Material Submittal
Material Submittal
REV.: 2
Proposed Material Alternative Ref. Drawing Document/Spec. Reference Location/Area of Use Manufacturer/Vendor Vendor included in QP PVL
: : : : : : :
PAINT MATERIAL N/A TDOC-9-AG-2002 SHT 1 to 2 QP-SPC-L002 REV.1 TDOC Building Steel Structures Hempel Paints -Qatar YES
NO
Specification Requirements
Remarks Description Specified Proposed
Colour as per QPSPC-L-002 REV.1 Table-6 & 10-A-03 as per BS 4800. (Table-6 attached)
Paint Materials
1Un
1Un
Legend
QP Comments:
Designation With Reference Indicator Lead Project Engineer Senior Project Engineer Others
Approved
Rejected
Date