TITLE of Project: (On A Separate Title Page. List The Name of The "Project Leader" and The Member With Their

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TITLE of Project: (On a separate title page.

List the name of the project leader and the member with their designated specific task rod man, instrument man, recorder, axe man etc...) Introduction Discuss the hor and vertical control and its use to future surveying operations. Make a story that this will be used in a real survey engineering operation (project). Objectives of the Exercise Enumerate the things that you want to achieve in this exercise. Methodology Discuss the survey operations - traverse and differerential leveling, the formula and mathematical notation and instrumentation. Also discuss the standards and specification and tell the reason why you want to achieve a tertiary project control for this work. Discussion of Result Tabulate the survey measurements for traverse and levelling. Quantify the errors in the measurements and compare to minimum specification for the engineering project. Conclusion For now, just mention that the error in measurement (hor and ver) meets the required specification. To BE CONTINUED...

You might also like