WBS Code WBS Name Original Budget

ACC ACC - DUBAI Dhs.50,000,000


ACC.1 ENGINEERING Dhs.600,000
ACC. 1.1 GENERAL Dhs.50,000
ACC.1.2 ARCHITECTURE Dhs. 100,000
ACC. 1.3 CIVIL Dhs.50,000
ACC. 1.4 EQUIPMENT Dhs. 100,000
ACC. 1.5 PIPING Dhs. 100,000
ACC. 1.6 ELECTRICAL Dhs. 100,000
ACC. 1.7 INSTRUMENTATION Dhs. 100,000
ACC.2 PROCUREMENT Dhs.34,400,000
ACC. 3 CONSTRUCTION Dhs. 14,000,000
ACC. 3.1 GENERAL Dhs. 1,000,000
ACC. 3.2 CIVIL Dhs.2,250,000
ACC.3.3 MECHANICAL Dhs.7,000,000
ACC.3.3.1 EQUIPMENT Dhs.4,000,000
ACC.3.3.2 PIPING Dhs.3,000,000
ACC.3.4 ELECTRICAL Dhs.2,000,000
ACC. 3.5 INSTRUMENTATION Dhs. 1,750,000
ACC.4 COMMISSIONING Dhs. 1,000,000