP B.4 EXCAVATION B.5 FORMWORK B.6 REINFORCEMENT B.7 CONCRETE COLUMN B.9 FORMWORK B.10 REINFORCEMENT B.11 CONCRETE

2,011.20 533.35 1,424.06 50,672.38 413.62

M M3 M2 KG M3

1,100,000 55,000 175,000 14,500 875,000 175,000 14,500 950,000

2,212,320,000.00 29,334,360.00 249,211,200.00 734,749,486.80 361,921,000.00 810,734,400.00 2,292,706,046.80 1,373,046,400.00 8,284,472,893.60 4,123,724,400.00

4,632.77 M2 158,117.66 KG 1,445.31 M3 *SUB TOTAL FOUNDATION & COLOUMN (Rp) 9,164 M2 *SUB TOTAL WALL BARRIER (Rp) 1,857,218 KG **SUB TOTAL ERECTION (Rp)

2 WALL BARRIER

450,000

3 ERECTION

4,500

8,357,479,524.00

*) **)

***)

20,765,676,817.60 KETERANGAN = HARGA TERSEBUT BERSIFAT FIX UNIT PRICE TERMASUK MATERIAL & JASA KERJA , ALAT KERJA , SAFETY EQUIPMENT , AIR KERJA , AKOMODASI KERJA HARGA TERSEBUT BERSIFAT FIX UNIT PRICE TERMASUK JASA KERJA , ALAT KERJA , SAFETY EQUIPMENT , AKOMODASI KERJA , CONSUMABLES MATERIALS & CRANES (FUELS & OPERATOR) VOLUME DAPAT BERUBAH SEWAKTU - WAKTU MENGIKUTI GAMBAR

General Term & condition : 1. Above price exclude tax. 2. Payment : Down payment 20% 1 week after issued PO and remaining payment montly progress within 30 days after received invoice. 3. Schedule : 4. Validity of quotation : 1 month. We hope our quotation will meet your requierment. Thank you for your attention. Yours Trully,

Mr. Alim Suciana Director