Production Engineering Project Schedule: Door Mirror
Production Engineering Project Schedule: Door Mirror
Production Engineering Project Schedule: Door Mirror
NP
New
CATEGORIES
No.
JRS
Job Name
Imp.
Rep.
60~90
40~60
Days
Days
60~90
40~60
Days
Days
60~90
40~60
Days
Days
60~90
40~60
Days
Days
New Project
DOOR MIRROR
1.1) Assembly
Jig
New
1.2) Final
Tester
New
1.3) Packaging
New
1.4) CPCPK
New
P2-30A GSC
Door Trim
New
0.30
0.30
1.00
2.00
0.30
0.30
Door Trim
0.30
1.00
1.00
3.00
PRODUCT
Proj
PREPARATION
CATEGORIES
Design Input
(drawing,part)
Study Concept
14~21
7~14
60~90
Days
Days
Days
Engineer
Engineer & TA
14~21
7~14
60~90
Days
Days
Days
Engineer
Engineer & TA
14~21
7~14
60~90
Days
Days
Days
Engineer
Engineer & TA
14~21
7~14
60~90
Days
Days
Days
Engineer
Engineer & TA
1.30
4.00
0.45
2.00
5.00
PRODUCTION ENGINEERING
Project Schedule
WORK REQUIREMENT
EPARATION
DOCUMENTATION
Design Review
Doc.
(IWO,Drawing,BOM,PPS)
Capex
13
14
Engineer
Engineer
BU
Engineer
Engineer
BU
N/A
TA
TA
N/A
N/A
TA
TA
N/A
ING
WORK REQUIREMENT
NTATION
Fabrication Activity
Purchase Material
Fabrication Activity
(Mechanical & Electrical)
15
28
Installation
12
30
Purchasing
TA
45
Purchasing
TA
N/A
N/A
TA
N/A
N/A
TA
1st Trial
Modification
20
23
28
Eng & TA
TA
Eng & TA
Eng & TA
TA
Eng & TA
Eng & TA
TA
Eng & TA
Eng & TA
TA
Eng & TA
MANPOWER REQUIREMENT
ENGINEER
TA
TOTAL DAYS
57
80
14
14
GENERAL MAINTENANCE
NO
REQ. NO.
7/1/2013
19706
nil
20166
19096
7/2/2013
19096
19405
7/3/2013
7/4/2013
puran
7/5/2013
7/8/2013
7/9/2013
19435
19203
########
3516
11.7.2013
JOB DESCIPTION
Morning briefing
Air cond problem
install check sheet
install top mirror
Install 'EXIT' sign
Install flag
Install 2 units emergency light
Morning briefing
Install 'EXIT' sign
Install 2 units emergency light
Do wiring and install pendeflour
lamp, wall fan and spot light
Check water at toilet
Check air cond problem
Repair lamp
Do wiring at new bridge at parking motor
Morning briefing
Checking and repairing water tank
Follow supplier servicing air cond
Checking and repair GI pipe
Change bulb and starter assy at column assy
Morning briefing
check pipe no water
cleaning engineering store
Do wiring and install pendeflour
lamp, wall fan and spot light
Morning briefing
Check and repair no water
Update document and do costing
Morning briefing
check water piping pvc
install led light 58 units
wiring damages/trip
No water at toilet
install led light 58 units
Install insulator for piping
To cleaning the engineering store
Morning briefing
to update and check old costing
to do maintenace document and costing
Do wiring and add plug point
Morning briefing
arrange document maintenance
COUNTERMENSURE
Replace remote
3516
LOCATION
START
END
DURATION
reference
zumaddin puran
1.00
0.30
0.30
2.05
0.30
0.30
1.13
0.30
0.50
0.00
6.10
8.00
9.00
10.00
11.30
2.00
15.00
16.00
8.00
8.30
9.00
10.00
11.00
14.00
3.00
16.00
17.45
8.30
9.30
1.00
1.00
1.00
3.30
1.00
1.00
1.45
0.30
1.00
9.30
21.00
12.20
amirul
1.00
0.30
0.30
2.05
0.30
0.30
1.13
0.30
0.50
0.00
6.10
Injection
IT
Assembly
8.00
9.00
12.00
9.00
10.00
21.00
1.00
1.00
9.00
0.30
0.30
4.50
0.30
0.30
4.50
Toilet account
QMD,PPC
8.00
8.30
11.30
8.30
11.00
14.00
0.30
2.70
2.70
cd store
Engineering
hostel plant 2
17.00
8.00
8.30
10.30
12.30
17.45
8.30
10.30
11.30
21.15
0.45
0.30
2.00
1.00
9.25
8.00
8.30
11.30
8.00
9.00
10.00
11.30
12.30
14.00
16.00
18
8.00
8.30
13.00
16.00
8.00
8.30
8.30
11.30
20.00
9.00
10.00
11.00
12.30
14.00
16.00
17.45
20
8.30
13.00
16.00
17.45
8.30
10.00
0.30
3.00
8.70
1.00
1.00
1.00
1.00
2.10
2.00
1.45
2.00
0.30
5.10
3.00
1.45
0.30
2.10
0.30
1.35
1.35
0.00
0.23
0.30
1.00
0.50
4.63
0.00
0.30
1.50
4.35
1.00
0.30
0.30
0.30
1.05
1.00
1.13
1.00
0.30
2.55
1.50
1.13
0.15
1.05
0.30
1.35
1.35
0.00
0.23
0.30
1.00
0.50
4.63
0.00
0.30
1.50
4.35
1.00
0.30
0.30
0.30
1.05
1.00
1.13
1.00
0.30
2.55
1.50
1.13
0.15
1.05
Magnavision
Injection toilet
injection &painting
Account
qmd
Account
Engineering
marketing
main office
plant 2 office
main office
rd store
rd store
rnd
crushing room
main office
rnd
main office
rnd
hrd
plant 2
10.00
12.00
12.30
13.30
11.30
12.30
13.30
17.45
8.00
9.00
10.30
14.30
15.30
8.00
8.30
9.30
10.30
11.30
13.30
15.15
8.00
8.30
9.00
13.00
15.15
8.00
8.30
9.30
11.00
12.00
8.00
8.30
9.30
10.00
13.00
14.00
8.00
8.30
10.15
13.30
8.00
8.30
9.30
12.00
13.00
8.00
8.30
10.00
9.00
10.30
13.00
15.30
17.45
8.30
9.30
10.30
11.00
13.30
15.00
19.00
8.30
9.00
12.00
15.00
17.45
8.30
9.30
11.00
11.30
17.45
8.30
9.30
10.00
13.00
14.00
17.00
8.30
10.00
13.00
17.45
8.30
9.30
12.00
13.00
17.45
8.30
10.00
15.00
1.30
0.30
1.00
4.15
0.00
1.00
1.30
3.10
1.00
2.15
0.30
1.00
1.00
1.30
2.00
2.10
4.25
0.30
0.30
3.00
2.00
2.30
0.30
1.00
2.30
0.30
5.45
0.30
1.00
0.30
3.00
1.00
3.00
0.30
2.30
3.25
4.15
0.30
1.00
3.30
1.00
4.45
0.30
3.30
5.00
170.50
1.05
0.15
0.30
2.08
0.00
1.00
1.05
1.55
0.30
1.08
0.30
0.50
0.50
0.65
1.00
1.05
2.13
0.15
0.15
1.50
1.00
1.15
0.15
0.50
1.15
0.15
2.73
0.15
0.50
0.15
1.50
0.50
1.50
0.15
1.15
1.63
2.08
0.15
0.50
1.65
0.50
2.23
0.15
1.65
2.50
87.87
1.05
0.15
0.30
2.08
0.00
1.00
1.05
1.55
0.30
1.08
0.30
0.50
0.50
0.65
1.00
1.05
2.13
0.15
0.15
1.50
1.00
1.15
0.15
0.50
1.15
0.15
2.73
0.15
0.50
0.15
1.50
0.50
1.50
0.15
1.15
1.63
2.08
0.15
0.50
1.65
0.50
2.23
0.15
1.65
2.50
87.87
Vehicle
NO
REQ. NO.
JOB DESCIPTION
7/1/2013
morning briefing
do costing month 6
change battery new
COUNTERMENSURE
LOCATION
START
8.00
END
DURATION
8.30
0.30
NO
PREPARATION
CATEGORIES
Component Part
A
TOOL
PART
WORK REQUIREMENT
DOCUMENTATION
TESTING
JOB SHEET
MANPOWER
REQUIREMENT
TOTAL HOURS
5S
SUPR
TA
0
1
1
1
1
1
1
1
1
1
2
2
1
0.55
0.55
1.55
1.90
1.05
2.90
1.05
4.90
1.20
0.70
2.05
0.75
3.50
1.40
4.05
0.75
6.20
2.40
6.05
1.45
9.90
0.40
1.05
1.05
1.05
1.75
2.75
0.85
0.18
0.85
1.55
3.90
2.90
0.80
0.40
1.05
1.05
1.05
2.75
2.75
0.85
0.18
0.85
1.55
4.90
2.90
0.80
0.40
1.05
1.15
1.05
2.75
2.75
0.85
0.18
0.85
1.85
4.90
2.90
0.80
A. WIRING
1 m~5m
LENGTH
5m~10m
>10m
SINGLE PHASE
DISMANTLE
0.30
0.30
1.30
0.10
0.00
0.00
0.00
0.15
2
3
INSTALL NEW
TROUBLE SHOOTING AND MINOR CORRECTION
1.00
0.30
2.00
0.30
4.00
0.45
0.10
0.10
0.30
0.30
0.30
0.30
0.05
0.05
0.15
0.00
1
2
3
DISMANTLE
INSTALL NEW
TROUBLE SHOOTING AND MINOR CORRECTION
0.30
1.00
0.30
1.00
3.00
0.30
2.00
5.00
1.00
0.10
0.10
0.10
0.00
0.30
0.00
0.00
0.30
0.30
0.00
0.05
0.05
0.30
0.30
0.00
> 2.0 HP
0.20
0.30
0.40
0.30
2.00
2.00
0.30
0.10
0.30
1.30
4.00
2.00
0.30
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.01
0.10
0.10
0.10
0.10
0.10
0.00
0.30
0.30
0.30
0.30
0.30
0.10
0.01
0.10
0.10
0.30
0.30
0.10
0.00
0.15
0.15
0.15
0.15
0.15
0.15
0.01
0.15
0.15
0.30
0.30
0.15
0.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.00
0.15
0.15
0.15
0.15
0.10
THREE PHASE
B. AIR CONDITIONER
1
2
3
4
5
6
7
8
9
10
11
12
13
TROUBLE SHOOTING
AIR COND INADEQUATE COOLING
CONDENSER ISN'T RUNNING
UNIT RUNS BUT DOESN'T COOL
UNITS SHUTS ON AND OFF REPEATEDLY
PERIODICAL SERVICE
TOP UP GAS
REMOTE PROBLEM
WATER BLOCK AND LEAK
REMOVE AND INSTALL NEW MOTOR FAN
REMOVE AND INSTALL NEW AIR COND UNIT.
REMOVE AND INSTALL NEW COMPRESSOR
WIRING PROBLEM ON AIR COND UNITS
1.0HP
0.20
0.30
0.30
0.30
1.00
2.00
0.30
0.10
0.30
1.00
3.00
2.00
0.30
CAPACITY
1.5HP
0.20
0.30
0.30
0.30
2.00
2.00
0.30
0.10
0.30
1.00
4.00
2.00
0.30
TROUBLE SHOOTING
REMOVE AND INSTALL NEW FLOURECENT LAMP
REMOVE AND INSTALL NEW BULB
REMOVE AND INSTALL NEW SWITCHES
REMOVE AND INSTALL NEW PLUG
REMOVE AND INSTALL NEW ALARMS
REMOVE AND INSTALL NEW SPORT LIGHT
REMOVE AND INSTALL NEW FAN
REMOVE AND INSTALL NEW EKSZOS FAN
REMOVE AND INSTALL NEW FUSES
0.15
0.10
0.10
0.15
0.15
0.20
0.20
0.20
0.30
0.10
0.00
0.05
0.00
0.10
0.10
0.10
0.10
0.10
0.10
0.05
0.00
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.00
0.01
0.01
0.01
0.01
0.10
0.05
0.01
0.01
0.01
0.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.00
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.00
0.10
0.30
0.30
0.30
0.30
0.30
0.30
0.00
0.01
0.05
0.01
0.00
0.05
0.01
0.05
0.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.00
0.01
0.10
0.10
0.20
0.10
0.10
0.20
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.30
0.10
0.10
0.20
0.15
0.00
0.00
0.20
0.00
0.20
0.20
0.10
0.30
0.00
0.10
0.30
0.20
0.30
0.15
1
1
1
1
1
1
1
1
1
0.15
0.36
0.31
0.46
0.46
0.60
0.55
0.51
0.61
0.36
0
1
2
1
2
1
1
1
0.15
0.42
1.60
1.56
1.65
0.90
1.56
1.00
0
2
2
1
1
2
1
1
2
1
2
1
2
2
1
1
2
2
1
1
0.25
3.75
1.55
0.95
2.35
1.61
0.56
0.56
1.65
0.56
0.95
1.66
0.66
1.75
0.55
0.65
1.45
2.65
2.45
1.30
TROUBLE SHOOTING
REMOVE AND INSTALL NEW VALVE
REMOVE AND INSTALL NEW PVC PIPE
REMOVE AND INSTALL FLOATER
REMOVE AND INSTALL NEW SINK
REMOVE AND INSTALL WATER PUMP
REPAIR WATER LEAKING BETWEEN JOINNING
REPAIR BLOCKING DRAINAGE
0.15
0.15
1.00
1.00
1.00
1.00
0.30
1.00
E. BUILDING
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TROUBLE SHOOTING
PAINTING JOBS <10'/ SQURE FEET
REPAIR ROOF
REPAIR AUTO GATE (DAMAGE WIRE, DAMAGE GEAR/PINION,NO POWER)
REPAIR AND CLEANING BLOCKED DRAINAGE
REPAIR WINDOWS
REPAIR OFFICE CHAIR
REPAIR OFFICE TABLE
REPAIR AND CLEANING MINOR DAMAGE FLOOR
REMOVE AND INSTALL NEW DOOR LOCK
DISMANTLE AND INSTALL NEW GLASS
DISMANTLE AND INSTALL NEW WINDOWS
DISMANTLE AND INSTALL NEW DOOR
DISMANTLE JOB LIKE'S OLD RACK,CABINET.
INSTALL SIGNED, FLAG AND BANNER
INSTALL WALL PLUG, FITTING FOR MULTIPURPOSE JOBS
MINOR REPAIR ROOM (REMOVE WALL, PARTITION)
MINOR REPAIR CARPET (CUTTING,INSTALL) <10'
CUTTING AND TRIMMING PLANT,TREE
CLEANING THE TOILET
0.15
3.00
1.00
0.30
2.00
1.00
0.30
0.30
1.00
0.30
0.30
1.00
0.30
1.00
0.30
0.10
1.00
2.00
2.00
1.00
0.1
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.30
0.30
0.30
0.00
0.30
0.10
0.10
0.30
0.10
0.30
0.30
0.10
0.30
0.10
0.30
0.00
0.30
0.00
0.00
0.00
0.00
0.10
0.00
0.01
0.01
0.01
0.00
0.01
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
0.10
0.10
0.10
0.00
0.30
0.30
0.00
0.10
0.00
0.01
0.01
0.00
0.10
0.05
0.05
0.05
0.05
0.20
0.20
0.20
0.00
3.00
8.00
4.00
0.10
0.30
F. IT AND COMUNICATION
1
2
3
4
5
TROUBLE SHOOTING
DISMANTLE AND INSTALL NEW CABLE NETWORK WITH EXTENSION
DISMANTLE AND INSTALL NEW CABLE TELEPHONE WITH EXTENSION
REPLACE NON FUNCTIONAL CABLE
INSTALL NEW SERVER,WIFI POINT
1 m~5m
0.15
0.30
0.30
0.10
0.30
LENGTH
5m~10m
0.15
0.30
0.30
0.30
>10m
0.15
0.45
0.45
0.45
1
1
1
1
0.25
0.96
0.96
0.45
0.65
23.40
G. FABRICATION
SPECIAL PROJECT AS PER REQUEST
8.00
NO
PREPARATION
CATEGORIES
Component Part
A
TOOL
PART
WORK REQUIREMENT
DOCUMENTATION
TESTING
JOB SHEET
MANPOWER
REQUIREMENT
TOTAL HOURS
5S
SUPR
TA
A. DIESEL LOORY
MODEL
1TON
1
2
TROUBLE SHOOTING
SPECIAL SERVICE FOR PUSPAKOM
0.15
2.00
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
0.10
0.05
0.10
0.10
0.30
1.00
1.30
1.00
1.00
1.00
0.30
0.10
1.00
0.15
2.00
0.10
B. FOLKLIFT
1
2
3
4
5
6
7
8
9
10
11
TROUBLE SHOOTING
BLEEDING GAS SYSTEM
JUMPER START
REMOVE AND INSTALL BATTERY
REMOVE AND INSTALL LPG GAS TANK
REMOVE AND INSTALL HYDRAULIC PUMP
REMOVE AND INSTALL HYDRAULIC HOSE
REMOVE AND INSTALL TYRE
REMOVE AND INSTALL BATTERY
GREASING
BODY WASH
0.00
NO
PREPARATION
CATEGORIES
Component Part
A
TOOL
PART
WORK REQUIREMENT
DOCUMENTATION
TESTING
JOB SHEET
MANPOWER
REQUIREMENT
TOTAL HOURS
5S
SUPR
TA
A. DIESEL LOORY
MODEL
1TON
1
2
TROUBLE SHOOTING
SPECIAL SERVICE FOR PUSPAKOM
0.15
2.00
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
0.10
0.05
0.10
0.10
0.30
1.00
1.30
1.00
1.00
1.00
0.30
0.10
1.00
0.15
2.00
0.10
B. FOLKLIFT
1
2
3
4
5
6
7
8
9
10
11
TROUBLE SHOOTING
BLEEDING GAS SYSTEM
JUMPER START
REMOVE AND INSTALL BATTERY
REMOVE AND INSTALL LPG GAS TANK
REMOVE AND INSTALL HYDRAULIC PUMP
REMOVE AND INSTALL HYDRAULIC HOSE
REMOVE AND INSTALL TYRE
REMOVE AND INSTALL BATTERY
GREASING
BODY WASH
0.00