gfdggggggggggg

Shop III

The chasis of the vehicle is startes from here at this shop-3. The frames of the wheels are fixed together to be sent on the chasis assembly. The skids are mounted on the conveyor belt and frame is placed on the skids. And frame MTG on which is mounted is fixed across the two frames. On the rear end of the frame BKTS both sides are aligned with taper pin. Fit and tight FSR and BKTS on the both sides with dummy bolts. Tilt both the fsms to 90 degree by turning tackle and insert damps. Tight and apply torque to the engine MTG Flinches and M12 with bolts. Correspondingly in every stage each workers tight appropriate bolt to the frame before taken to the chasis assembly to make it a complete frame.