Owner:

Client:

Consultant:

Main Contractor:

Civil Contractor:

CIVIL CONTRACTOR: AL BADR CONT & CIVIL CONSTRUCTION CO. L.L.C.


PROJECT: NEW 400/132KV GRID STATION AT BAHIA
Document Title:

Contract: N4611/A & N-7913

QC Check Sheet / Verifying Record

Earthworks-Excavation
Checks

Items checked

AP

CR

NA

Remarks

Layout, Alignment and Size of Excavation should be marked on the ground as per Excavation sketch
Surveyor marked line & level as per as approved drawings? Area dry for working / Dewatering in place Slopes / Sides Provided as per soil report Area ramps acceptable for access and egress? Proper storage & disposal of surplus? Safety Barriers in place Excavations completed to required levels

The excavated material should be kept away at least 1.50m from the edge of pit/trench. Danger signs should be provided near the excavated area.
For Lahmeyer FOR Toshiba For

Sign: Name: Date:

Sign: Name: Date:

Sign: Name: Date:

* AP = Approved * CR= Corrections Required * NA= Not Approved