INTRODUCTION
Wind Power Company established 1990 Project Installing wind power plant in Kosta Wind energy fastest growing renewable energy source Installed capacity of wind power in India 19564.95 MW (as on 31st Jan 2013) Best sites avg. Annual wind speed above 5.5 m/s (at std. Measurement height of 50 m above ground level) Largest power Plant By Suzlon India, Maharashtra (259 MW)
2
Project Management
PROJECT DESCRIPTION
Feasibility study to develop 50 MW wind power plant in Kosta, Andhra Pradesh Government regulatory body MNRE Area 92,906 sq. km & Population 3.4 crores
Project Management
Project Management
Project Management
TECHNICAL SPECIFICATIONS
6
Wind Turbine type: V100 Rotor Diameter: 100 m Hub Height: 94 m Maximum Capacity: 1.8 MW- 2.0 MW Wind Class: IEC4A Transformer Capacity: 20 kV Voltage: 220 V Frequency : 50 Hz
TRANSPORTATION
Project Management
TRANSPORTATION
Major Ports 1. Visakhapatnam 2. Kakinada
Project Management
TRANSPORTATION
Project Management
TRANSPORTATION
Project Management
10
TRANSPORTATION
Project Management
Transportation and logistics costs which now account for about 4-6 per cent