Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

Ministry of Transportation - Field Services, Paving

End Product Specification For Asphalt Pavement Construction


Field Lab Summary
M-1
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
Lot #

LOT
Target or maximum Bonus-

(Version: 1.0)
12345 - Hwy #1 - Cityname
Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
M-1

DATE PAVED:
DATE SAMPLED:
DATE TESTED:
CONTRACTOR:

2003-Month-Day
2003-Month-Day
2003-Month-Day
Acme Contracting

Lab Summary: Density, AC Content, Gradation


& Application Rate
Q.C. - Consultant: Smith Consulting Inc.
Project Supervisor: Pro. Supervisor - Name
Contractor Rep.: Superintendent - Name

Application

Density

Density

Density

Density

AC Content

AC Content

AC Content

Rate

SL #1

SL #2

SL #3

Average

Burn #1

Burn #2

Burn #3

Average

Gradation

12.5mm

100%

100.00

100.00

100.00

100.00

5.50

5.50

5.50

5.50

92.8

61.2

22.1

100.7%

98.83

99.52

100.94

99.76

5.40

5.45

5.55

5.45

92.5

61.6

18.6

4.75mm .600mm

Bottom Lift & L. C.

A-09/10 (#1) -

ortation - Field Services, Paving

on For Asphalt Pavement Construction


ld Lab Summary

.075mm

5.10
6.10

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Mechanical Analysis of Aggregates
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:
DATE SAMPLED:
DATE TESTED:
LOT #:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day
2003-Month-Day
2003-Month-Day
M-1

Contractor: Acme Contracting


Project Supervisor: Pro. Supervisor - Name
Contractor Rep.: Superintendent - Name
Remarks:

Mass Before Wash Mass After Wash Loss Wash Pan Total Loss 0.075 -

1695.1
1617.6
77.5
9.2
86.7

Burn #1 / Sub Lot #1


Sieve Size WT Ret. % Retain. % Pass Gradation Limits
(SI)
(g)

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan
Total -

0.0
0.0
78.4
239.7
332.0
286.7
186.0
170.1
175.3
93.4
45.6
86.7
1693.9

0.0
0.0
4.6
14.1
19.6
16.9
11.0
10.0
10.3
5.5
2.69
5.11

** Under Construction !!! **


This area will display a Graph of
% Passing & Gradation Limits.
Look For undates in June 2003 @ this site.

100.0
100.0
95.4
81.2
61.6
44.7
33.8
23.7
13.4
7.9
5.11

100.0
100.0
88.3
74.9
56.7
39.5
28.4
17.1
10.0
6.6
4.55

100.0
100.0
97.3
83.9
65.7
47.5
36.4
24.1
15.0
9.6
6.55

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Mechanical Analysis of Aggregates
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:
DATE SAMPLED:
DATE TESTED:
LOT #:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day
2003-Month-Day
2003-Month-Day
M-1

Contractor: Acme Contracting


Project Supervisor: Pro. Supervisor - Name
Contractor Rep.: Superintendent - Name
Remarks:

Mass Before Wash Mass After Wash Loss Wash Pan Total Loss 0.075 -

1744.2
1666.8
77.4
10.7
88.1

Burn #2 / Sub Lot #2


Sieve Size WT Ret. % Retain. % Pass Gradation Limits
(SI)
(g)

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan
Total -

0.0
0.0
79.9
216.3
343.4
304.0
201.1
180.7
184.9
98.1
47.7
88.1
1744.2

0.0
0.0
4.6
12.4
19.7
17.4
11.5
10.4
10.6
5.6
2.73
5.05

** Under Construction !!! **


This area will display a Graph of
% Passing & Gradation Limits.
Look For undates in June 2003 @ this site.

100.0
100.0
95.4
83.0
63.3
45.9
34.4
24.0
13.4
7.8
5.05

100.0
100.0
88.3
74.9
56.7
39.5
28.4
17.1
10.0
6.6
4.55

100.0
100.0
97.3
83.9
65.7
47.5
36.4
24.1
15.0
9.6
6.55

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Mechanical Analysis of Aggregates
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:
DATE SAMPLED:
DATE TESTED:
LOT #:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day
2003-Month-Day
2003-Month-Day
M-1

Contractor: Acme Contracting


Project Supervisor: Pro. Supervisor - Name
Contractor Rep.: Superintendent - Name
Remarks:

Mass Before Wash Mass After Wash Loss Wash Pan Total Loss 0.075 -

1748.6
1664.3
84.3
8.5
92.8

Burn #3 / Sub Lot #3


Sieve Size WT Ret. % Retain. % Pass Gradation Limits
(SI)
(g)

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan
Total -

0.0
0.0
85.9
210.1
357.6
321.3
195.0
172.1
172.8
93.2
47.3
92.8
1748.1

0.0
0.0
4.9
12.0
20.5
18.4
11.2
9.8
9.9
5.3
2.71
5.31

** Under Construction !!! **


This area will display a Graph of
% Passing & Gradation Limits.
Look For undates in June 2003 @ this site.

100.0
100.0
95.1
83.1
62.6
44.2
33.1
23.3
13.4
8.0
5.31

100.0
100.0
88.3
74.9
56.7
39.5
28.4
17.1
10.0
6.6
4.55

100.0
100.0
97.3
83.9
65.7
47.5
36.4
24.1
15.0
9.6
6.55

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Mechanical Analysis of Aggregates & Determination of Asphalt Content
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day

DATE SAMPLED:
DATE TESTED:
LOT #:
Contractor:

2003-Month-Day
2003-Month-Day
M-1
Acme Contracting

1
60

2
60

3
60

5,852.2
4,056.5

5,945.6
4,096.4

5,996.3
4,096.1

1,795.7

1,849.2

Trays After Ignition

5,751.6

5,840.6

1,900.2
5,887.3
5,887.3

E. Tare Wt. Of Trays


F. Net Wt. Of Sample
After ignition (D-E)

4,056.5

4,096.4

4,096.1

1,695.1

1,744.2

1,791.2

100.6

105.0

109.0

5.93
0.53

6.02
0.53

6.09
0.53

5.40
5.50
-0.10

5.49
5.50
-0.01

5.56
5.50
0.06

Smple No. / Sub Lot


Burn Time (Minutes) -

A. Wt.of Sample &


Trays before ignition
B. Tre Wt. Of trays
C. Net Wt. Of Sample
Before Ignition (A-B)
D. Wt. Of Sample &

G. (C-F) Loss of Mass


H. (G/F)= Asphalt
)
Correction Factor
Asphalt Content (Actual - Dry Aggregate) Asphalt Content (Design - Dry Agg.) Deviation From Design -

Sieve Size
19.0mm
12.5mm
9.5mm
4.75mm
2.36mm
1.18mm
0.600mm
0.300mm
0.150mm
0.075mm
Pan

Sieve Size
19.0mm
12.5mm
9.5mm
4.75mm
2.36mm
1.18mm
0.600mm
0.300mm
0.150mm
0.075mm

Average
Uncorrected
Gradation Sams.
1, 2 & 3
% Pass
100
95.3
82.4
62.5
45.0
33.7
23.7
13.4
7.9
5.16

Correction
Factor
%+/0.0
-2.1
-1.1
-0.7
-1.4
-2.3
-3.6
-2.7
-0.5
0.57

Corrected Avg.
Gradation
% Pass
100
93.2
81.4
61.8
43.6
31.4
20.1
10.7
7.4
5.72

Job Mix
Formula
% Pass
100
92.8
79.4
61.2
43.5
32.4
20.6
12.5
8.1
5.55

Deviation
from Job Mix
Formula
%+/0.0
-0.4
-2.0
-0.6
-0.1
1.0
0.5
1.8
0.7
-0.17

Uncorrected
Average
% Pass
100.0
95.3
82.4
62.5
45.0
33.7
23.7
13.4
7.9
5.16

Uncorrected
Gradation
Sample #1
% Pass
100.0
95.4
81.2
61.6
44.7
33.8
23.7
13.4
7.9
5.11

Uncorrected
Gradation
Sample #2
% Pass
100.0
95.4
83.0
63.3
45.9
34.4
24.0
13.4
7.8
5.05

Uncorrected
Gradation
Sample #3
% Pass
100.0
95.1
83.1
62.6
44.2
33.1
23.3
13.4
8.0
5.31

Corrected
Deviation
From J.M.F
Sample #1
% Pass
0.0
0.5
0.8
-0.2
-0.2
-0.9
-0.5
-1.8
-0.8
0.13

Average Content
Sub Lots 1, 2 & 3

5.48
5.50
-0.02

ok
ok

ok

ok
Corrected
Deviation From
J.M.F Sample
#2
% Pass
0.0
0.5
2.6
1.4
1.0
-0.3
-0.2
-1.8
-0.9
0.07

Corrected
Deviation
From J.M.F
Sample #3
% Pass
0.0
0.2
2.6
0.7
-0.7
-1.6
-0.9
-1.8
-0.6
0.32

Pan

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Degree of Compaction From Test Cores
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day

DATE SAMPLED:
DATE TESTED:
LOT #:
Contractor:
Q.C. - Consultant:

2003-Month-Day
2003-Month-Day
M-1
Acme Contracting
Smith Consulting Inc.

Vol.

Daily Standard

Degree of

C-B

C-B

Rel Density

Compaction

782.7

330.4

2.357

2.356

100.05

472.3

820.0

347.7

2.343

2.356

99.44

431.6

761.3

329.7

2.279

2.356

96.75

Core

Station

Off set from

Depth of

Mass in Air

Mass in Water

Mass in Air

No.

No.

Hwy #3

Dotted WL

Cores

A-23 - (7) - 1

9.908

2.7

46

778.8

452.3

A-23 - (7) - 2

11.035

1.9

47

814.6

A-23 - (7) - 3

11.531

1.7

46

751.5

Left

Right

Type of Drill:
Cores Drilled By:

Rel Density
in Place
A

SSD

Smith Con
Core #

Lki

Cores Drilled By:

Cut

Total =

6.98

Total =

296.24

Avg. =

2.326

Avg. =

98.75%

Ministry of Transportation

to Contractor - Appendix 502 EPS


cification For Asphalt Pavement Construction
ee of Compaction From Test Cores
1 to 1

100mm
Dusty

Remarks

Sec - A - Main Street

Cores 1, 2 & 3

Ministry of Transportation
Report to Contractor - Appendix 502 EPS
End Product Specification For Asphalt Pavement Construction
Ignition Oven Calibration
PROJECT #:
DESCRIPTION:
MATERIAL:
LAB TECH:
DATE PAVED:
DATE SAMPLED:
DATE TESTED:
LOT #:

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Class 1 Medium Mix
Lab Tech.: J-Mac
2003-Month-Day
2003-Month-Day
2003-Month-Day
M-1

Sieve Size
Target
(SI)
Gradation

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan

Contractor: Acme Contracting


Project Supervisor: Pro. Supervisor - Name
Contractor Rep.: Superintendent - Name

100.0
92.8
79.4
61.2
43.5
32.4
20.6
12.5
8.1
5.55

Variation
Limits

4.5
4.5
4.5
4.0
4.0
3.5
2.5
1.5
1.00

Washed Mix Design Samples


Sieve Size

% Pass

% Pass

% Pass

(SI)

Cal #1
(Wash)

Cal #2
(Wash)

Cal #3
(Wash)

Calibration
Average
(Wash)

Design
Wash

100.0
100.0
94.3
82.1
62.9
46.0
35.7
26.0
14.9
8.1
4.95

100.0
100.0
94.6
81.6
62.4
45.2
36.0
26.4
15.7
8.8
5.35

100.0
100.0
94.8
82.5
62.5
45.8
36.0
25.8
14.9
8.5
3.78

100.0
100.0
94.6
82.1
62.6
45.7
35.9
26.1
15.2
8.5
4.69

100.0
92.5
81.0
61.9
44.3
33.6
22.5
12.4
7.9
5.26

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan

Washed Ignition Oven Calibration Samples (Burnt)


Sieve Size

% Pass

(SI)

Cal #1
Burnt
(Wash)

25.0
19.0
12.5
9.5
4.75
2.36
1.18
0.600
0.300
0.150
0.075
Pan

100.0
100.0
94.3
82.1
62.9
46.0
35.7
26.0
14.9
8.1
4.95

% Pass

% Pass

Cal #2 Burnt Cal #3 Burnt Calibration


(Wash)
(Wash)
Average

100.0
100.0
94.6
81.6
62.4
45.2
36.0
26.4
15.7
8.8
5.35

100.0
100.0
94.8
82.5
62.5
45.8
36.0
25.8
14.9
8.5
3.78

100.0
100.0
94.6
82.1
62.6
45.7
35.9
26.1
15.2
8.5
4.69

Design
Wash

Correction
Factor

100.0
100.0
92.5
81.0
61.9
44.3
33.6
22.5
12.4
7.9
5.26

0.0
-2.1
-1.1
-0.7
-1.4
-2.3
-3.6
-2.7
-0.5
0.57

Gradation Limits

100.0
88.3
74.9
56.7
39.5
28.4
17.1
10.0
6.6
4.55

100.0
97.3
83.9
65.7
47.5
36.4
24.1
15.0
9.6
6.55

of Transportation

ractor - Appendix 502 EPS


n For Asphalt Pavement Construction
n Oven Calibration

12345 - Hwy #1 - Cityname


Asphalt Surfacing - E.P.S.
Paving Date:
Performed by:

Note :
Mix Sample 1 of 3
Before Burning
After Burning

Mix Sample 2 of 3
Before Burning
After Burning

Mix Sample 3 of 3
Before Burning
After Burning

CG + S

CG + S

CG + S

CG + S

CG + S

Cg

Cg

Cg

Cg

Cg

Cg

Net

Net

Net

Net

Net

Net

B Time:

B Time:

Wash Sieve Analysis

CG + S

B Time:

Wash Sieve Analysis

Wash Sieve Analysis

Before

Loss

Before

Loss

Before

Loss

After

Screened

After

Screened

After

Screened

Tot

Tot

Tot

Sieve

Wt.

Sieve

Wt.

Sieve

Wt.

Size

Ret.

Retained

Passing

Size

Ret.

Retained

Passing

Size

Ret.

Retained

Passing

19.0

19.0

19.0

12.5

12.5

12.5

9.5

9.5

9.5

4.75

4.75

4.75

2.36

2.36

2.36

1.18

1.18

1.18

0.600

0.600

0.600

0.300

0.300

0.300

0.150

0.150

0.150

0.075

0.075

0.075

PAN

PAN

PAN

Tot.

Tot.

Tot.

Core
No.

Sta.

Depth

o/s

mm

CL

Remarks

Mass in Water

S.S.D.

Weight in Air: (Dried to Weight in Air: (Before in


Constant Weight)
Water)

Remarks

Weighing to Constant Wt. Includes pan and spoon weight


Pan

Pan +

Pan+Spoon

No.

Spoon

+ Sample

Time
Remarks

P+S+S

P+S+S

P+S+S

P+S+S

P+S+S

P+S+S

P+S+S

P+S+S

P+S+S

Remarks

You might also like