ENGINEERING REQUEST

(FOR JOBS NOT INVOLVING PROCESS CHANGE)

TD GM
QF-003-00-611

SUBJECT: JOB DEFINITION

(INCLUDE PROBLEM, LIMITATION, BASIC CAUSE, ETC.)

Urea Reactor (R-101) shell course lining is planned in the forth coming turnaround. This shell course is located below 10th tray and numbered as 18th from top. The outlet nozzle of overflow pipe is also present in this shell course. So, a lining scheme with welding procedure is required for the lining of said shell course. Also, there is a suggestion to provide one additional weep-hole in nozzle for complete flushing of this portion. Please advise with drawings and necessary procedures.

PROPOSED SOLUTION
Provide Drawings.

(IF ANY) :

SKETCH

INFORMATION AVAILABLE / DOCUMENTS ATTACHED


123INITIATOR ROUTE DATE INITIALS REVIEWED BY UM E/M-I AUTHORIZED BY Engineering Manager

(IF ANY) :

PRIORITY
URGENT NORMAL ( ( ) )

ASSIGNED TO

SERIAL NO.

HIK

WIB