Professional Documents
Culture Documents
512-E Soeder 1
512-E Soeder 1
HAASE Energietechnik AG
Gadelander Strasse 172 D-24531 Neumuenster, Germany Telefon +49 (4321) 878-0 Telefax +49 (4321) 878-29 eMail: info@haase-energietechnik.de www.haase-energietechnik.de
Soeder Estate, Lower Saxony, built in 2007 Wet fermentation of rye and pigs manure acc. to Renewable Energy Sources Act 2 x 1,700m3 volume, mesophilic process control Approx. 2 x 630m3 gas storage volume 5,000m3 volume Biogas Energy Centre, capacity max. 716kWel./ 703kWtherm. Container unit with biogas engine, heat recovery from cooling and exhaust gas, booster, flare, biogas analyser, gas cooling and control system Heating of Soeder Castle, orangery, pigsty Saving max. 5,208t/a of CO2-quivalent acc. to the ASUE und GEMIS/VDEW key figures
FE-512-d/8.2007 Li
Heat utilisation Certified acc. to 19 l WHG and DIN EN ISO 9001 : 2000 CO2 balance