Energy Pro USA Project Flowchart

You might also like

Download as pdf
Download as pdf
You are on page 1of 1

Project Flow Chart Energy Pro USA

Conduct First 4a   5a
Principle Process / Deliver
Equipment EOM Models
Analysis

2a 3 4b 7a
Create EOM Define
Gather Data 6 8
Identify Processes Models Financial
From Existing 9
1 Systems / Equipment to be 5b Goals
Engineered / Train Client Client Client Approves Identify
Complete Contract Train Project
Personnel on use Approves Project Yes Financial Plan Modifications
Between Client & Modified Yes Personnel
Of EOM Models Analysis Report And Goals That Result In
Energy Pro 2b Create 4c 7b Improved
Conduct Structured 1. Analyze Data Quantitative Design
Process Savings
2. Analyze Project Payback Financial
Interviews with
Interview Calculations Structure
Client Personnel
Information

4d 5c
Create
Define Enhanced
Project Analysis No No
Metering Report
Projects (If Req’d)

No Write 11a
Operating
Procedures 13a Provide 13b
Provide
Daily Monitoring Monthly Monitoring
12 Of Plant-Wide Of Plant-Wide
10 17
Improvement Improvement
11a Shares of
Client Approves
Train
Project
Process Improvements Increased
Final Analysis Yes Personnel Earnings Are
Report
Yield Increased  Provide
Daily Monitoring
13c Provide 13d
Monthly Monitoring Calculated
Of Individual Of Individual
Earnings  Process Processes
Energy Pro 11c Improvement Improvement
Finances and
Implements 18a 18b
Client
Modifications Energy Pro
Records
Modify 16b 16a Generates
Increased
The Model Discover Invoice
14 Earnings
To Accurately Problem With
11d Depict The A Model 15 Model Indicates
Investigate
Stand Alone Capital Process
And Diagnose Yes A Problem
Improvement Projects will be Problem
(A Control Rule
19
Included In “Project Analysis Report. “ 16d 16c
Violation Has
Client Reviews
Resolve Occurred)
Problem Discover Invoice And
These Projects Will Be Implemented With The Problem With Remits Payment
Under Separate Phase II Agreement Process A Process

No

You might also like