HARDROCK FABRICATION PVT. LTD.

A-33/34, PHASE VI, GAMHARIA, JAMSHEDPUR

ANNEXURE A2
ENVIRONMENTAL MONITORING TEST
FREQUENCY SAMPLING DURATION DAY TIME FOR NOISE LEVEL NIGHT TIME FOR NOISE LEVEL METHODOLOGY RESPONSIBILITY : : : : : : QUARTERLY 8 Hrs. / As per PCB & Factory Act 6:00 A.M. TO 10:00 P.M. 10:00 P.M. TO 6:00 A.M. AS PER JSPCB / CPCB NORMS EMR

1. 2. 3. 4.

EFFLUENT WATER QUALITY DRINKING WATER QUALITY AMBIENT AIR QUALITY WORK ZONE AIR QUALITY * FOR SHOP FLOOR * SHOT BLASTING * PAINT SHOP

5. 6. 7.

DG STACK EMISSION TEST PAINT SHOP STACK EMISSION TEST NOISE LEVEL MONITORIN * FOR PLANT SURROUNDING * FOR DG SET SURROUNDING

Prepared by Designation EMR

Approved by Designation Managing Director