Preliminary Estimated Time For Silo Dia. 8000 Qty 1: S.NO. Operation Detail Days Hours Sub Total Remarks

You might also like

Download as ods, pdf, or txt
Download as ods, pdf, or txt
You are on page 1of 1

Sheet1

Preliminary Estimated Time For Silo dia. 8000


S.NO. Operation Detail Scaffolding Lay out jig for Shell 1 Preparation Lay out Jig for 3 cones Sub Total Beams & Chanel s Plates For Cone Plates For Thrust Collar Roof Cover 2 Cutting Ladder + Hand rail Sub Total Cone # 1 Cone # 2 Cone # 3 Shell 3 Rolling 5 Nos. Chanels Pipe + Re inf. Plate. Sub Total Fit up Shells Fit up Cone # 1 Fit up Cone # 2 Fit up Cone # 3 Assembly Cone Fit up Thrust Collar Fit up Roof + Ladder Fit up Chanel 4 Fabrication Fit up Beams Sub Total Shell No 1 & 2 Shell No. 3 , 4 , 5 Cone # 1, 2 & 3 Thrust Collar Roof Cover 5 Ladder + Hand rail Sub Total Silo Shell Cone Roof Cover 6 Sand Blasting Ladder + Hand rail Sub Total Silo Shell Cone Roof Cover 7 Painting Ladder + Hand rail Sub Total Scaffolding Cone assembly 8 Installation Shell assembly Sub Total 6 6 6 2 2 2 96 96 96 3 3 3 3 2 1 1 2 48 24 24 48 4 3 3 3 4 2 1 1 128 48 24 24 8 3 4 4 4 4 4 4 4 4 6 4 4 3 3 5 3 3 3.5 4 3 3 2 1 3 4 6 4 3 3 320 72 96 112 128 96 96 64 32 3 3 3 3 3 3 1 1.5 1.7 7 5 1 24 36 41 168 120 24 2 2 2 4 4 1 4 2 2 2 16 64 32 64 64

Qty = 1
Hours 96 48 144 Sub Total REMARKS

No. of labors
6 3 3

Days 2 2 6

288

240

413

1016
96 192 192 128 72 72

Welding & Grinding

752

224

144

288

3365