Professional Documents
Culture Documents
Example: Tube Connection With Prestressed Bolts Contact Analysis
Example: Tube Connection With Prestressed Bolts Contact Analysis
Tube Connection
Problem definition
Tube Steel
500 kN
0.01 m
E=2.0E11 Pa
n=0.33
Bolt Steel E=2.0E11 sultimate=800 MPa syield=0.8*800 MPa Prestress 0.06 m 80 % of yield stress Dimension M24
0.12 m 0.36 m
Tube Connection
Two step analysis due to symmetry in load and geometry only 1/16 is modeled Only prestress
Distributed external tube force:
Fy Ftube Atube
symmetry
Tube Connection
Interesting results
Boltstress as a function of external force in the tube von Mises stress plot at 500 kN external force
Tube Connection
Results