Earthworks-Excavation: Owner: Client: Consultant: Main Contractor: Civil Contractor
Earthworks-Excavation: Owner: Client: Consultant: Main Contractor: Civil Contractor
Client:
Consultant:
Main Contractor:
Civil Contractor:
Earthworks-Excavation
Checks
Items checked
AP
CR
NA
Remarks
Layout, Alignment and Size of Excavation should be marked on the ground as per Excavation sketch
Surveyor marked line & level as per as approved drawings? Area dry for working / Dewatering in place Slopes / Sides Provided as per soil report Area ramps acceptable for access and egress? Proper storage & disposal of surplus? Safety Barriers in place Excavations completed to required levels
The excavated material should be kept away at least 1.50m from the edge of pit/trench. Danger signs should be provided near the excavated area.
For Lahmeyer FOR Toshiba For