Spring 2010

Site Suitability Report C07BF


King Georges Park, Buckhold Road

Please note: Further details are provided in the Final Report on Site Selection Process (doc ref: 7.05) that can be found on the Thames Tideway Tunnel section of the Planning Inspectorates web site.

100-RG-PNC-C07BF-900001 | Spring 2010

Site Suitability Report C07BF


King George's Park, Buckhold Road

THAMES TUNNEL

SITE SUITABILITY REPORT C07BF


LIST OF CONTENTS

Page Number 1 INTRODUCTION 1.1 1.2 1.3 2 Purpose and structure of the report Background Consultation 1 1 1 1 1 2 2 3 3 3 4 4 4 4 5 5 5 5 5 5 6 6 7 7 7 8 8 8 8 9 9 9 9 9 9 9 10 10 10

SITE INFORMATION 2.1 2.2 Site and surroundings Type of site

3 4

PROPOSED USE OF SITE CONSTRUCTION PHASE PROPOSED USE OF SITE OPERATIONAL PHASE 4.1 4.2 Introduction Restoration and after-use

ENGINEERING ASSESSMENT 5.1 5.2 5.3 5.4 Access Construction works considerations Permanent works considerations Health and safety

PLANNING ASSESSMENT 6.1 6.2 6.3 6.4 6.5 Introduction Planning applications and permissions Planning context Consultation comments Planning comments

ENVIRONMENTAL APPRAISAL 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 Introduction Transport Archaeology Built heritage and townscape Water resources hydrogeology and surface water Ecology Flood risk Air quality Noise Land quality

SOCIO-ECONOMIC AND COMMUNITY ASSESSMENT 8.1 8.2 Socio-economic profile Issues and impacts

PROPERTY ASSESSMENT 9.1 9.2 Introduction Crown Land and Special Land comments

100-RG-PNC-C07BF-900001.doc

9.3 9.4 9.5 9.6 9.7 9.8 10

Land to be acquired Property valuation comments Disturbance compensation comments Offsite statutory compensation comments Discretionary purchase costs comments Site acquisition cost assessment

10 11 11 11 11 11 11 11 12 12 12 12 13 14

SITE CONCLUSIONS BY DISCIPLINE 10.1 10.2 10.3 10.4 10.5 10.6 Introduction Engineering Planning Environment Socio-economic and community Property

APPENDICES APPENDIX 1 SOURCES OF INFORMATION APPENDIX 2 SITE LOCATION PLAN APPENDIX 3 PLANNING AND ENVIRONMENT PLANS APPENDIX 4 PHOTOGRAPHS OF THE SITE AND SURROUNDINGS APPENDIX 5 TRANSPORT PLAN APPENDIX 6 SERVICES AND GEOLOGY PLAN APPENDIX 7 CONSTRUCTION PHASE LAYOUT APPENDIX 8 OPERATIONAL PHASE LAYOUT APPENDIX 9 ENVIRONMENTAL APPRAISAL TABLE

100-RG-PNC-C07BF-900001.doc

LIST OF ABBREVIATIONS

AOD BAP BT CPO CSO DLR EA GLA HGV LNR LPA LU m MOL ONS ORN PLA POS PTAL SAM SINC SNCI SSR SSSI SuDS TfL TD TLRN TPA UDP UXO

above Ordnance Datum Biodiversity Action Plan British Telecom compulsory purchase order combined sewer overflow Docklands Light Railway Environment Agency Greater London Authority heavy goods vehicle local nature reserve local planning authority London Underground metre/metres Metropolitan Open Land Office of National Statistics Olympic Route Network Port of London Authority public open space public transport accessibility level scheduled ancient monument site of importance for nature conservation site(s) of nature conservation importance site suitability report site(s) of special scientific interest sustainable urban drainage systems Transport for London tunnel datum Transport for London Road Network Thames Policy Area unitary development plan unexploded ordnance

100-RG-PNC-C07BF-900001.doc

100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

1 1.1 1.1.1

INTRODUCTION Purpose and structure of the report The Site Selection Methodology (May 2009) paper (paragraphs 2.3.29 - 2.3.34) outlines the process to be used to create the preferred list of shaft sites, and this process also applies to CSO sites. Paragraph 2.3.31 lists the type of general considerations that will be addressed in each site suitability report, but they depend on the relevance to the site and professional judgement made in the assessments. This report was prepared through the assessment of information from the perspective of a number of technical disciplines: Engineering, Planning, Environment, Property and Community. The reports have been prepared on the basis of the information listed in Appendix 1 - Sources of Information, and this level of information is considered to be appropriate to the current stage. The Background Technical Paper provides information on the requirements for different site types, their sizes and typical activities/facilities within the sites. Each site suitability report considers a particular site on its own merits. In addition, an engineering options report was produced. Information from both of these reports will feed into the technical assessment of how well the site may fit in with tunnel design options, ensuring combinations of sites spread across the length of the tunnel route provide a reasonable spatial distribution of sites (that will best assist with the construction of the tunnel, operation and maintenance). This is considered in the Preferred Scheme Report. Background The process for selecting sites is set out in the Site Selection Methodology (May 2009) paper. All sites have previously passed through the following parts of Stage 1: Part 1A - Creation of the long list of potential shaft (and CSO) sites Part 1B - Creation of a short list of potential shaft (and CSO) sites o o o Table 2.2: Long list of shaft (and CSO) sites - an assessment against set considerations and values Table 2.3: Draft short list of shaft (and CSO) sites - assessment against a list of detailed considerations Workshops to consider each site to arrive at a short list of sites.

1.1.2

1.1.3 1.1.4

1.2 1.2.1

1.2.2

The final part of Stage 1 includes this report. The following is an overall summary of all elements that apply to all the sites on the final short list: Part 1C - Creation of the Preferred List of shaft (and CSO) sites - site data, site visits, site suitability reports, engineering options report and optioneering workshops that will result in the Preferred Scheme Report.

1.3 1.3.1

Consultation The Thames Water project team held meetings with London local authorities, statutory and other stakeholders to review the provisional short list of shaft and CSO sites. All general and site specific comments can be found in a separate report titled Consultation on the Short List of Sites: Consultation Feedback Report. These comments were considered to help determine the final short list of sites, but they were also considered at the optioneering workshops. Further meetings were held with London local authorities, statutory and other stakeholders between January and March 2010. Comments are included in this report.

1.3.2

Page 1
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

2 2.1 2.1.1

SITE INFORMATION Site and surroundings This site is one of the shortlisted sites for Frogmore Storm Relief - Buckhold Road CSO. This section provides an overview of all the site information that will be used by one or more disciplines to assess the site in sections 3 to 9 of this report. Site C07BF would occupy the northern tip of King Georges Park, adjacent to the entrance from Buckhold Road at the junction with Neville Gill Close, and within the London Borough of Wandsworth. A site location plan is attached as Appendix 2. The area is generally mixed, with Wandsworth Town Centre located 100m to the north, and Southside Shopping Centre to the east of the park beyond Neville Gill Close. The Business Village is located to the northwest of the site and residential properties within Park View Court to the west. King Georges Park extends to the south, and there is a residential terrace which fronts onto Buckhold Road which adjoins the site. King Georges Park includes a childrens nursery, recreational facilities, a lake and open spaces. The nearest residential properties are located approximately 30m from the working area and are separated by Buckhold Road. The site is located within an archaeological priority area, and Wandsworth Town Conservation Area is located 100m north of the site. Green Chains and links pass through the local centre, following the route of the River Wandle. All the mapped designations are shown on the planning and environment plans in Appendix 3. Photographs of the site and surroundings, together with an aerial photograph of the site, are attached as Appendix 4. Access could be provided from Neville Gill Close, which is off the A218 (Buckhold Road). The site is a short distance from the A3 and 2.3km from rail access, using the route A3 and A3036. East Putney London Underground station and Wandsworth Town rail station are less than 1.5km from the site. There are no wharfage/jetty facilities at the site and it is unlikely that any are available within a reasonable distance from the site. A transport plan for the site is attached as Appendix 5. Third-party assets and significant utilities are listed below and are shown on the services and geology plan in Appendix 6: Residential building in the northwest Albion House Major multi-storey building to the northeast Mature trees.

2.1.2

2.1.3

2.1.4 2.1.5

2.1.6 2.1.7

2.1.8

2.1.9

The locations of other third-party assets, such as BT and fibre-optic communication cables, are to be confirmed by further studies and utility searches and may not be shown on the services and geology plan.

2.1.10 Information on the geology specific to this site can be found within the services and geology plan, which is in Appendix 6. This plan shows that the shaft would be founded in London Clay. 2.1.11 It is understood that National Grid is planning to build the proposed Wimbledon to Kensal Green cable tunnel, which would run through the middle of the site. If this site is selected, there would be dialogue with National Grid to consider matters if applicable (such as timing, engineering constraints, cumulative effects of the projects, potential for site sharing, etc). 2.2 2.2.1 Type of site The site C07BF is being considered as: a large CSO site to intercept the Frogmore Storm Relief Sewer CSO a small CSO site to intercept the Frogmore Storm Relief Sewer CSO.

Page 2
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

3 3.1.1 3.1.2

PROPOSED USE OF SITE CONSTRUCTION PHASE The proposed construction phase layouts for the CSO site are located in Appendix 7 Construction Phase Layout, and are based on a preliminary assessment. The construction phase layout drawings are illustrative and show: the layout as a large CSO site the layout as a small CSO site potential access points.

3.1.3

These drawings provide initial preliminary schematic layouts that have not been optimised. If the site proceeds to the next stage as a preferred site, construction phase layouts would be optimised to minimise impacts. Preliminary data associated with the construction phase are provided in Table 3.1 and are common to both the large and small site scenarios. Table 3.1 Construction phase data Activity Length of construction period Likely working hours, ie, (night/day/weekend) Working days Primary means of transporting excavated material away from site Primary means of transporting materials to site CSO site 0.5 to 2 years 12 hrs from 7am to 7pm Mon to Sat Road Road

3.1.4

4 4.1 4.1.1 4.1.2

PROPOSED USE OF SITE OPERATIONAL PHASE Introduction The indicative operational phase layout for the CSO site is located in Appendix 8 Operational Phase Layout, and is based on a preliminary assessment. The generic elevations of structures shown on the operational phase layout are located in Appendix 8 and provide an illustration of typical examples of the permanent structures which are applicable to CSO sites. For both CSO options, the above ground infrastructure at this site is likely to comprise a a ventilation column 10m high and 3m diameter, a ventilation building 5m x 15m x 5m high and a 20m x 10m top structure with openings. The top structure is to provide access and egress into the main shaft and flap valve chamber. The top structures are envisaged to be finished at a level of 107m tunnel datum (TD) (7mAOD), and since the ground level mean value at this site is 104mTD (4mAOD), the top structures would be raised to approximately 3m above the current ground level. For further information on the generic layout of this top structure, refer to Appendix 8. A hardstanding would be provided to the top structures. The site would not be fenced.
b

4.1.3

4.1.4

4.1.5

It was anticipated that the ventilation column at shaft sites would be 10m high when the assessment in this report was undertaken. Although this was subsequently changed to 15m high, the assessment was not revised as it was considered that the difference would not change any disciplines conclusion on the suitability of the site. b It was anticipated that the elevation of top structures at both CSO and shaft sites would be finished at 107mTD when the assessment in this report was undertaken. Although this was subsequently changed to 104.5mTD, the assessment was not revised as it was considered that the difference would not change any disciplines conclusion on the suitability of the site.

Page 3
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

4.1.6

Preliminary data associated with the operational phase are provided in Table 4.1. Table 4.1 Operational phase data Level of inspections and maintenance and likely working hours, ie, (night/day/weekend) frequency of visits 1 daytime visit every six months for electrical/instrument inspection. An additional 1 week maintenance period for tunnel/shaft inspection required per 10 years that could be night/day/weekend working. 1 van visit every six months. An additional 1 week period of 2 to 10 movements per day (estimated several vans and 2 cranes) every 10 years.

No of traffic movements

4.2 4.2.1

Restoration and after-use The portion of the site not occupied by the permanent works would be restored to its original condition on completion of the construction works. If any buildings were demolished, these would not be reinstated unless required. ENGINEERING ASSESSMENT Access This section should be read in conjunction with Section 7.2. Road

5 5.1 5.1.1

5.1.2

For both the construction and operational phases, the sites could be accessed via Neville Gill Close, which is off the A218 (Buckhold Road). It may be possible to also consider access through the main gate or any other access used by park maintenance vehicles. Rail

5.1.3

There is no rail network local to this site. East Putney London Underground station and Wandsworth Town rail station are less than 1.5km from the site. However, rail access is not considered to be a significant factor for CSO sites. River

5.1.4

River access and jetty/wharfage facilities are not a requirement for CSO sites. A wharfage/jetty is not available at the site and is unlikely to be available within a reasonable distance from the site. Construction works considerations No demolition is required. The site is within King Georges Park and some m ature trees may need to be removed. The site is approximately 1km from the centre of the river and the connection tunnel between the CSO drop shaft and the main tunnel would run under buildings. This cannot be improved due to the location of the outfall. The layout of the temporary works should minimise disruption to the parks current infrastructure (trees, walkways and ponds). The final location of the shaft would also need to account for the final route of the EDF cable tunnel. Data available on third-party assets and significant utilities show that the main items in this area of concern are the neighbouring residential and multi-storey buildings, and the

5.2 5.2.1 5.2.2

5.2.3

5.2.4

Page 4
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

proposed Wimbledon to Kensal Green cable tunnel. Construction methods would be adopted, as appropriate, to mitigate potential settlement of these assets. 5.2.5 5.2.6 It is likely that the proposed works can be constructed within the overall construction programme. The interception chamber and connection culvert to the drop shaft are both within the site and therefore require no additional consideration. Permanent works considerations The top structures to the drop shaft and flap valve chamber would be 2m above ground level. Health and safety There are no unusual health and safety issues with this site. PLANNING ASSESSMENT Introduction The planning assessment builds on the advantages and disadvantages reported in Table 2.3 and covers the following areas: Planning applications and permissions Planning context Planning comments. 6.2 6.2.1 Planning applications and permissions An initial desktop search of the London Borough of Wandsworth online planning applications database did not identify any planning applications submitted within the last five years applicable to the site. Planning context The following is a summary of the relevant local planning policies and designations affecting the site, and are taken from the current statutory development plan for the borough. The local plan comprises the saved policies from the Wandsworth Unitary Development Plan, adopted August 2003, and the Consolidated London Plan, adopted February 2008. Policy ON1, Open Space the site is designated public open space. The policy protects open space from development which would result in the loss of open space that contributes to the character and appearance of its surround, or has potential to be used for recreational purposes. Open Space Deficiency Area the site falls within an open space deficiency area. Policy ON4, Metropolitan Open Land, protects MOL from development unless it is related to essential facilities for outdoor sport and recreation, for other uses of land which preserve openness of MOL or for the carrying out of an engineering operation or the making of any material change in the use of land, provided that it maintains the openness of MOL and does not conflict with its purpose. Policy ON7, Green Chain Links, prohibits development that would harm the open nature of any open land that might contribute towards Green Chain or links between open spaces, and especially between Metropolitan Open Land and where they form strategic links between boroughs.

5.3 5.3.1

5.4 5.4.1 6 6.1 6.1.1

6.3 6.3.1

6.3.2

6.3.3 6.3.4

6.3.5

Page 5
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

6.3.6

Policy TBE14, Archaeological Priority Area, states that where development involves ground disturbance, the council will require developers to undertake an archaeological investigation. As appropriate, the council may, under Policy TBE15, require the preservation of findings either in situ or by excavation. Policy ON9, Trees planning permission will not be granted for development which would result in damage to or loss of trees of amenity value unless removal would be in the interests of good arboricultural practice or adequate replacement planting is proposed. Policy GEN12, Housing in determining proposals for development, the council will seek to protect and enhance the character and amenity of residential areas. Policy TCS1, Town Centres the site is adjacent to the Southside Shopping Centre part of Wandsworth Town Centre. Policy TCS1 permits development of an appropriate mix of uses, including retail, business, financial and professional services, as well as leisure, recreation, food and drink, education, health care and, on environmentally suitable sites, residential use. Consultation comments A series of consultations on the shortlisted sites were held with London local authorities, statutory and other pan-London stakeholders during July to September 2009 and January to March 2010. This section summarises factual comments that have been made by consultees, and which have informed the SSR assessments. London Borough of Wandsworth

6.3.7

6.3.8 6.3.9

6.4 6.4.1

6.4.2

The council stated that the site is designated as Metropolitan Open Land, and that there is currently a lake and the John Moore memorial tree and bench located on the site. Access is via an ornamental gate. The Southside Shopping Centre is located adjacent to the site. The council also advised that the new National Grid tunnel cuts across the park. English Heritage

6.4.3

English Heritage expressed concern about the potential impact on the park. Environment Agency

6.4.4

No comment. Port of London Authority

6.4.5

No comment. Transport for London

6.4.6

No comment. Other statutory consultees

6.4.7 6.5 6.5.1

No comment. Planning comments There are a small number of planning designations that are applicable to the sites. These designations have been identified and described in Section 6.3. Of these designations, those relating to public open space and residential amenity are of most relevance to the proposed development. St Georges Park is an attractive and well maintained local park . Use of the site for the Thames Tunnel Project would result in the temporary loss of an area of public open space within the park. This is particularly significant, given that the site also falls within an open Page 6

6.5.2

100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

space deficiency area. The proportional loss of open space associated with both the small and large CSO sites against the level of remaining provision during the construction works may be acceptable. However, mitigation measures may be required to ensure the continued integrity and enjoyment of the remaining areas of open space, and to avoid potential adverse impacts arising from noise, dust and increased traffic movements. Replacement open space or improvement to existing facilities may also be required under Policy ON1. 6.5.3 Use of the site may also impact on the existing degree of openness across the site. However, Policy ON4 states that development may be permitted on MOL if it is required in connection with an engineering operation. This will require further consultation with the local authority, and mitigation may be required to reduce the potential level of visual impact of both the construction works and permanent onsite after-use structures. The integration of after-use structures with the park would require further consideration to ensure they would not conflict with the future use of the site for public recreation purposes. The site is adjacent to and in close proximity to a number of residential properties. The proposal site is situated within 30m of the nearest residential dwellings along Buckhold Road. With appropriate mitigation, the proposal site should not unacceptably impact upon residential amenity of residents within the vicinity of the site. Mitigation against potential impacts from noise, dust and increased traffic movements may be required, as well as control of construction working hours to those commonly operated with residential areas. The day centre and clinic to the east of the site on Neville Gill Road may experience some disruption from the temporary construction works. However, this could in part be addressed by moving the excavation material area further away from these uses. There is a nursery located approximately 90m from the working area. The separation distance achievable at the site, combined with the potential impacts on outlook and general amenity, are considered acceptable. However, mitigation would still be required to protect the nursery and its users from the effects of dust, noise and vibration. Movement within the park may need to be altered or redirected, and consideration would need to be given to any necessary rearrangement of facilities within the park. The site falls within a designated archaeological priority area. The appropriate level of site investigation should be agreed with the LPA, in accordance with policies TBE14 and TBE15. Further appraisal of the archaeological potential on the site is provided in Section 7 of this report. Use of the site would be unlikely to have an adverse impact on the adjacent designated town centre area. However, potential impacts and mitigation measures relating to traffic and transport issues are covered in Section 7 of this report. ENVIRONMENTAL APPRAISAL Introduction The following sections summarise specialist assessments which are provided in Appendix 9 Environmental Appraisal Tables. Transport Small 7.2.1 The site is suitable as a small CSO site, although access onto Neville Gill Close would require construction and there may be a need to modify the layout of the Buckhold Road/ Neville Gill Close junction to allow HGVs to be able to turn right from Neville Gill Close. Other than this, no constraints are identified en route to the TLRN (200m away) or to the rail connection. Some parking could be provided onsite for the workforce and there may be potential to utilise the nearby car park to accommodate any shortfall. There is reasonable potential for the workforce to utilise public transport to access the site.

6.5.4 6.5.5

6.5.6

6.5.7

6.5.8

6.5.9

7 7.1 7.1.1

7.2

Page 7
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

Large 7.2.2 The site is suitable as a large CSO site, although access and egress require construction, some park fencing and guard railing would need to be removed and several footways within the park would require closure and diversion. The Buckhold Road/Neville Gill Close junction may require reconfiguration to allow swept paths for construction vehicles turning right to access the TLRN (A3). Road access is suitable, with no other visible constraints along the route. The route to a rail link at Clapham Junction is possible, albeit passing through a high street area. Some parking could be provided onsite for the workforce and there may be potential to utilise the nearby car park to accommodate any shortfall. There is reasonable potential for the workforce to utilise public transport to access the site. Archaeology The site is potentially suitable as either a small or a large CSO site, although due to a lack of previous investigations in the area, the nature and extent of archaeological receptors cannot be confidently predicted. It is possible that archaeological receptors of high or medium value may be present, although the site currently has no records of archaeological remains. While no direct evidence has been revealed, waterlogged remains and peat deposits of high or medium value may also be present. Peat deposits containing archaeological material have been commonly recorded throughout London in a similar proximity to the River Thames, and it is a reasonable assumption to suggest that waterlogged remains of archaeological value may be present. Built heritage and townscape From a built heritage perspective, the site is suitable as either a small or a large CSO site because it would not result in any direct impacts upon the historic built environment; it does, however have the potential to impact upon the setting of one Grade II listed building. Mitigation in the form of a carefully considered scheme design and/or screening of the site would minimise any adverse impacts. In townscape terms, the site is considered to be less suitable as either a small or a large CSO site because it could result in direct adverse impacts upon the character of King Georges Park, public open space and local views, and would be highly visible during both construction and operation. Water resources hydrogeology and surface water In terms of hydrogeology, this site is suitable as either a small or a large CSO site because the drop shaft is to be constructed in London Clay (non-aquifer). The Chalk piezometric head is likely to be approximately 6.1m above the base of construction and should be taken into account in the engineering design. No impact on the Chalk aquifer is expected. The superficial deposits are Kempton Gravel, which is classified as a minor aquifer at the shaft site, and a limited impact on flow in the shallow aquifer is anticipated due to the use of a diaphragm wall or caissons. In terms of surface water resources, this site is less suitable as either a small or a large CSO site because of the risk of overland pollution to the pond on the site and, as such, specific mitigation would be required. Ecology The site is less suitable as either a small or a large CSO site due to the requirement for temporary and permanent land-take from King Georges Park a site of borough importance (SBI) for nature conservation. Land-take from a London and possibly UK Biodiversity Action Plan (BAP) habitat within this SBI would also require offsite mitigation/compensation solutions, as well as potentially extensive post-works restoration requirements.

7.3 7.3.1

7.4 7.4.1

7.4.2

7.5 7.5.1

7.5.2

7.6 7.6.1

Page 8
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

7.7 7.7.1

Flood risk The site is suitable as either a small or large CSO site because it is defended to the one in 1,000-year design standard. However, a flood risk assessment would be required. There is space for SuDS, although an investigation would be required to determine the suitability for infiltration SuDS. Air quality The site is less suitable for use as a CSO or large CSO site from an air quality perspective as there is potential for fugitive emissions of dust during construction to have a perceptible impact at residential properties in close proximity to the site. These impacts can be minimised with standard dust control measures. There is potential for HGV movements on the local road network to cause localised air quality impacts in areas of already poor air quality. This can, to some extent, be mitigated by minimising the movement of HGVs during peak hours. Noise The site is considered suitable as either a small or a large CSO site, as although the distance between the site and the nearest residential receptors at Park View Court is not large, the existing noise climate is moderately high due to existing road traffic on the A218, Buckhold Road. Any shielding afforded by the site perimeter barriers would be largely ineffectual due to the height of these receptors. Although it is anticipated there would be a large number of vehicles associated with the construction phase and the access route proposed along Buckhold Road, they are unlikely to cause an adverse noise impact due to a relatively small number of receptors along this road. Land quality

7.8 7.8.1

7.9 7.9.1

7.10

7.10.1 The site is suitable as either a small or a large CSO site, based on the low potential for contamination from historical onsite activities and the distance from historical offsite sources. 8 8.1 8.1.1 SOCIO-ECONOMIC AND COMMUNITY ASSESSMENT Socio-economic profile The site is within the Southfields ward of the London Borough of Wandsworth. Statistics from the Office of National Statistics (ONS) 2001 Census data show the following indicators for the ward, in comparison to the rest of Wandsworth, London and England as a whole: A higher rate of full-time employees and self-employed people. A higher rate of employment in professional occupations. A substantially higher proportion of people educated to Level 4/5 (degree level). Fewer people aged 19 or under, or 45 and over, (with comparably more people in their twenties and thirties). There is a high percentage of young children (aged 0-4 years), indicating that there is a growing population in the area. Approximately 82% people are white and around 74% of people were born in the UK. A higher proportion of residents reporting a good state of health. 8.1.2 Overall, the community profile suggests that this is a population of mainly young professionals. Issues and impacts Due to the proposed location of the engineering works for both a large and small CSO, it appears likely that the sites use would result in the temporary loss of the northern tip of the

8.2 8.2.1

Page 9
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

public open green space. Disturbance is also likely to users in the remainder of the park, including a childrens nursery and play area, bowling green and other facilities to the south of the works area. As the park is in an area with several community-oriented facilities, potential users may be especially vulnerable to disruption, such as children and older people. 8.2.2 The residents of Park View Court, located opposite the site to the west, are also likely to face some disturbance due to the works. However, they are separated from the site by Buckhold Road and views may be partially screened by the existing mature trees. The Penfold Day Centre opposite the park to the east may also face some disruption. The remaining properties in the vicinity are mainly commercial and retail and appear unlikely to be significantly affected. The after-use structures required onsite after CSO interception works have been completed could restrict the reinstatement of park facilities. PROPERTY ASSESSMENT Introduction The site forms the northern tip of St Georges Park in Wandsworth. It is under consideration as either a large or a small CSO interception site. Crown Land and Special Land comments The land appears to be owned by London Borough of Wandsworth, although at the time of writing this report, title information was not available. The site may therefore be classified as Special Land under Section 17 of the Acquisition of Land Act 1981. However, Section 17 does not apply where the body acquiring the land is a statutory undertaker. As Thames Water is a statutory undertaker, Section 17 would not apply to London Tideway Tunnels. However, Section 16 of the Act would apply and provides that land may not be acquired unless the Minister is satisfied that there would be no detriment to the operations of the owner, or that the land can be replaced. Therefore, the compulsory purchase may be subject to a Ministerial procedure. The land is open space, consisting of parkland, and therefore it may be classified as Special Land under Section 19 of the Acquisition of Land Act 1981. If this is the case, and if an acquisition cannot be agreed with the owner, a special parliamentary procedure may be needed after the Order is confirmed. As the whole Order would be subject to the special parliamentary procedure, not just the acquisition of this site, the project could be delayed by a minimum period of several months in the best case. In the worst case, the Order might be rejected by Parliament, in which case an Act of Parliament would be needed before the Order could come into effect. This could delay the project for a much longer period and even result in the Order failing. Contact should be made with the owner as soon as possible to establish if an acquisition can be agreed. It may also be advisable to consider the inclusion of exchange land in the Order if any is available. Land to be acquired The compensation assessment assumes that the worksite would be acquired temporarily, via the acquisition of new rights for the period of the works stated in the engineering section. The operational phase would require the acquisition of a freehold interest in a small area of the park, with dimensions of approximately 15m by 15m. A right of way to enable access to the above freehold would need to be acquired. There is an electricity substation in the northern part of the site, near the boundary with Buckhold Road. The working area boundary should be altered to avoid this if possible. Page 10
100-RG-PNC-C07BF-900001.doc

8.2.3

9 9.1 9.1.1

9.2 9.2.1

9.2.2

9.2.3 9.2.4

9.3 9.3.1

9.3.2 9.3.3 9.3.4

Site Suitability Report C07BF

9.4 9.4.1 9.4.2

Property valuation comments The planning history confirms that there are no development proposals for this site. The land would be reinstated after the works are complete, as a part of the engineering works, and therefore reinstatement costs are not included in the compensation assessment. Compensation for the acquisition of new rights is normally based on the diminution in value to the land caused by the acquisition. Compensation for the permanent acquisition of land is normally based on market value. However, compensation for the permanent acquisition of unusual types of property, where there is no general market, can be assessed on the basis of the cost of equivalent reinstatement at a new site, but there must be a genuine intention to reinstate. If compensation is assessed on a diminution in value basis for the new rights (temporary occupation during works, access rights during works, access rights for operational purposes) and on a market value basis for the permanent acquisition, the costs are likely to be relatively low and therefore acceptable. If compensation is assessed on an equivalent reinstatement basis, the acquisition costs would be significantly higher, but still acceptable. Although finding replacement land may be difficult, compensation has been assessed on an equivalent reinstatement basis in order to be prudent. Disturbance compensation comments The site is used as parkland and therefore any disturbance compensation payable is likely to be minimal. Offsite statutory compensation comments There should be limited potential for offsite statutory compensation under Section 10 of the Compulsory Purchase Act 1965, as there is unlikely to be any physical interference with public or private property rights. There should also be limited potential for claims under Part 1 of the Land Compensation Act 1973 as the completed works are unlikely to result in diminution in value to property. Discretionary purchase costs comments The terms and conditions of the discretionary scheme have not yet been finalised and therefore it is not possible to come to a view on the level of discretionary purchase costs. There is potential for discretionary purchase costs in relation to nearby residential property, in particular the flats fronting Buckhold Road. The construction details section of the report states that working hours would be 7:00 am to 7:00 pm, Monday to Saturday, for a period of up to two years. The fact that work would be within normal working hours should significantly limit the potential for discretionary purchases. Site acquisition cost assessment The statutory acquisition costs are likely to be acceptable for both options. SITE CONCLUSIONS BY DISCIPLINE Introduction

9.4.3

9.4.4

9.4.5 9.4.6

9.5 9.5.1

9.6 9.6.1

9.6.2

9.7 9.7.1 9.7.2 9.7.3

9.8 9.8.1 10 10.1

10.1.1 The conclusions presented in this section are drawn from each disciplines assessment , and are designed to inform the workshop where a final conclusion on whether the site moves forward as one of the preferred sites or not. Page 11
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

10.2

Engineering Large CSO site

10.2.1 This site is suitable as a large CSO site because it has good access and is of adequate size. The storm relief sewer is in close proximity to the drop shaft and this would allow the interception chamber and connection culvert to the drop shaft to be within the same site. No demolition would be required. The site is approximately 1km away from the river and the connection from the drop shaft to the main tunnel would run under buildings. However, this cannot be improved due to the location of the outfall. Small CSO site 10.2.2 As the site is suitable as a large CSO site, it is also suitable as a small CSO site. 10.2.3 Whether a small CSO site is appropriate or not for the interception of the Frogmore Storm Relief Sewer CSO will be considered at the next stage, in conjunction with the drive strategy that is developed in the Engineering Options Report. 10.3 Planning

10.3.1 On balance, the site is considered suitable for use as either a small or large CSO site. 10.3.2 There are few planning designations applicable this site. However, potential impacts upon residential amenity and loss of open space within an area of deficiency would require appropriate mitigation. Further consideration should also be given to the detailed layout of the work areas, reinstatement of the working areas post construction and the integration of the after-use structures within the park. 10.4 Environment

10.4.1 Overall, the site is suitable as both a small and a large CSO site, although mitigation would be required to enable the site to be used for either purpose. 10.4.2 Based on current information, the site is suitable for both site sizes from the perspective of transport, archaeology, built heritage, water resources (groundwater), flood risk, noise and land quality. 10.4.3 The site is considered less suitable for both site sizes from the perspective of townscape, ecology, surface water and air quality. 10.4.4 Overall, the site is considered suitable, subject to further investigation of whether ecology, surface water and air quality impacts can be adequately mitigated. Likely mitigation considerations would include the following: Townscape Retention and protection of trees where possible and the introduction of landscape scheme to include appropriate surface treatments and planting to replace lost vegetation and re-establish planted character of park, and sensitive design of structures to minimise impacts on the character of the park and local views. Ecology mitigation/compensation solutions, as well as post-works restoration of habitat lost within a site of borough importance (SBI) for nature conservation. Surface water mitigation to minimise the risk of overland pollution to the pond on the site. Air quality measures to ensure dust is adequately mitigated for the closest receptors, and minimising the movement of HGVs during peak hours. 10.5 Socio-economic and community

10.5.1 This site is suitable for either a small or large CSO site. Use of the site appears likely to only result in the temporary loss of the northernmost tip of the park. The remainder would be available for public use, although the childrens nursery and play area, bowling green

Page 12
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF

and other facilities may face some disturbance. It appears possible, however, for potential impacts on park users and the surrounding properties to be mitigated. During the works, these may include measures to limit noise and visual disturbance. 10.5.2 The permanent hardstanding and associated after-use features may restrict the reinstatement of that area of the park after the works have finished. 10.6 Property

10.6.1 This site is considered suitable as a CSO site. 10.6.2 The advantages of the site are as follows: Acquisition cost should be acceptable The site is undeveloped. 10.6.3 The disadvantage of the site is as follows: A special parliamentary procedure may be needed, giving rise to acquisition risk.

Page 13
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF - Appendices

APPENDICES

Page 14
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 1

APPENDIX 1 SOURCES OF INFORMATION

Engineering Traffic Management and Access Roads/Rail Scott Wilson Access River BMT Third Parties (Shafts/CSOs) Mott MacDonald and AECOM Geology Thames Water Utilities Thames Water and AECOM Construction and Operational Layout Template London Tideway Tunnels Background Technical Paper London Tideway Tunnels Planning London Borough of Wandsworth online planning applications database Saved policies in the Wandsworth Unitary Development Plan, adopted in August 2003, and the Consolidated London Plan, adopted in February 2008

Environment Transport Map of Transport for London Road Network (TLRN) - www.tfl.gov.uk Bus Route Maps: North-east, north-west, south-west, south-east - www.tfl.gov.uk Crossrail Plans - www.crossrail.co.uk/crossrail-bill-documents PTAL scores - Obtained from Table 2.3 information Thames Path map - www.walklondon.org.uk Capital Ring - www.walklondon.org.uk Cycle Routes - www.sustrans.org.uk and Local Cycling Guides 1-14 Design Manual for Roads and Bridge TD 42/95, Highways Agency Built heritage and townscape Wandsworth List of Locally Listed Buildings National Monuments Record - for some additional information regarding registered historic parks and gardens Unitary development plans Local authority websites Bing maps Water resources hydrogeology and surface water Environment Agency abstraction licence details Environment Agency groundwater levels Local authority details of unlicensed abstractors

Appendix 1 - Page 1
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 1

Environment Agency Flood Map www.environment-agency.gov.uk Envirocheck Ecology Thames Estuary Partnership (2002) Tidal Thames Habitat Action Plan London Biodiversity Action Plan - www.lbp.org.uk Multi-Agency Geographic Information for the Countryside (MAGIC) www.magic.gov.uk statutory designated sites London Wildweb - http://wildweb.london.gov.uk - non-statutory site of importance for nature conservation Black redstart distribution in London - www.blackredstarts.org.uk/pages/londonmap.html National Biodiversity Network - http://searchnbn.net - distribution of protected species Google Maps - aerial views of habitat features BAP habitats - www.natureonthemap.org.uk Priority habitats and species on national and local scales - www.ukbap.org.uk Flood risk Environment Agency Flood Map www.environment-agency.gov.uk Envirocheck Air quality Local authority websites www.londonair.org.uk/london/asp/default.asp?la_id=&showbulletins=&width=1680 http://www.airquality.co.uk Noise Envirocheck - Identification of receptors Promap - Calculation of distances between site and receptors Multimap - Aerial photography www.multimap.co.uk Defra noise maps - Identification of existing noise levels Land quality Google Maps/Earth Site walkover information

Socio-economic and community Statistics from the Office of National Statistics (ONS) 2001 Census data King Georges Park: www.wandsworth.gov.uk/Home/EnvironmentandTransport/Parks/ Parkscommons/KGP.htm; and http://wgate.users.netlink.co.uk/kgp01.html; and www.parkexplorer.org.uk/park_intro.asp?ID=WND13; and www.london.gov.uk/parksvote/region/southwest/kinggeorges.jsp; and www.wandsworth.gov.uk/NR/Wandsworth/localpdf/brightside/bside_june07.pdf?bcsi_scan_F 6892CABA15785B4=0&bcsi_scan_filename=bside_june07.pdf

Appendix 1 - Page 2
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 1

BBC: www.breathingplaces.org/public/place_by_name/King-Georges-Park-One-OClockIntegrated-Childrens-Centre?id=41547 NHS Arndale Clinic: www.nhs.uk/ServiceDirectories/Pages/Hospital.aspx?id=5LG06&v=0 Wandsworth Business Village: www.rolfe-judd.co.uk/architecture/projects/affordablehousing/wandsworth-business-village/#; and www.rolfe-judd.co.uk/architecture/ projects/affordable-housing/wandsworth-business-village/spec-sheet.pdf

Property Mouchel referencing data Rating records from VOA Website Promap Multimap/Live Maps

Appendix 1 - Page 3
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 2

APPENDIX 2 SITE LOCATION PLAN

Appendix 2 - Page 1
100-RG-PNC-C07BF-900001.doc

EN

TI AL
HAMMERSMITH & FULHAM

FI D

&

Area of Main Map

AF T

Legend
Local Authority Boundary Short Listed CSO Sites

CS07A Frogmore Storm Relief - Bell Lane Creek CSO

! (

CSO (Directly Controlled)

! (

0 50 100 200 Metres 300 400

WANDSWORTH C07BF

! (Frogmore Storm Relief - Buckhold Road CSO

CS07B

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued incomplete in any way.

Map Ref : .......101PL-SS-00611 Date : .............2009/12/08 Projection : .....British National Grid

Thames Water Utilities


MAJOR PROJECTS

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Title:

APPENDIX 2 C07BF SITES SITE LOCATION PLAN

Site Suitability Report C07BF Appendix 3

APPENDIX 3 PLANNING AND ENVIRONMENT PLANS

Appendix 3 - Page 1
100-RG-PNC-C07BF-900001.doc

TI AL

146b

BUSH

AG ES CO TT

EN

LB

RO AD

&

Triangle House

HO LD

CK

117

Bank
11 4

AF T

BU

1 to

11 .8

16

Do wn

bu

Jessica House

108

12

ry

FB
5

TO B d N y RO A

TCB

W R ar d

M
7

M
Gardiner House

Welsbach House

M
Works

Works

FBs

20

!
Multistorey Car Park

Traders Hall Multistorey Car Park

Multistorey Car Park Traders Hall

9.1m

Park View Court

!
Day Centre

!
b Sta El Su

! !

! !
79

5.5m

C07BF
IL NE V

Day Centre El

14

Sub Sta Clinic

!
1 to 72 Albon House

! ! ! !
1 to 72 Edwyn House

! ! ! ! ! ! ! !
1 to 72 Knowles House

! ! ! ! ! ! ! ! ! ! ! !

78

5.7m

Clinic

! ! !

74

75

24

73

26

72

16.1m
35

Willow Court
37

Birch Court

71

1 to

70

78

54

69

Legend
! ! !
66

Pine Court
5.7m

68

Lake
69

! !

! ! ! ! ! ! ! !

! ! ! ! ! ! ! !

! !

! !

! !

! !

! ! ! ! ! ! ! !
L MA P

80

Town Centre Core FrontagesDunsford Court


39

Downe Lodge

28

Calico Court Town Centre Secondary Frontages

Children's Zoo

Nursery

! !

Town Centre Other Frontages


1 to 9

M M

M Mixed Use Areas


78

Town Centres
59

78

!
FB
86

! ! ! !

Industrial Employment Areas 2008 Site Allocations Document Sites


61

Octavia House

!
Lake

! !

30

94

! ! ! ! ! ! !

31

91 to

WANDSWORTH M M
11

Park View Court

M
9 to 20

King George's Park

Multistorey Car Park

29

Traders Hall

96

98

95

97

TCB

25

M Works

FB

M
1 to 8

C BU

Traders Hall

!
Lon g

! !

! ! ! ! ! ! ! ! !
42
37

El Sub Sta

Southside Shopping ! ! ! Centre !

! ! ! ! !

19

99

O KH

LD 5.4m

23

RO

24

Works

The Business Village

AD

17

West Hill Centre (adult college)

FB

103

Works

CS07B Shopping Centre Frogmore Storm Relief -!Buckhold ! ! Road ! ! CSO


M M M M ! ! !Southside ! !
104 to 1 07
127 128

Cockpen House

!
GAR
4
8
10 to

ME

to

30

! (
! ! ! ! ! ! ! ! ! ! !
45

ale H Arnd

Arnd

al e W

al k

ouse
1

!
21

! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! !

1 to 84 Wentworth Court

1 to 84 Eliot Court

b Sta El Su

FB

!
51

! ! ! ! !

! ! ! ! !

! ! ! ! !

79

M
O BR OM

10

11 8

ew

to

12

Sudbury House

1 to 132

40

81

27

83

48

M
14 23

M
1 to

113

115

87

89

1 to

17

45

to 6

201

203

205

209

8.5m

Dutch Yard House

16

14

24

22

'S ICK DW HA R

SQ U

A RE

121b

195

197

199

TCB

Bdy s t & Ward Boro Con

187

CR

183 185

181

El Sub Sta

FI D

146

177

144

El Sub Sta

Chapel Yard

Chapel Yard

107 109

Police Station

111

Bank

113

115 117

167

to 1

73

WAN

161

140

Spencer Court

119

OR DSW

159

TH

157

HIG

123

to

6.3m

125

HS

155

142

127 129

134

153

Tank

131

132

T REE

139

141 143

149 151

PH

130

126 128

124

5.2m

PH
Def
96

Def

92

138a

82

M
4.9m

Pipe Bridge

N EW

70

M
PH

Ban k

TON RD 'S YA

ro Sim se C o u rt

DU TC

M
Shelter

Bo ro

C on

CR

st &

W ard

Su rg

HY AR

68

B dy

5.6m

Area of Main Map

Re dL io n Sq

ery

u are

13

Legend
Local Authority Boundary Short Listed CSO Sites CSO (Directly Controlled)

1 3
5

10 11

! (
RATT
16
18

H IL L RO A
D

14

LANE

West Hill Primary School

! ! ! ! ! ! ! ! ! !
58

PO

6.3m

11

15

10

20

13

40

60

80

1 to 16

9 15
15

LL E NEVI

Metres

cl if fe

H ous

G IL L CL O SE

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued ! incomplete in any way.

32

33

21 to 32

34 35

21

! based on an interpretation of GIS policy designation ! planning and environment assessments. ! Map Ref : .......101PL-SS-00525
6.2m

This plan is a strategic and standardised overview

BR OOMH ILL RO AD

36

LE G IL LC L OS E

layers provided by affected London local authorities. Please refer to the text in the SSR's for the full

38

39

55

33

40

! ! !

Date : .............2009/11/19 Projection : .....British National Grid

1 to 9 1 to 6

43
60

44

47

Thames Water Utilities


MAJOR PROJECTS
The Point, 7th Floor, 37 North Wharf Road,

46

41

!Paddington, London W2 1AF ! Title:


N ET O S CR E

81

T C EN

! ! !

APPENDIX 3A C07BF SITE PLANNING AND ENVIRONMENT PLAN

BU CKHO AD LD RO
93

SM

TI AL

146b

BUSH

AG ES CO TT

EN

LB

RO AD

&

Triangle House

HO LD

CK

117

Bank
11 4

AF T

BU

1 to

10

11 8

to

11 .8

16

Do wn

bu

Jessica House
FB
5

108

12

ry

TO B d N y RO A

TCB
5

Welsbach House

Works Works
Gardiner House
7

FBs

20

! !
1 to 8

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! !

! !

! !
Park

! !

! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
IL NE V

! ! ! !

! ! !

! !

! !

!
6

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
55

! ! ! !

! ! ! !

! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

Traders Hall

! ! !

9.1m

Park View Court

! ! ! Multistorey Car Park ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !


Day

! ! Car ! Park ! Multistorey Traders Hall ! ! ! ! ! !


El

! ! ! ! ! ! ! !

! ! ! ! !
34

! ! ! !

! !

! !

! ! !

! ! !

! ! 5.5m ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! C07BF ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! b Sta ! El Su
Day

! ! Centre ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
FB

14

! Centre ! ! ! ! ! !
Albon House !

! ! ! ! !
75

! ! ! ! Clinic ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

79

!
BR OOMH

! ! ! Sub Sta ! !
Clinic! !

!
5.7m
45

72 ! !1 to!

78

! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Lake

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!
74
38
73

24

! ! !

26

72

16.1m
35

Willow Court
37

Birch Court

! ! ! ! !
5.7m

71

! ! ! !

1 to

70

78

54

69

Pine Court

Lake

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

1 to 72 Edwyn

68

! !

!
69

House ! !

80

Downe Lodge
66

Dunsford Court

28

! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! !
SM

Calico Court
1 to 9

Children's Zoo

Nursery

Legend
78

78

!
81

! ! ! !

Metropolitan Open Land


86

! ! !

! ! !

! ! !

! ! !

Open Spaces
61

Octavia House

1 to 72 Knowles House

Play Equipment

!
BU CKHO

! !
93

! !

! !

30

91 to

94

31

WANDSWORTH
11

Park View Court

King ! !George's ! !

Multistorey Car! Park ! ! ! !

29

!
15

! ! Multistorey Car Park

Traders Hall
! !

! !

96

95

Works

98

97

TCB

25

FB
9

C BU

Traders Hall

El Sub Sta

Southside Shopping Centre

19

99

O KH

LD 5.4m

23

RO

24

Works

The Business Village

AD

17

West Hill Centre (adult college)

FB

103

to

30

104 to

Works

Southside CS07B Shopping Centre Frogmore Storm Relief - Buckhold Road CSO
127 128

W R ar d

Cockpen House

ME

! (

ale H Arnd
11
15

Arnd

al e W

al k

ouse
1
5

1 to 84 Wentworth Court

1 to 84 Eliot Court
36

b Sta El Su

FB
58

79

12

ew

Sudbury House

1 to 132

40

81

27

83

113

115

87

89

1 07

1 to

48

17

1 to

14

23

to 6

201

203

205

209

8.5m

Dutch Yard House

16

14

24

22

'S ICK DW HA R

SQ U

A RE

121b

195

197

199

TCB

Bdy s t & Ward Boro Con

187

CR

183 185

181

El Sub Sta

FI D

146

177

144

El Sub Sta

Chapel Yard

Chapel Yard Shelter

107 109

Police Station

111

Bank

113

115 117

167

to 1

73

WAN

161

140

Spencer Court

119

OR DSW

159

TH

157

HIG

123

to

6.3m

125

HS

155

142

127 129

134

153

Tank

131

132

T REE

139

141 143

149 151

PH

130

126 128

124

5.2m

PH
Def
96

Def

92

138a

82

Pipe Bridge

N EW

Ban k

TON RD 'S YA

ro Sim se C o u rt

4.9m

70

DU TC

Bo ro

C on

CR

st &

68

PH

Su rg

HY AR

W ard

B dy

5.6m

Area of Main Map

Re dL io n Sq

ery

u are

13

Legend
Local Authority Boundary Short Listed CSO Sites CSO (Directly Controlled)

6
3

1 3

10 11

O BR OM H IL L RO A
D

! (
GAR
4
8
10 to

RATT

16

18

14

LANE

West Hill Primary School

PO

6.3m

10

20

21

13

40

60

80

Lon g

1 to 16

LL E NEVI

Metres

cl if fe

H ous

G IL L

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued incomplete in any way. This plan is a strategic and standardised overview based on an interpretation of GIS policy designation layers provided by affected London local authorities. Please refer to the text in the SSR's for the full planning and environment assessments.

CL O SE

9 to 20

32

33

15

21 to 32

35

21

LE

G IL

37

ILL RO AD

LC

L OS

39

33

40

6.2m

Map Ref : .......101PL-SS-00526 Date : .............2009/11/19 Projection : .....British National Grid

1 to 9 1 to 6

42
43

60

51

44
45

47

Thames Water Utilities


MAJOR PROJECTS
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

46

39
59

41

Title:
L MA P N ET O S CR E

T C EN

APPENDIX 3B C07BF SITE PLANNING AND ENVIRONMENT PLAN

AD LD RO

TI AL

146b

BUSH

AG ES CO TT

EN

LB

RO AD

&

Triangle House

HO LD

CK

117

Bank
11 4

AF T

BU

1 to

10

11 8

to

11 .8

16

Do wn

bu

Jessica House
FB
5

108

12

ry

TO B d N y RO A

TCB
5

Welsbach House

Works Works
Gardiner House
7

FBs

20

Traders Hall 9.1m Park View Court Multistorey Car Park


9 to 20

Multistorey Car Park Traders Hall 1 to 84 Wentworth Court


32

5.5m

C07BF
IL NE V

b Sta El Su

Day Centre El

14

Day Centre
79

Sub Sta Clinic

5.7m

Clinic

1 to 72 Albon House
75

78

74

24

73

26

72

16.1m
35

Willow Court
37

Birch Court

71

1 to

70

78

54

69

Pine Court
5.7m

Lake
69

1 to 72 Edwyn House

68

80

Downe Lodge
66

Dunsford Court

28

Calico Court
1 to 9

Children's Zoo

Nursery

Legend !
78

78

Listed Buildings
59

Archaeological Areas Conservation Areas


61

Octavia House

1 to 72 Knowles FB
86

House

Lake

31

30

91 to

94

WANDSWORTH
11

Park View Court

King George's Park

Multistorey Car Park

29

Multistorey Car Park

Traders Hall

96

95

Works

98

97

TCB

25

FB
9

C BU

Traders Hall

El Sub Sta

Southside Shopping Centre

19

99

O KH

LD 5.4m

23

RO

24

Works

The Business Village

AD

17

West Hill Centre (adult college)

FB

103

to

30

104 to

Works

Southside CS07B Shopping Centre Frogmore Storm Relief - Buckhold Road CSO
127 128

W R ar d

Cockpen House

ME

! (

ale H Arnd
11
15

Arnd

al e W

al k

ouse
1
5

1 to 84 Eliot Court
36

b Sta El Su

FB
58

79

12

ew

Sudbury House

1 to 132

40

81

27

83

113

115

87

89

1 07

1 to

48

17

1 to

14

23

45

to 6

201

203

205

209

8.5m

Dutch Yard House

16

14

24

22

'S ICK DW HA R

SQ U

A RE

121b

195

197

199

TCB

Bdy s t & Ward Boro Con

187

CR

183 185

181

El Sub Sta

FI D

146

177

144

El Sub Sta

Chapel Yard

Chapel Yard Shelter

107 109

Police Station

111

Bank

113

115 117

167

to 1

73

WAN

161

140

Spencer Court

119

OR DSW

159

TH

157

HIG

!
Ban k

123

to

6.3m

125

HS

155

142

127 129

134

153

Tank

131

132

T REE

139

141 143

149 151

PH

130

126 128

124

5.2m

PH
Def
96

Def

92

138a

82

Pipe Bridge

N EW

TON RD 'S YA

ro Sim se C o u rt

4.9m

70

DU TC

Bo ro

C on

CR

st &

68

PH

Su rg

HY AR

W ard

B dy

5.6m

Area of Main Map

Re dL io n Sq

ery

u are

13

Legend
Local Authority Boundary Short Listed CSO Sites CSO (Directly Controlled)

6
3

1 3

10 11

O BR OM H IL L RO A
D

! (
GAR
4
8
10 to

RATT

16

18

14

LANE

West Hill Primary School

PO

6.3m

10

20

21

13

40

60

80

Lon g

1 to 16

LL E NEVI G IL L

Metres

cl if fe

H ous

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued incomplete in any way. This plan is a strategic and standardised overview based on an interpretation of GIS policy designation layers provided by affected London local authorities. Please refer to the text in the SSR's for the full planning and environment assessments.

1 to 8

CL O

15
15

SE

33

21 to 32

34 35

21

BR OOMH ILL RO AD

LE G IL LC L OS E

37

38

39

55

33

40

6.2m

Map Ref : .......101PL-SS-00527 Date : .............2009/11/19 Projection : .....British National Grid

1 to 9 1 to 6

42
43

60

51

44
45

47

Thames Water Utilities


MAJOR PROJECTS
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

46

39

41

Title:
MA P L ET O ES N CR T C EN

APPENDIX 3C C07BF SITE PLANNING AND ENVIRONMENT HERITAGE PLAN

81

BU CKHO AD LD RO
93

SM

Site Suitability Report C07BF Appendix 4

APPENDIX 4 PHOTOGRAPHS OF THE SITE AND SURROUNDINGS

Appendix 4 - Page 1
100-RG-PNC-C07BF-900001.doc

TI AL

EN

FI D

! (

CS07A Frogmore Storm Relief - Bell Lane Creek CSO


Area of Main Map

AF T

Legend
Local Authority Boundary Short Listed CSO Sites CSO (Directly Controlled)

&

! (

WANDSWORTH

! (
C07BF

CS07B Frogmore Storm Relief - Buckhold Road CSO

25

50

100

150

200

Metres

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued incomplete in any way.

Map Ref : .......101PL-SS-00634 Date : .............2009/12/08 Projection : .....British National Grid

Thames Water Utilities


MAJOR PROJECTS
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Title:

APPENDIX 4 C07BF SITE AERIAL PLAN

Site Suitability Report C07BF Appendix 4

View of the site from within the park looking towards the northwest and park entrance on Buckhold Road.

View of the site from within the park looking towards the northeast.

Appendix 4
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 4

View of the site looking northwest from Neville Gill Close.

Appendix 4
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 5

APPENDIX 5 TRANSPORT PLAN

Appendix 5 - Page 1
100-RG-PNC-C07BF-900001.doc

FI D

EN

TI AL
HAMMERSMITH & FULHAM

&

Legend

Area of Main Map

AF T

Local Authority Boundary Short Listed CSO Sites CSO (Directly Controlled) Transport Access Routes TfL Road Network Thames Path

! (

London Cycle Routes

! (

CS07A Frogmore Storm Relief - Bell Lane Creek CSO


0 0.035 0.07 0.14

Km

0.21

0.28

0.35

WANDSWORTH

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. (c) Crown copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 100019345 CH2M HILL accept no responsibility for any circumstances, which arise from the reproduction of this map after alteration, amendment or abbreviation or if it issued in part or issued incomplete in any way.

C07BF

! (

CS07B Frogmore Storm Relief - Buckhold Road CSO

Map Ref : ........... 101PL-SS-00739 Date : ................. 2009/11/19 Projection : ......... British National Grid

Thames Water Utilities


MAJOR PROJECTS
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Title:

APPENDIX 5 C07BF SITE TRANSPORT PLAN

Site Suitability Report C07BF Appendix 6

APPENDIX 6 SERVICES AND GEOLOGY PLAN

Appendix 6 - Page 1
100-RG-PNC-C07BF-900001.doc

1
7.1m

3
5.0m

4 N

5
4.8m

6
7801 DO NOT SCALE - IF IN DOUBT ASK VC
Status:

3106

ZBV030272 WO 0801B 6088 2703


PH

WO ZBV030266

WORK IN PROGRESS GEOLOGY


Keyplan:
N

2751 3702
6.2m

1701 6009 1750 WO


Posts Lodge

3130 5703 5702

Studios

Ground level 105 (m AOD + 100) 4489 WO


4.8m

26 YDS 4" MAIN LAID 22-10-64 GUAR NO 6438 7702


Salvation Army Citadel

DRAWING LOCATION

VC 98(m AOD + 100)Base of Made Ground and Superficial WO 7703

VT
0337 3703
El

Brewery
Garage

Sub Sta El Sub Sta

A
2750 6086 2702 6089

Milton Court

ZBV030271

WO Garage

Posts

6704 Suggested invert level of shaft


3701 4704
All Saints Church

Municipal MAPPING REPRODUCED BY PERMISSION OF ORDNANCE Buildings


DATABASE RIGHT 2008. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND

73.84(m AOD + 100)

3104 DRAIN PIT

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO A LOCAL HEIGHT 7701 DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

Works Bank

CON 130 S
IL-2.17m

0701 4701 WO

CON 2S SU 4703 4702 SE 3129 SE


EV DC
5.2m

NOW IN ROAD 5701

WW CON 2S
PH 5.0m

6702
7606 7605 Town Hall 7604

NOTES: 1. LIMITED FIBRE OPTIC AND BT COMMUNICATION CABLES SHOWN ON THIS DRAWING. DETAILS OF THESE CABLES AND OTHER SERVICES AND THIRD PARTY ASSETS TO BE CONFIRMED BY FURTHER STUDIES AND UTILITY SEARCHES. 2. INVERT LEVEL OF SHAFT SHOWN.BASE OF CONSTRUCTION WILL BE BELOW THIS LEVEL AND WILL DEPEND ON CONSTRUCTION TECHNIQUE. THIS IS ONLY PROVISIONAL AS DESIGN IS AT EARLY PRELIMINARY STAGE. OUTLET LEVEL 6.09M

4613 VT
PH
Tank

VT DC
WO

DETAILS OF DIVERSIONS

PS
IL-2.13m

6614
Pipe Bridge

0409 3125
Spencer Court

WW

3602 SE

ST
WO WO WO 4488

6.3m

ZBV586130

4629
Bank

3609 SE
DBV585893 3124 DEFECTIVE 4624 3604

4628 4625
El Sub Sta Chapel Yard

Base of London Clay Formation

Police Station

Library St Thomas of
Wayside

El Sub Sta

WO 5603 ZBV030265

DM04538

5606 FH
ZBV082835 WO
PH

6613 SE LS
AC WO

47(m AOD + 100) 36" 30" 16" 9" 7"

5608
3138

Canterbury RC Church
CR

DM04405
8.5m

4622
Posts

4623
BF
Shelter

ZBV006084 ZBV030274
12.4m
LB

NF 4604 4626 4627

4605 6595

DC
WO 4"

0477 2601 DM04535 3728 3298 WO


Triangle House

4621
4619

UNABLE TO LIFT LID

CON 3S

DC

SU

Base of Lambeth Group


HIGH STREET 32(m AOD + 100)
5.7m

7603

3727 DM04534 1601 4" AC ZBV585993

UNABLE TO LIFT LID 5.6m

3611

4616 4606

29-5-70 2602

PROPOSED HARDWICKS WAY WANDSWORTH SEWER DIVN/818G SU


4618 4607
1 to 132

Bank

DC
3282

WO DM04539
PH Bank

3114
Welbeck House

SE

LEGEND
FOUL WATER

ZBV585998

Base of Thanet Sand Formation WO WO


Burial

B
St Thomas Mews Jessica House

4620
WO

Sudbury House

19 (m AOD + 100)

House

SURFACE WATER

6601
CLEAN WATER 7501
El Sub Sta

FB TCB
Welsbach House

6533
5501 Cockpen House 3283 6121

Ground

GAS

5593

Southside
Works Works
Gardiner House

5511
NF

Shopping Centre

4487 Chalk Museum

FIBRE OPTICS
FB

HW
WO DBV006060 WO

CON 92S 5520 FV FV FV

6501 6513

7502
El Sub Sta

TELECOMUNICATIONS

LOW VOLTAGE CABLES


PO
6.3m

Works

CPP 5491

3312 WO
15.0m
FBs FB

7503

6506

HIGH VOLTAGE CABLES

West Hill

1501

Centre (adult college)


FB

Works

The Business Village

DB DP 4511 DB SE DB 4501

SU 4503
Traders Hall
TCB

SU
4512 SE 4514
Traders Hall
El Sub Sta

CON 11 S THE BGS SYNTHETIC GEOLOGICAL PROFILE DERIVED FROM DC IL-1m WW ST LONDON LITHOFRAME50 MODEL, HISTORICAL BOREHOLES HW 7504 AND BERRY (1979). PLEASE NOTE, GROUND CONDITIONS MAY LS DP 3281 VARY AND THIS DATA SHOULD NOT BE USED FOR DETAILED ENGINEERING PURPOSES WO

EXISTING TUNNELS

Burial Ground

Works

UNDERGROUND UTILITIES
WATER STORM & FOUL SEWERS -ALL TW ASSETS -ALL TW ASSETS

ZBV752708 3299 3738 3501


Park View Court

4516 SE King Georges


Park

Multistorey Car Park

6849
Multistorey Car Park

PS 4506
Multistorey Car Park Traders Hall Traders Hall Multistorey

WO

1403
9.1m

C07BD
Park View Court

OTHER SIGNIFICANT UTILITIES ARE DEFINED AS:


6.2m 1 to 84 Wentworth Court

3406 WO NF
5.5m

3407 IL2.46m

C07BF

Car Park

Burial Ground

TELECOMS ELECTRICITY

-ONLY FIBRE OPTIC CABLES -HIGH VOLTAGE CABLES -LARGE BANKS OF LOW VOLTAGE CABLES -LOW PRESSURE ABOVE 300mm DIAMETER -INTERMEDIATE, MEDIUM OR HIGH PRESSURE 200mm

FIRE
Day Centre Day Centre

3313
16.2m

2401

1401

IL2.89m

SU GAS 7402

El

WO
LB

Sub Sta

1 to 84 Eliot Court 1 to 72 Albon

BS 6404 SE
3280

3286 3405
5.7m Clinic Clinic

6406

El Sub Sta

House

1402

3404

WO
PH

6414 6413 7403 SCALE 1 : 1000 10 m 0 100 m

3403 6850 FH
16.1m

6411 6415

6412

525

Willow Court

Birch Court

IL2.58m POSSITION AND LAYOUT OF MAINS ASSETS UNCONFIRMED 3402 AND 3300
Pine Court

SITE BOUNDARY 6847


1 to 72

6.2m

WO 4486
Edwyn House

100mm

3313 SE 0303 SE
Downe Lodge Dunsford Court

Lake

3401
5.7m

6309
7301

7404

IL2.9m

VC

CON 91S
Nursery

5301 VLH Southside Shopping Centre PROPOSED NATIONAL GRID 4302 WIMBLEDON TO KENSAL GREEN CABLE TUNNEL AB DRAFT-SECOND ISSUE AP AP
Dsgnr

1302
Calico Court

3302 3306 DP
WO

Childrens Zoo

RS RS
Chkd

DA DA
Appd

03.09.09 27.08.09
Date

WO 1301

ZBV030297

AA DRAFT-FIRST ISSUE
Iss Description

MISSING 5302
6.4m

IL12.12m ZBV030296

3737 HW

2301

2313
1 to 72 Knowles House FB

PROPOSED TO BE

ABANDONED #11731 6305 6304

Stables

3314

Octavia House

WO
The Point, 7th Floor, 37 North Wharf Road, Paddington, El Sub Sta
Works

IL12.04m Yard

4301 3301 0301

6302 5303 PROPOSED TO BE

6303

D
3733

CON 61S VT

HW

2314 SE WW HW

TB IL2.97m CON 95S DC DC 2303 SE ST

ABANDONED #11731

London W2 1AF
OS Reference: Security Reference: Drawn By:

Location Code:

3301
Lake

N/A 6301
FB

UBR
Sub Process:

AP

TB WW 2315 HW SE
1201

Project Group:

7302
6.6m

LTTDT
Location / Town:

WASTE LONDON N/A 50


Scale: Sheet Size: Rev:

6212
Site Name:

5203 4202
5.8m 16.4m

6211 5207 5209 6209


Multistorey Car Park El Sub Sta

3279 WO

Project Name:

THAMES CON 150 S


Contract Name:

TUNNEL

IL12.37m
Tennis Courts

7219 VMH WW HW 7211 BS SE


Outfall

SITE SUITABILITY REPORT


Drawing Title:

5208
Bowling Green

6851 6208

SITE SERVICES AND GEOLOGY PLAN BUCKHOLD - C07BF - LARGE CSO


3277
Drawing No.:

5205
Pavilion

6203

7202

PLOTTED ON

03\09\09

BY

danny.boxell

LOCATION :

Thames Tideway Tunnel

X:\Project\371840\CAD\Design Data\CAD Thames\Drawings\Planning-Consents\Routewide\100-DL-PNC-C07BF-147201.dgn

King Georges Park

c Thames Water Utilities Ltd 2008

LVHTCABGWF

WFGT

100-DL-PNC-C07BF-147201

1:1000

A1

AB

100

150

SW

WFLVT

Site Suitability Report C07BF Appendix 7

APPENDIX 7 CONSTRUCTION PHASE LAYOUT

Appendix 7 - Page 1
100-RG-PNC-C07BF-900001.doc

6
DO NOT SCALE - IF IN DOUBT ASK
Status:

FB
Keyplan:

WORK IN PROGRESS
N

Works

The Business Village


Traders Hall

DRAWING LOCATION

TCB
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2008. ALL RIGHTS RESERVED

Works
NOTES:

ORDNANCE SURVEY LICENCE NUMBER 100019345

1. REQUIRED CLEARANCE TO PROPOSED NATIONAL GRID WIMBLEDON TO KENSAL GREEN CABLE TUNNEL TO BE CONFIRMED

Traders Hall
300m PRIMARY CRANE

Multistorey Car Park

King Georges
400m CSO DROP SHAFT 6m ID

Multistorey Car Park

View Court

Park
EGRESS

Multistorey Car Park Traders Hall Traders Hall

SECONDARY CRANE

Multistorey Car Park

FLAP VALVE CHAMBER KEY: 300m EXCAVATED MATERIAL AND HANDLING AREA CSO CONNECTION CULVERT 1.5m SQUARE STOCKYARD, WORKSHOP AND STORES

5.5m

CSO INTERCEPTION CHAMBER

Day Centre

Day Centre

OFFICES, WELFARE AND CANTEEN

CSO DROP SHAFT, CSO CONNECTION CULVERT, PRIMARY CRANE, SECONDARY CRANE AND CSO INTERCEPTION CHAMBER

300m

El
POWER SUPPLY ACCESS TEMPORARY WORKING AREA = 1991m DISCLAIMER:

Sub Sta 1 to 72 Albon


10 m

INDICATIVE CONSTRUCTION PHASE ARRANGEMENT. BASED ON PRELIMINARY ASSESSMENT.

10 m

5.7m

Clinic

Clinic

House

SCALE 1 : 250

SITE BOUNDARY AREA= 5411m

BUCKHOLD ROAD SEWER

PROPOSED NATIONAL GRID WIMBLEDON TO KENSAL GREEN CABLE TUNNEL

AB

DRAFT-SECOND ISSUE

AP AP
Dsgnr

RS RS
Chkd

DA DA
Appd

03.09.09 27.08.09
Date

AA DRAFT-FIRST ISSUE
Iss Description

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Location Code: OS Reference: Security Reference: Drawn By:

N/A
Project Group:

UBR
Sub Process:

AP

LTTDT
Location / Town: Site Name: Project Name:

WASTE LONDON N/A 50


Scale: Sheet Size: Rev:

THAMES TUNNEL
Contract Name:

SITE SUITABILITY REPORT


Drawing Title:

1 toBUCKHOLD 72 ROAD - C07BF - LARGE CSO


Drawing No.: PLOTTED ON 03\09\09 BY danny.boxell LOCATION : Thames Tideway Tunnel X:\Project\371840\CAD\Design Data\CAD Thames\Drawings\Planning-Consents\Routewide\100-DL-PNC-C07BF-147202.dgn

CONSTRUCTION PHASE LAYOUT

Lake

c Thames Water Utilities Ltd 2008

Edwyn

100-DL-PNC-C07BF-147202

1:250

A1

AB

100

150

200mm

Site Suitability Report C07BF Appendix 8

APPENDIX 8 OPERATIONAL PHASE LAYOUT

Appendix 8 - Page 1
100-RG-PNC-C07BF-900001.doc

6
DO NOT SCALE - IF IN DOUBT ASK
Status:

FB
Keyplan:

WORK IN PROGRESS
N

Works

The Business Village


Traders Hall

DRAWING LOCATION

TCB
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2008. ALL RIGHTS RESERVED

Works
NOTE:

ORDNANCE SURVEY LICENCE NUMBER 100019345

1. HARDSTANDING INDICATED FULLY ENCOMPASSING SHAFT/ TOP STRUCTURE. REDUCTION IN AREA CAN BE CONSIDERED. 2. ACCESS OPENING TO INTERCEPTION CHAMBER IS INDICATIVE ONLY.

Traders Hall
PERMANENT ACCESS 2m x 0.6m x 1.5m HIGH ELECTRICAL CONTROL KIOSK SHAFT 6m I.D.

Multistorey Car Park

3. IT MAY BE POSSIBLE FOR SMALL VEHICLES TO ACCESS THROUGH THE PARK ENTRANCE. (IT IS LIKELY THAT PARK VEHICLES USE THIS OR ANOTHER ENTRANCE.)

King Georges Park

Multistorey Car Park

View Court

PARK ENTRANCE

Multistorey Car Park Traders Hall


3m x 3m FLAP VALVE CHAMBER @107m (AOD +100)

Traders Hall

6m x 4m TOP STRUCTURE @ 107m (AOD +100)

Multistorey Car Park

1.5m SQUARE CONNECTION CULVERT

10m HIGH VENT COLUMN PENSTOCK ACCESS

ACCESS

PERMANENT HARDSTANDING FOR FUTURE CRANE ACCESS

6.8m x 3.8m INTERCEPTION CHAMBER

5.5m

Day Centre

Day Centre

El Sub Sta
DISCLAIMER: BUCKHOLD ROAD SEWER

1 to 72 Albon

INDICATIVE OPERATION PHASE ARRANGEMENT, BASED ON PRELIMINARY ASSESSMENT

5.7m

Clinic

Clinic

House

10 m

10 m

SCALE 1 : 250

PROPOSED NATIONAL GRID WIMBLEDON TO KENSAL GREEN CABLE TUNNEL

AB

DRAFT-SECOND ISSUE

AP AP
Dsgnr

RS RS
Chkd

DA DA
Appd

03.09.09 27.08.09
Date

AA DRAFT-FIRST ISSUE
Iss Description

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Location Code: OS Reference: Security Reference: Drawn By:

N/A
Project Group:

UBR
Sub Process:

AP

LTTDT
Location / Town: Site Name: Project Name:

WASTE LONDON N/A 50


Scale: Sheet Size: Rev:

THAMES TUNNEL
Contract Name:

SITE SUITABILITY REPORT


Drawing Title:

1 toBUCKHOLD 72 ROAD - C07BF - LARGE CSO


Drawing No.: PLOTTED ON 03\09\09 BY danny.boxell LOCATION : Thames Tideway Tunnel X:\Project\371840\CAD\Design Data\CAD Thames\Drawings\Planning-Consents\Routewide\100-DL-PNC-C07BF-147203.dgn

CONSTRUCTION PHASE LAYOUT

Lake

c Thames Water Utilities Ltd 2008

Edwyn

100-DL-PNC-C07BF-147203

1:250

A1

AB

100

150

200mm

6
DO NOT SCALE - IF IN DOUBT ASK

VENTILATION COLUMN (CSO)

Status:

WORK IN PROGRESS
Keyplan:
N

A
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND 107m (AOD +100) REMOVABLE COVER ABOVE WEIR (LOCKABLE) DATABASE RIGHT 2008. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO A LOCAL HEIGHT DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

NOTE:
4m

3m

6m

1. STRUCTURE TO BE PROTECTED BY REMOVABLE HANDRAILS IN THE TEMPORARY CASE. 2. POSITION OF COVERS ARE VARIABLE WITHIN 10m FROM THE EDGE OF THE STRUCTURE, AND THE LOCATION IS BASED ON SITE SPECIFIC REQUIREMENT 3. CLADDING OF VENTILLATION BUILDING TO SUIT LOCATION AND AESTHETICS. 4. ALL TOP STRUCTURES TO HAVE:ACCESS STAIRS/LADDER TEMPORARY OR PERMANENT HAND RAILING 5. ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE STATED. GROUND LEVEL

10000

5m

REMOVABLE COVERS ARE SPLIT UP INTO SECTIONS AND SUPPORTED BY BEAMS, WHICH ARE ALSO REMOVABLE

1m DIA

SCALE 1:50

DIAGRAMMATIC REPRESENTATION OF TOP STRUCTURE ABOVE CSO SHAFTS ELECTRICAL CONTROL KIOSK (CSO)

- - - - - - 1500 - - AB DRAFT-SECOND ISSUE IL RS


Dsgnr

GT DS
Chkd

GT CH
Appd

27-11-09 - 22-05-09
Date

AA DRAFT-FIRST ISSUE
Iss Description

60

2000
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Location Code: OS Reference: Security Reference: Drawn By:

N/A
Project Group:

---

UBR
Sub Process:

AP

LTTDT
Location / Town: Site Name: Project Name:

WASTE LONDON N/A 50


Scale: Sheet Size: Rev:

THAMES TUNNEL
Contract Name:

SITE SUITABILITY REPORT


Drawing Title:

SCALE 1:25

GENERIC ELEVATION AND TOP STRUCTURE FOR OPERATIONAL PHASE LAYOUT - CSO SITES
Drawing No.:

PLOTTED ON

04\12\09

BY

Andy.Purdy

LOCATION :

Thames Tideway Tunnel

x:\project\371840\cad\design data\cad thames\drawings\planning-consents\Routewide\100-DH-GEN-00000-000001.dgn

c Thames Water Utilities Ltd 2008

100-DH-GEN-00000-000001

NTS

A1

AB

100

150

200mm

VARIBLE DEPENDING ON

Site Suitability Report C07BF Appendix 9

APPENDIX 9 ENVIRONMENTAL APPRAISAL TABLES

Transport Small CSO site Site considerations Access to road network Comments Site accesses onto Neville Gill Close approximately 20 to 30m south east of the junction with Buckhold Road. No visibility issues at this location. Access would need construction. May require reconfiguration of the junction of Neville Gill Close with Buckhold Road to provide a sufficient swept path for HGVs to turn right out of the junction as location of existing refuge island may hinder right turn movements by HGVs (access to TLRN is via right turn). Neville Gill Close is subject to a 30mph speed limit and lit. Road lightly trafficked. Site located within 200m of TLRN strategic highway network. Route to TLRN unconstrained providing sufficient space for right turn available. Mitigation required and conclusions Site accesses onto Neville Gill Close. Access would need construction. May require reconfiguration of the junction of Neville Gill Close with Buckhold Road to allow HGV movements. Route to TLRN strategic highway network unconstrained assuming right turn possible from Neville Gill Close. Comments Temporary construction site access and egress are onto Neville Gill Close. A one-way system through the site for construction vehicles is proposed. The site access and egress are located approximately 50m and 20m south of the junction with Buckhold Road respectively. The access/egress would require construction. Visibility from the site egress appears to be adequate. Permanent site access is onto Buckhold Road and would require construction. Park fencing and guard railing would also need to be removed. The access is located within close proximity to a signalised junction to the southwest. Several footways within the park would require closure and diversion. Neville Gill Close and Large CSO site Mitigation required and conclusions Construction of site accesses and egress required. Park fencing and guard railing needs to be removed. Several footways within the park would require closure and diversion. Route to the TLRN (A3) possible but may require the reconfiguration of the junction between Neville Gill Close and Buckhold Road to enable adequate swept paths for construction vehicles.

Appendix 9 - Page 1
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Transport Small CSO site Site considerations Comments Mitigation required and conclusions Comments Buckhold Road are street lit and subject to 30mph speed limits. Neville Gill Close was noted to be lightly trafficked. Access route to the A3 (TLRN strategic highway network) uses Neville Gill Close and Buckhold Road. The junction between Neville Gill Close and Buckhold Road may require reconfiguration to provide adequate swept paths for HGVs, as an existing refuge island may hinder right turn movements (access to TLRN is via right turn). Route otherwise unconstrained. Distance 0.2km to the TLRN (A3). Access to river River access not required for CSO site. River access not required as excavated material would be transported away by road. Site remote from river, although river access not required for a CSO site as excavated material would be transported away by road. Access to existing railway sidings at Clapham Junction from the TLRN (A3) onto the A217 and the gyratory between the A217 and A3205 Site remote from river, although river access not required for a CSO site. Large CSO site Mitigation required and conclusions

Access to rail

Possible use of existing rail connections to the sidings at Clapham Junction. Rail link only 1.4 miles from site.

Possible rail connection at Clapham Junction. Route to rail link acceptable should right turn be possible from Neville Gill Close.

Route to possible rail link at Clapham Junction runs through a high street area along St Johns Hill and under one rail bridge with no

Appendix 9 - Page 2
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Transport Small CSO site Site considerations Comments No obvious constraints on route from site to rail connection (other than swept path issue at Buckhold Road/ Neville Gill Close junction). Mitigation required and conclusions Comments turning onto the A214. The route then leads onto East Hill following onto St Johns Hill before turning onto Plough Road for the Clapham Junction, Traincare Depot railway sidings. The route passes under one rail bridge (on Trinity Road) with no visible restrictions and through a high street area along St Johns Hill. Distance 1.8km to rail access point from site. Parking Some parking could be provided onsite. NCP car park located directly adjacent to site if onsite parking not feasible or shortfall. PTAL 3-4 (Medium) as identified within Table 2.3. Potential need to modify Buckhold Rd/ Neville Gill Close junction to facilitate HGV right turn onto Buckhold Road. Access would need No parking issues. Some onsite, any shortfall could be accommodated in NCP. Some parking could be provided onsite for workforce. A car park is also located directly adjacent to the site which could allow workforce parking. As for small, see left. Some parking could be provided onsite for workforce. The car park nearby could also allow workforce parking. As for small, see left. Large CSO site Mitigation required and conclusions visible restrictions. Clapham Junction railway sidings at the Traincare Depot accessible using Plough Road.

Public transport accessibility

Reasonable potential for workforce to access site via public transport. Possible modifications required at Buckhold Road/ Neville Gill Close junction. Access would need construction.

Traffic Management

Construction of the new site accesses and egress. Removal of park fencing and guard railing. Closure and diversion of footways with the park.

Site accesses/egress require construction, park fencing and guard railing need to be removed, footways within the park require diversion and the Buckhold Road/Neville Gill

Appendix 9 - Page 3
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Transport Small CSO site Site considerations Comments construction. Mitigation required and conclusions Comments Possible reconfiguration of the Buckhold Road/Neville Gill Close junction to allow sufficient construction vehicle swept paths (removal of island). Large CSO site Mitigation required and conclusions Close may require reconfiguration.

Summary

The site is suitable as a small CSO site although access onto Neville Gill Close would require construction and there may be a need to modify the layout of the Buckhold Road/ Neville Gill Close junction to allow HGVs to be able to turn right from Neville Gill Close. Other than this no constraints are identified on route to the TLRN (200m away) or to the rail connection. Some parking could be provided onsite for the workforce and there may be potential to utilise the nearby car park to accommodate any shortfall. There is reasonable potential for the workforce to utilise public transport to access the site.

The site is suitable as a large CSO site although access and egress would require construction and some park fencing and guard railing would need to be removed and several footways within the park would require closure and diversion. The Buckhold Road / Neville Gill Close junction may require reconfiguration to allow swept paths for construction vehicles turning right to access the TLRN (A3). Road access is suitable, with no other visible constraints along the route. The route to a rail link at Clapham Junction is possible, albeit passing through a high street area. Some parking could be provided onsite for the workforce and there may be potential to utilise the nearby car park to accommodate any shortfall. There is reasonable potential for the workforce to utilise public transport to access the site.

Appendix 9 - Page 4
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Archaeology Site considerations Comments Designations, including Archaeological Priority Areas The site is within the Wandsworth Archaeological Priority Area.
th th

Small CSO site/Large CSO site Mitigation required and conclusions A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development. A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development. A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development.

Summary of historical uses

The 19 /20 century OS maps show a possible wide ditch or possibly a water course oriented north-east-south west across the approximate centre of the site. No archaeological receptors are recorded within the site. An archaeological evaluation and excavation took place in 1992 38m to the north west and outside of the site. The work revealed brick lined watercourses and structural remains of post medieval date. This does not preclude the possibility of unrecorded archaeological receptors of this nature being present within the site. No archaeological receptors are recorded within the site. This does not preclude the possibility of unrecorded archaeological receptors of medium value being present within the site None recorded.

Potential receptors of very high or high value with the potential to be directly affected

Potential receptors of medium value with the potential to be directly affected Other receptors with the potential to be directly affected

A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development. A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development. A detailed desk based assessment is required to sufficiently understand the archaeological resource and define risk to potential development.

Extent of existing disturbance (if known)

Geotechnical data is currently insufficient to assess below ground conditions although boreholes located in the general area show up to 7m of made ground, some of which may be archaeological. The presence of medieval deposits in the area suggests some level of preservation to be likely.

Appendix 9 - Page 5
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Archaeology Site considerations Comments Potential issues Detailed design proposals, and an outline method statement would be required to enable initial assessment of development impacts, and to inform mitigation proposals. With the currently available information it is not possible to highlight specific potential issues. Small CSO site/Large CSO site Mitigation required and conclusions Mitigation methods could include: Desk based assessment Production of deposits model Archaeological monitoring of geotechnical investigations Archaeological evaluation Archaeological watching brief Archaeological excavation. Summary The site is potentially suitable as either a small or a large CSO site although due to a lack of previous investigations in the area the nature and extent of archaeological receptors cannot be confidently predicted. It is possible that archaeological receptors of high or medium value may be present, although the site currently has no records of archaeological remains. While no direct evidence has been revealed, waterlogged remains and peat deposits of high or medium value may also be present. Peat deposits containing archaeological material have been commonly recorded throughout London in a similar proximity to the River Thames and it is a reasonable assumption to suggest waterlogged remains of archaeological value may be present.

Appendix 9 - Page 6
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Built heritage and townscape Site considerations Comments Designations including Conservation Areas, including trees Listed Buildings Down Lodge, Merton Road, Grade II: 115m 140-142 Wandsworth High Street, Grade II: 150m Church of All Saints, Wandsworth High Street, Grade II*: 190m 1-6 Church Row, Grade II*: 200m 7, 8 & 9 Church Row, Grade II: 235m Old County Court House, Garratt Lane, Grade II: 220m 23 West Hill, Grade II: 250m Locally Listed Buildings There are no locally listed buildings within 250m of C07BF. Conservation Areas Wandsworth Town Centre Conservation Area: 90m West Hill Road Conservation Area: 160m Registered Historic Parks & Garden There are no registered historic parks and gardens within 250m of C07BF. Locally Listed Parks and Gardens There are no locally listed parks and gardens with 250m of C07BF. Small CSO site/Large CSO site Mitigation required and conclusions In the case of listed buildings and conservation areas, a high quality scheme design and adequate screening for the development may be required, as discussed below. A detailed desk-based assessment in conjunction with archaeology work would be required to further determine the likely impact of the development and to inform more detailed mitigation proposals.

Appendix 9 - Page 7
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Built heritage and townscape Site considerations Comments Protected Views There are no protected views within 250m of C07BF. Potential receptors of medium to very high importance with the potential to be directly affected Other receptors of lesser importance with the potential to be directly affected Potential receptors of medium to very high importance with the potential to be indirectly affected Not Applicable Not Applicable Small CSO site/Large CSO site Mitigation required and conclusions

Not Applicable

Not Applicable

There is the potential for 7 listed buildings (two Grade II* and five Grade II buildings) and 2 conservation areas (the Wandsworth Town Centre Conservation Area and the West Hill Road Conservation Area) to be indirectly affected by C07BF.

Of the 7 listed buildings within 250m of C07BF, only one (Down Lodge, Merton Road, Grade II) shares a visual relationship with the site. The development therefore has the potential to impact upon the setting of this listed structure and mitigation in the form of a high quality scheme design and/or screening may be required. The other 6 listed buildings are unlikely to experience any impact and mitigation would therefore not be required. Neither the Wandsworth Town Centre Conservation Area nor the West Hill Conservation Area share a visual relationship with the site, reflecting the built up character of the local area. Consequently, no visual impact is expected or any form of mitigation required.

Other receptors of lesser importance with the potential to be indirectly affected

Not Applicable

Not Applicable

Sensitive landscape character areas likely to be affected, including trees and TPOs

Site wholly within Industrial Employment Area. Sensitive site on the northern corner of King Georges Park.

Retention of trees where possible and protection in accordance with BS 5837. Introduction of landscape scheme to include appropriate

Appendix 9 - Page 8
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Built heritage and townscape Site considerations Comments The site is mostly covered with mature trees, vegetation and part of a pond. Buckhold Road with residential properties to the west and with industrial units to the north, South Circular Road to the north, Neville Gill Close with multi-storey mixed use development to the east, King Georges Park to the south. The removal of mature vegetation would increase openness of site. The presence and operation of machinery, materials stores and buildings would result in temporary, adverse direct impacts on the character of the park and temporary, adverse indirect impacts on neighbouring areas. Permanent elements would result in permanent, adverse direct impacts on the character of the King Georges Park. Potential views likely to be affected Open views from residential properties, mixed use properties, and King Georges Park. Partially interrupted views from residential properties along Buckhold Street and South Circular Road. During construction, views of cranes from surrounding residences. Open views of vent column from Buckhold Road. During construction, the use of hoardings and appropriate lighting would help minimise visual impact. Design of top structure, vent column, and electrical kiosk to be given careful consideration. Planting to screen permanent plant. Removal of mature vegetation would be visually significant, therefore, adequate new planting would be important to protect visual amenity. This site is less suitable due to being highly visible, both, during construction and operation. Small CSO site/Large CSO site Mitigation required and conclusions surface treatments and planting to replace lost vegetation and re-establish planted character of park. Removal of mature vegetation and the presence and operation of machinery, materials stores and buildings onsite would impact character of site. There would be loss of open space and mature vegetation.

Appendix 9 - Page 9
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Built heritage and townscape Site considerations Comments Particular considerations on sites where new permanent structures are required Permanent structures at C07BF have the potential to have an indirect effect upon the setting of one Grade II listed building (Down Lodge, Merton Road). The appearance of any above ground structures would need to be carefully considered in the scheme design and some form of screening for the site may be required. The development could result in direct impacts upon the character of King Georges Park, public open space and local views as well as an indirect impact upon one listed building. However, there is the potential to mitigate any adverse impacts through a high quality scheme design and/or screening. Small CSO site/Large CSO site Mitigation required and conclusions Any permanent structures would need to be of a high quality design and/or screened in order that the visual impact of the development upon the Grade II listed Down Lodge is minimised.

Potential issues

The scheme design would need to be of a sufficiently high quality and may need to incorporate some screening in order that the potential visual intrusiveness of the development upon the local townscape character and upon the setting of one listed building is mitigated.

Summary

From a built heritage perspective, the site is suitable as either a small or a large CSO site because it would not result in any direct impacts upon the historic built environment; it does, however have the potential to impact upon the setting of one Grade II listed building. Mitigation in the form of a carefully considered scheme design and/or screening of the site would minimise any adverse impacts. In townscape terms, the site is considered to be less suitable as either a small or a large CSO site because it could result in direct adverse impacts upon the character of King Georges Park, public open space and local views, and woul d be highly visible during both construction and operation.

Appendix 9 - Page 10
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Water resources hydrogeology and surface water Site considerations Comments Hydrogeological conditions (Groundwater and Surface Water) From BGS Geological Model giving average ground condition profile. Local near surface conditions may vary, particularly within the river Geology (thickness) Superficial Geology and Made Ground (7m) London Clay (51m) Lambeth Group (15m) Thanet sand (13m) Hydrogeology Piezometric Level in Chalk Aquifer: ~ -20mAOD (~27 mbgl) from EA Jan 08 water level contouring Groundwater Monitoring Location EA Hydrometry Sites: TQ27-159 - approximately 237m northeast of the site (water levels to March 2009) Watercourses River Thames approximately 800m away to south Pond within site boundary SPZs and groundwater users SPZ Not located in a Source Protection Zone EA Licensed Groundwater Abstractions and Details No public water supply 4 licensed abstraction borehole within 2 km radius
Licence Numbers: 1. 28/39/39/0177 (2 boreholes) 2. 28/39/42/0071 (1 borehole)

Small CSO site/Large CSO site Mitigation required and conclusions The drop shaft would be constructed to an invert level of approximately 33.11mbgl therefore the shaft would be founded in the London Clay. Piezometric head in Chalk is approximately 6.11m above the base of the construction.

A simple volumetric approach has been used to calculate the 400 days travel times of the abstraction borehole. A conservative mean annual recharge of 100 mm/year was used to calculate a radius for licensed abstraction boreholes as follows;
1. 109m 2. 137m 3. 80m

Appendix 9 - Page 11
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Water resources hydrogeology and surface water Site considerations Comments


3. 28/39/41/0081 (1 borehole) Locations: 1. 1.5km northwest of the site (other side of the River Thames) 2. 1.02km northeast of the site 3. 154m south of the site Operator: 1. Trustees of the Hurlingham Club 2. Hanson Quarry Prod Europe Ltd 3. London Borough of Wandsworth Abstracted Aquifer Unit: 1.Gravel 2. Chalk 3. Chalk Abstraction Purposes: 1. Industrial, commercial and public service (sports grounds/facilitiesspray irrigation) 2. Industrial, commercial and public service (mineral products-general use) 3. Industrial, commercial and public service (municipal grounds-make up or top up water) Abstraction Quantity (annual): 1. 15,000m3 2. 23,515m3 3. 8,000m3

Small CSO site/Large CSO site Mitigation required and conclusions As a result, the shaft is not located within any of these catchment areas.

Appendix 9 - Page 12
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Water resources hydrogeology and surface water Site considerations Comments Local Authorities (LA) Unlicensed Groundwater Abstractions and Details No abstraction borehole within 1km radius inside Wandsworth Council Boundary Borehole locations and depths There are historical records of 2 deep water wells within 1 km radius. Depth range: 101.8 192.02m Potential impacts on surface water features The site is located approximately 800 metres south of the River Thames. The northern edge of the pond in King Georges Park is within the site boundary. However, the works are not likely to directly affect the pond. There is a direct pathway for pollution to the pond. More detailed investigation is required to determine the importance of the pond. There is no direct pathway for pollution to any other surface water feature. Potential impacts on groundwater (resources and quality) No impact on groundwater at depth is likely since the drop shaft is to be constructed in London Clay (non aquifer). At shallow depth, the shaft is located in Kempton Gravel which is classified as a minor aquifer. Limited impact on shallow aquifer if water is excluded from the excavation by diaphragm wall or caissons. No mitigation required if groundwater is not impacted. See below (likely types of mitigation measures that would be required). Work needs to be undertaken in consideration of Pollution Prevention Guidelines PPG1, PPG5 and PPS23. Small CSO site/Large CSO site Mitigation required and conclusions

Likely types of mitigation measures that would be required

Not applicable

Appendix 9 - Page 13
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Water resources hydrogeology and surface water Site considerations Comments Potential issues The drop shaft to be excavated in London Clay but to below piezometric head in Chalk. Potential pressure effects. Limited impact on flow in shallow aquifer. Summary Small CSO site/Large CSO site Mitigation required and conclusions Confined head in Chalk to be considered as part of geotechnical design. Impact on and mitigation for shallow aquifer would depend on construction design.

In terms of hydrogeology, this site is suitable as either a small or a large CSO site because the drop shaft is to be constructed in London Clay (non aquifer). The Chalk piezometric head is likely to be approximately 6.1m above the base of construction and should be taken into account in the engineering design. No impact on the Chalk aquifer is expected. The superficial deposits are Kempton Gravel which is classified as a minor aquifer at the shaft site and a limited impact on flow in shallow aquifer is anticipated due to diaphragm wall or caissons. In terms of surface water resources, this site is less suitable as either a small or a large CSO site because of the risk of overland pollution to the pond on the site and as such, specific mitigation would be required.

Appendix 9 - Page 14
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Ecology (terrestrial and aquatic) Site considerations Comments Statutory designations Non-statutory designated wildlife sites BAP priority habitats Lower Wandle LNR is 2km from site. Site is within King Georges Park BGII site of importance for nature conservation Within King Georges Park, the London BAP habitat Parks, Squares and Amenity Grassland would be subject to land take. The site boundary encompasses the edge of a lake present within King Georges Park, a feature that qualifies under UK BAP priority habitat Ponds. Small CSO site/Large CSO site Mitigation required and conclusions None required Any constructions affecting the Park, including temporary works would require compensatory habitat provision. Postworks restoration is also likely to be required. Any constructions affecting the parkland and amenity grassland, including temporary works would require compensatory habitat provision. Post-works restoration is also likely to be required. The lake is a noted feature of the park. An aquatic invertebrate survey would be required and land take from it would require compensatory habitat provision. Post-works restoration is also likely to be required. For works adjacent to the lake, working practices would need to be designed to avoid impacts from run-off and atmospheric pollutants into the lake, which contains species known to require unpolluted water. Protected or otherwise notable species within the Study Area Trees within the site boundary may have the potential to support roosting bats. For any trees to be removed during construction, if bat roosts were found to be present, mitigation would be required, possibly including offsite provision. Careful placement of lighting to minimise illumination of surrounding habitat is likely to be required. Mitigation would be possible but may require offsite provision. No mitigation necessary assuming desk study reveals no GCN within 2km. Not applicable

Habitats onsite are suitable for reptile species. NBN Gateway does not suggest Great Crested Newts (GCN) records within 2km, but this area of the site does provide suitable habitat aquatic and terrestrial. No direct impact on aquatic receptors. Potential issues No other issues

Appendix 9 - Page 15
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Ecology (terrestrial and aquatic) Site considerations Comments Summary Small CSO site/Large CSO site Mitigation required and conclusions

The site is less suitable as either a small or a large CSO site due to the requirement for temporary and permanent land take from King Georges Park - Site of Borough Importance (SBI) for Nature Conservation. Land take from a London and possibly UK Biodiversity Action Plan (BAP) habitat within this SBI would also require offsite mitigation/compensation solutions as well as potentially extensive post-works restoration requirements.

Appendix 9 - Page 16
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Flood risk assessment Site considerations Comments Flood Risk Zone The site is located partially within flood zone 3 up to a 1 in 200 year risk of tidal flooding, flood zone 2 between 1 in 200 year risk and 1 in 1000 year risk of flooding and within flood zone 1. The SFRA for Wandsworth shows that the site benefits from the protection afforded by defences on the River Thames and the River Wandle. The defences are to the 1 in 1000 year standard. Sewage transmission infrastructure is considered to be water compatible according to table D.2 of PPS25 Assessment of conditions for SuDS Potential issues Summary There is space onsite for the provision of SuDS. The site may not be suitable for infiltration SuDS and investigation would be required to determine suitability. No other issues Not applicable Small CSO site/Large CSO site Mitigation required and conclusions A FRA would be required to assess the risk of flooding to the site.

Not applicable

The site is suitable as either a small or large CSO site because it is defended to the 1 in 1000 year design standard; however, a flood risk assessment would be required. There is space for SuDS although an investigation would be required to determine the suitability for infiltration SuDS.

Appendix 9 - Page 17
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Air quality Site considerations Comments AQMA Sensitive Receptors The air quality objective for NO2 is exceeded on major roads in the vicinity of the site. There are residential properties along West Hill (A3), Wandsworth High Street (A3) and Buckland Road (A218). The nearest residential properties are around 35m from the site on Park View Court. Existing traffic issues Existing sources of significant air pollutants Notable gaps in existing air quality monitoring Potential issues The main traffic issue in this area is exhaust emissions from vehicles along the A3, A217, A218 and A3209 corridors. See existing traffic issues above. There is no data at likely access to the A218 and the nearest existing data indicates existing AQLV exceeded. The risk from additional exhaust emissions from construction HGVs is undefined at present. The risk from dust impacts at residential properties is moderate. Summary Small CSO site/Large CSO site Mitigation required and conclusions There is a need for more site specific data. There are relevant air quality sensitive receptors present along the route the construction traffic is likely to take and close to the proposed construction works.

Additional vehicle emissions have a high potential to interfere with local air quality action plan policies. See existing traffic issues above. Collect minimum 6 months diffusion tube data at the nearest residential receptors to the site access to A218 or other point of access to major road network. Minimise HGV movements on the local road network during the peak hours. Standard dust control measures would minimise the effect of fugitive dust on nearby sensitive receptors.

The site is less suitable as either a small or a large CSO site as there is potential for fugitive emissions of dust during construction to have a perceptible impact at residential properties in close proximity to the site. These impacts can be minimised with standard dust control measures. There is potential for HGV movements on the local road network to cause localised air quality impacts in areas of already poor air quality. This can to some extent be mitigated by minimising the movement of HGVs during peak hours.

Appendix 9 - Page 18
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Noise Site considerations Comments Noise band level (from Defra noise maps) Information from Defra noise maps indicates daytime noise levels of between 58 and 74 dB LAeq and night-time noise levels of between 50 and 65 dB LAeq at residential properties located close to the proposed site. The residential properties at Park View Court which face the site are likely to experience moderately high daytime and nighttime noise levels due to them overlooking the A218. Noise levels from the Defra noise maps provide an indication of prevailing noise levels only, and would not be employed in any detailed assessments for chosen sites. Sensitive Receptors There are sensitive receptors located to the west of the site at Park View Court, Broomhill Road. These consist of 4 storey high residential dwellings. Further residential properties are located to the south west on Buckhold Road and consist of 2 storey residential properties, and Edwyn House on Neville Gill Close is located to the south east and consists of 20 storey residential flats. Sensitive receptors at Park View Court are located at a distance of approximately 30m from the sites western boundary. Receptors at Buckhold Road to the south are located approximately 75m away. The site access route is proposed to be along Buckhold Road to the A3. There are only a few receptors located along this stretch of Buckhold Road and therefore there is unlikely to be an adverse noise impact from HGV traffic. Not applicable Small CSO site/Large CSO site Mitigation required and conclusions Not applicable

Appendix 9 - Page 19
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Noise Site considerations Comments Existing traffic issues Local road traffic, including the road traffic on the A218 to the west and north and the A3 to the north would contribute to the local noise climate in the area. Local road traffic, including the road traffic on the A218 to the west and north and the A3 to the north would contribute to the local noise climate in the area. Construction: The construction period is estimated at 0.5 to 2 years and working hours would be 12 hours per day (7am 7pm) Monday to Saturday. This has the potential to result in adverse noise impacts to any sensitive receptors in close proximity to the site. HGV movements are likely to result in adverse noise impacts on nearby sensitive receptors on Buckhold Road. The immediate site area is relatively large and, whilst the shaft location may be fixed, ancillary plant should be sited as far as is practicable from surrounding sensitive receptors. Situating plant in the eastern area of the site would maximise the distance between them and the nearest sensitive receptors and minimise potential disturbance. Proposed 3m site boundary fencing would provide useful noise mitigation to some plant and construction activities however it would not provide any attenuation to higher floor levels of residential flats located at Park View Court. Vibration resulting from general construction works is not anticipated to result in an adverse impact. The nearest receptors to the proposed shaft location are at a distance of approximately 35m and it is unlikely that vibration levels would result in minor cosmetic damage during shaft sinking but may give rise to annoyance. Vibration from tunnelling should be Adherence to the good site practices provided in BS5228. Siting of noisy equipment and construction activities as far as is practicable from sensitive receptors. Provision of site boundary noise fences. Small CSO site/Large CSO site Mitigation required and conclusions Not applicable

Existing sources of significant noise emissions Potential issues

Not applicable

Appendix 9 - Page 20
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Noise Site considerations Comments considered on a case by case basis at particular sensitive locations. Operation: With appropriate attenuation (if necessary), there is no reason why noise from the ventilation column and top chamber should result in adverse noise impacts to nearby sensitive receptors. Summary The site is considered suitable as either a small or a large CSO site as although the distance between the site and the nearest residential receptors at Park View Court is not large, the existing noise climate are moderately high due to existing road traffic on the A218 Buckhold Road. Any shielding afforded by the site perimeter barriers would be largely ineffectual due to the height of these receptors. Although it is anticipated there would be a large number of vehicles associated with the construction phase and the access route is proposed along Buckhold Road it is unlikely to cause an adverse noise impact due to a relatively small number of receptors along this road. Small CSO site/Large CSO site Mitigation required and conclusions

Appendix 9 - Page 21
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Land quality Site considerations Site Location Current Site Use Grid Reference: 525440, 174478 King Georges Park area. Site includes mature trees, grass and seating areas. Proposed site includes part of lake although construction phase layout avoids this feature and is close to the northern park boundary (borders the north of the lake in the case of a large CSO site). Relatively flat open site with mature trees. None observed Small CSO site/Large CSO site

Topography Field Evidence of contamination (ie, visual/olfactory) Current surrounding land use (immediately adjacent to site)

North: Buckhold Road, beyond which lies commercial and industrial properties (including The Business Village), an Army Cad et Force centre. East: Road - Neville Gill Close, beyond which lies a multi-storey car park, day centre (the Penfold Centre), high rise residential property (10 storey+), one block of two storey social housing. South: The park continues to the south with a day care centre (one oclock centre), childrens play area (and potentially sm all zoo marked on map, but area not entered) and Tennis Courts. West: Buckhold Road, beyond which lie 3 storey residential properties.

Geological and hydrogeological information Geological Strata


1

Superficial Geology and Made Ground (7m) London Clay (51m) Lambeth Group (15m) Thanet sand (13m)

Underlying Aquifer Classes

Non-Aquifer: London Clay Minor Aquifer: River Terrace Deposits, Lambeth Group, Thanet Sands Major Aquifer: Chalk

Appendix 9 - Page 22
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Land quality Site considerations Groundwater Vulnerability/ Soil Classification (High/Intermediate/Low/ 2 Not Applicable) Source Protection Zone Details Surface Water Receptor Not located in a Source Protection Zone Lake (onsite) River Wandle (190m northeast) Relevant Information within a 250m radius of the site Historical Potentially Contaminating Activities Onsite Open, undeveloped land, 1868-1871 Lake, (southeast corner of site), 1896-present Park (King Georges) 1983-present Offsite Factory or works, use not specified, (15m north), 1989 Reservoir infilled, (10m east), 1949 Numerous electricity sub-stations in eastern direction, (closest located 20m east), 1951 Gas mantle factory/plant, (45m northwest), 1920-1949 Factory or works, use not specified, (75m east), 1899-1948 River Wandle infilled, (closest location 85m southeast), 1949 Numerous tanks in eastern direction - contents not specified (closest located 95m northwest), 1951-1964 Electrical and Radio works, (100m northwest), 1951-1994 Potential fuel oil use/storage in northern direction (closest located 120m north), 1907 Mill, listed as flour mill 1868 (120m southeast), 1868 1951 Motor Body works (160m northwest), 1951 River Terrace Deposits - Minor Aquifer High Leaching Potential of Soils (U)
2

Small CSO site/Large CSO site

Appendix 9 - Page 23
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Land quality Site considerations Cemetery, (190m east), 1899-present Sewage pipe, (190m south), 1920-1949 Saw Mill (190m east), 1916-1965 Brewing and malting, (195m northeast), 1989-present Engineering works/garage (210m northwest), 1951-1994 Laundry (225m northeast), 1951-1952 Garage (225m northeast), 1953-1993 Dyes and pigment manufacturer, (230m southeast), 1899-1948 Pollution Incidents to controlled waters Two incidents: Oils, unknown, minor incident (75m east) Chemicals, unknown, minor incident (170m north) Landfill Sites Other Waste Sites Registered Radioactive Substances Fuel Stations/Depots Contemporary Trade Directory Entries None None None None Thirty-one Jewellery Manufacturers and Repairers, inactive (56m north) Toiletries, inactive (59m northwest) Tableware, inactive (80m north) Screen Process Printers, inactive (71m northwest) Record, Tape and CD Manufacturers and Wholesalers, inactive (83m west) Cleaning Materials and Equipment, active (84m west) Domestic Appliances Servicing, Repairs and Parts, inactive (84m west) Photographic Processors, active (85m southeast) Small CSO site/Large CSO site

Appendix 9 - Page 24
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Land quality Site considerations Electronic Engineers, inactive (95m north) Precision Engineers, inactive (98m west) Commercial Cleaning Services, active (98m west) Printers, active (98m west) Soft Drinks Manufacturers, active (98m west) Cleaning Services Domestic, inactive (99m west) Textile Printers, inactive (99m west) Printers, inactive (100m southwest) Hi-Fi Equipment Manufacturers and Distributors, active (101m southwest) Dry Cleaners, active (104m north) Furniture Reproduction, active (131m west) Fibre Optics, inactive (131m west) Office Furniture and Equipment, inactive (136m northwest) Printers, inactive (152m west) Commercial Cleaning Services, inactive (156m west) Glass Products Manufacturers, inactive (156m west) Leather Garments and Products, active (167m west) Car Dealers, active (167m northwest) Dry Cleaners, inactive (167m northwest) Car Dealers, inactive (174m north) Gas Suppliers, inactive (177m northwest) Fireplaces and Mantelpieces, inactive (199m west) Lighting Manufacturers, active (202m east) Small CSO site/Large CSO site

Appendix 9 - Page 25
100-RG-PNC-C07BF-900001.doc

Site Suitability Report C07BF Appendix 9

Land quality Site considerations Site Classification Based on Above Information Activity Potential Site Contaminants derived from surface sources (eg, contaminants in made ground) Potential Site Contaminants derived from offsite sources and transported to site 1) Some potential for made ground from potential filling operations during development of the park and lake 1) Works 2) Electrical sub- stations 3) Gas mantle factory Distance and Direction to Site 1) Onsite and directly adjacent to site Contaminants 1) Metals, PAHs, TPH Small CSO site/Large CSO site

1) 15m north 2) 20m east 3) 45m northeast

1) Metals, TPH, PAHs 2) PCBs 3) Metals, PAHs, TPH, Phenols, Sulphate, Cyanide

Potential Contamination Pathways to Site (Conceptual Site Model)


3

Source 1: A1, A3, B4, C5 Source 2: D6, E1, F7 Category 1 Assessed as Low Risk The site is suitable as either a small or a large CSO site, based on the low potential for contamination from historical onsite activities and distance from historical offsite sources. 1. From BGS Geological Model giving average ground condition profile. Local near surface conditions may vary, particularly within the river. 2. Soil information for urban areas is based on fewer observations than elsewhere in the country. Therefore a worst case vulnerability (H) is assumed until proven otherwise. 3. Refer to schematic Conceptual Site Model for explanation of site-specific source-pathway-receptors.

Contamination Category Summary

Notes

Appendix 9 - Page 26
100-RG-PNC-C07BF-900001.doc

Contacts
For information about the Thames Tideway Tunnel Call: 0800 0721 086 Lines are open 24 hours a day Visit: www.thamestidewaytunnel.co.uk Email: info@tidewaytunnels.co.uk For our language interpretation service call 0800 0721 086

For information in Braille or large print call 0800 0721 086


For information about acceptance of our application and the examination process please contact the Planning Inspectorate. Call: 0303 444 5000 Visit: http://infrastructure.planningportal.gov.uk

You might also like