ANGLO-EASTERN SHIP MANAGEMENT LTD.

, HONG KONG

BALLAST WATER MANAGEMENT PLAN


M. V. BONN EXPRESS Sec: BWM-A/Ch 4 Date: 20.01.2012 Revision: 2 Prep: AW Appr: KND Page 1 of 5

Chapter 4 Ballast Water Sampling Points


4.1 No separate ballast water sampling points are provided on this vessel. The usual procedure for obtaining samples is to obtain them through the sounding pipes of the individual tanks. Samples could be drawn from the sounding pipe using a portable extractor pump or sampling cups attached to sounding line. Additionally, manholes can give access to the ballast water tanks. In areas and conditions where it is deemed safe and practicable, the samples may be drawn from the tank access manholes. 4.2 Access to sampling points on the vessel are per the sounding plan here under :

NO SOUNDING PIPE

Anglo-Eastern Ship Management Ltd.

ANGLO-EASTERN SHIP MANAGEMENT LTD., HONG KONG

BALLAST WATER MANAGEMENT PLAN


M. V. BONN EXPRESS Sec: BWM-A/Ch 4 Date: 20.01.2012 Revision: 2 Prep: AW Appr: KND Page 2 of 5

TANK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Description
FPK TANK DEEP TANK 2 DB TANK 3 PORT DB TANK 3 STARBOARD DB TANK 4A PORT DB TANK 4A STARBOARD DB TANK 4B PORT DB TANK 4B STARBOARD DB TANK 5A PORT DB TANK 5A STARBOARD DB TANK 5B PORT DB TANK 5B STARBOARD WING TANK 2 PORT WING TANK 2 STARBOARD WING TANK 3 PORT WING TANK 3 STARBOARD HEELING TANK 4A PORT
HEELINGTANK 4A STARBOARD

Type of Sampling point


MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(1 NO) MAN HOLES (1 NO) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES (2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES (2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS) MAN HOLES(2 NOS)

Frame Number 243 & 232 202 152 & 183 152 & 183 127 127 108/26 & 115 108/26 & 115 104 & 108/7 104 &108/7 71 & 97 71 &97 183 & 202 183 & 202 166 & 182 166 &182

Distance from centre-line 0.00 0.00 5.90 5.90 8.97 8.97 10.03 10.03 10.05 10.05 9.07 9.07 6.76 6.76 12.74 12.74 14.91 14.91 14.96 14.96 14.95 14.95 0.00

WING TANK 4B PORT WINGTANK 4B STARBOARD WING TANK 5 PORT WING TANK 5 STARBOARD AFT PEAK

122 & 135 122 & 135 108/14 & 108/32 MAN HOLES(2 NOS) 108/14 &108/32 MAN HOLES(2 NOS) 84 & 104 MAN HOLES(2 NOS) 84 &104 MAN HOLES(1 NO) 14

4.3 Pipeline samples during deballasting or ballasting should be taken from the cock on the inlet side of the ballast pump in the engine room. 4.4 Quarantine or Authorized Officers must be advised of all safety procedures to be observed when entering enclosed space

APK

FPK

Anglo-Eastern Ship Management Ltd.

ANGLO-EASTERN SHIP MANAGEMENT LTD., HONG KONG

BALLAST WATER MANAGEMENT PLAN


M. V. BONN EXPRESS Sec: BWM-A/Ch 4 Date: 20.01.2012 Revision: 2 Prep: AW Appr: KND Page 3 of 5

Anglo-Eastern Ship Management Ltd.

ANGLO-EASTERN SHIP MANAGEMENT LTD., HONG KONG

BALLAST WATER MANAGEMENT PLAN


M. V. BONN EXPRESS Sec: BWM-A/Ch 4 Date: 20.01.2012 Revision: 2 Prep: AW Appr: KND Page 4 of 5

TANK FPK
NO DEEP TK NO 3 DB TANK(P) NO 3 DB TANK(S) NO 4A DB TANK (P) NO 4A DB TANK (S) NO 4B DB TANK (P) NO 4B DB TANK (S) NO 5A DB TANK (P) NO 5A DB TANK (S) NO 5B DB TANK (P) NO 5B DB TANK (S) NO2 WING TANK (P) NO 2 WING TANK (S) NO 3 WING TANK (P) NO 3 WING TANK (S)

Description 2 MANHOLES 2 2 MANHOLES 2 MANHOLES 2 MANHOLES 1 MANHOLE 1 MANHOLE 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES

Access type FPK STORE


CARGO HOLD NO BOTTOM FLOOR) CARGO HOLD NO (BOTTOM FLOOR) CARGO HOLD NO (BOTTOM FLOOR) CARGO HOLD NO BOTTOM FLOOR) CARGO HOLD NO (BOTTOM FLOOR) CARGO HOLD NO (BOTTOM FLOOR) 2 3 3 4 4 4

Frame Number 243 & 232 202 152 & 183 152 & 183 127 127

Distance from centre-line 0.00 0.00 5.90 5.90 8.97 8.97

CARGO HOLD NO 4 (BOTTOM FLOOR) CARGO HOLD NO 5.1 ( BOTTOM FLOOR) CARGO HOLD NO 5.1 ( BOTTOM FLOOR) CARGO HOLD NO 5.2 (BOTTOM FLOOR) CARGO HOLD NO 5.2 (BOTTOM FLOOR) PORT TUNNEL PASSAGEWAY & NO 2 CARGO HOLD STBD TUNNEL PASSAGEWAY &NO 2 CARGO HOLD PORT TUNNEL PASSAGEWAY & NO 3 CARGO HOLD STBD TUNNEL PASSAGEWAY & NO 3 CARGO HOLD PORT TUNNEL PASSAGEWAY & NO 4 CARGO HOLD STBD TUNNEL PASSAGEWAY & NO 4 CARGO HOLD PORT TUNNEL PASSAGEWAY & NO 4 CARGO HOLD AND NO 5.1 CARGO HOLD STBD TUNNEL PASSAGEWAY & NO 5.1 CARGO HOLD PORT TUNNEL PASSAGEWAY& 5.2 CARGO HOLD STBD TUNNEL PASSAGEWAY & 5.2 CARGO HOLD

108/26 10.03 &115 108/26 10.03 &115 104 & 108/7 10.05 104 &108/7 71 &97 71 &97 183 & 202 183 & 202 166 &182 10.05 9.07 9.07 6.76 6.76 12.74

2 MANHOLES

166 &182 122 &135 122 & 135 108/14 108/32 108/14 108/32 84 & 104 84 & 104

12.74 14.91 14.91 & 14.96 & 14.96 14.95 14.95 0.00

HEEL TK 2 MANHOLES 4A PORT HEEL TK 2 MANHOLES


4A PORT WING TANK PORT WING TANK STBD WING TANK PORT WING TANK STBD 4B

2 MANHOLES 2 MANHOLES 2 MANHOLES 2 MANHOLES 1 MANHOLES

4B 5 5

Anglo-Eastern Ship Management Ltd.

APK TANK

NO 6 HOLD

CARGO 14

ANGLO-EASTERN SHIP MANAGEMENT LTD., HONG KONG

BALLAST WATER MANAGEMENT PLAN


M. V. BONN EXPRESS Sec: BWM-A/Ch 4 Date: 20.01.2012 Revision: 2 Prep: AW Appr: KND Page 5 of 5