VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK Created ADDING 2748 TO MUD SYSTEM 11 / 02 / 1996 TASK NO ADD03 Review Date PAGE 1 OF 2 26 / 7 / 1999

NO. 1.

STEP TRANSPORT DRUMS FROM OIL STORE ON TOP OF TANKS USING DRUM LIFTER & BASKET. OPENING CAPS ON DRUMS OF COREXIT. INSTALL PUMPS PUMP FLUID INTO TANKS REMOVE PUMP FROM DRUM. REMOVE DRUM FROM TOP OF TANKS. CLEAN CHECK AND

HAZARD SPILLAGE, DRUM COMING OF OUT LIFTER.

CONTROL SECURE DRUM TO BASKET. ENSURE DRUM LIFTER FITTED PROPERLY.

2.

PERSONNEL CONTAMINATION EG. EYES. SPILLAGE HOSE COMES OFF PUMP.

WEAR RECOMMENDED SAFETY GEAR, GLOVES, APRON, MASK & GOGGLES. ENSURE PUMP IS SECURE IN DRUM MAKE SURE HOSE IS SECURED TO TANK BEFORE PUMPING. FLUSH PUMP WITH FRESH WATER.

3.

4.

SPILLAGE CONTAMINATION TO SELF.

5.

SPILLAGE.

ENSURE CAPS ARE REPLACED TO DRUM.

6.

CLEAN TOP OF DRUM.

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
TASK Created NO. ADDING 2748 TO MUD SYSTEM 11 / 02 / 1996 HAZARD TASK NO ADD03 Review Date PAGE 2 OF 2 26 CONTROL / 7 / 1999

STEP RETURN ALL SAFETY GEAR TO LOCKER.

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED