RIG 453
TASK NO Created NIPPLE UP MUD CROSS 8 / 9 / 1996 TASK NO ADD05 Review Date PAGE 1 OF 3 / / 19..
NO. 1.
STEP PLANNING.
2.
ATTACH CRANE & DRILLING WORK SLING TO MUD CROSS, WITH LIFTING PLATE. REMOVE GRATING. LIFT AND TRANSFER MUD CROSS TO WORK SLING.
3. 4.
REFER JSA #1. DOGMAN AND SUFFICIENT OBSERVERS TO WATCH OPERATION. BE AWARE OF POSSIBLE OBSTRUCTIONS. ENSURE CLEAR PATH. USE RADIOS. HAVE FIRM GRIP ON SLING WHILST UNDOING SHACKLE..
5.
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK NO Created NO. CROSS. NIPPLE UP MUD CROSS 8 / 9 STEP / 1996 HAZARD HEIGHT SAFETY. PERSONNEL BELOW. LOAD SPINNING. POOR VISION. POOR COMMUNICATION. TASK NO ADD05 Review Date PAGE 2 OF 3 / / 19..
CONTROL CLEAR AREA BELOW. WEAR SAFETY HARNESS AND INERTIA REEL. USE TAG LINES. STOP LOAD BEFORE LOWERING ALL THE WAY DOWN. DOG LOAD FROM DOWNSTAIRS. USE RADIOS. USE DOGMAN AND RADIOS. USE CORRECT TOOLS. FIRM FOOTING/SAFE AREA FOR HAMMER TO SWING TO IF IT MISSES. OBSERVE HEIGHT SAFETY REQUIREMENTS. KEEP AREA BELOW CLEAR OF PERSONNEL. BE AWARE PINCH POINTS/KEEP HANDS CLEAR.
6.
POOR COMMUNICATION. TOOLS SLIPPING. HAMMER MISSING TARGET WHILST FLOGGING UP. HEIGHT SAFETY. DROPPED OBJECTS. PINCH POINTS.