To ensure that all drinks are prepared according to managements specifications To guard against excessive costs that can develop in the production process
Method I
1.
2.
Total number of ounces in bottle Standard portion size (ounces) = Number of drinks per bottle Cost of bottle Result from Step 1 = Standard drink cost
Method II
1.
2.
Cost of bottle Total number of ounces in bottle = Cost per ounce Result from Step 1 Standard portion size = Standard drink cost