H.

Q OF MILITARY WORKS

1. SCOPE:The scope of this calculation comprises of Analysis and Design of H.Q of Military Works at Sweihan Airbase. 2. Basic Information:2.1 Codes, Standards and References 1 BS5950-1:2000 2 BS6399-Part 2:1997 2.2 Reference Document
Architectural Drawing from client

2.3 Loading Basis


Dead Load: Dead Load on Roof = 0.25 kN/m Live Load:Live Load = 0.75 kN/m Wind Load:Wind Speed = 160 Kmph Crane Load:1) S21111_N_AAG_AIRCR.M.HANGAR Crane Capacity = 5T Space between Crane Rail = 21 m (Assume) Weight of Crane = 60kN (Assume) Weight of Crab = 15kN (Assume) Minimum Hook Approach = 0.7m (Assume) End carriage wheel centre = 3.15m (Assume) Type of Crane = Electric Overhead (Assume) Only one Crane can be move in the specified crane area (Assume)
2 2

2)

S21111_O_SAR_MAINT.HANGAR Crane Capacity = 10T Space between Crane Rail = 38 m (Assume) Weight of Crane = 140kN (Assume) Weight of Crab = 18kN (Assume) Minimum Hook Approach = 0.805m (Assume) End carriage wheel centre = 3.15m (Assume) Type of Crane = Electric Overhead (Assume) Only one Crane can be move in the specified crane area (Assume)

2.4 Primary Load Cases


DEAD LOAD LIVE LOAD WIND X (+Cpi) WIND X (-Cpi) WIND Z (+Cpi) WIND Z (-Cpi) CRANE LOAD

2.5 Load Combinations


9 9 9 9 9 9 9 9 9 9 9 DL+LL DL + WL 0.8DL+0.8LL+0.8WL DL+CL 0.8DL+0.8LL+0.8CL 1.4DL+1.6LL DL+1.4WL 1.2DL+1.2LL+1.2WL 1.4DL+1.6CL 1.2DL+1.4LL+1.4CL 1.2DL+1.2WL+1.2CL