Drawdown Tests

In a drawdown test, bottomhole pressure is continuously measured with time, as the well is flowed at a constant rate. The reservoir and well pressures must be constant before the well starts flowing.

Information from Drawdown Tests

1. 2. 3. 4. 5.

Permeability Damage skin Distance to boundaries Depletion Variation in reservoir properties.

Analysis Method

Assumption: Infinite-acting (transient) flow

Analysis Method
or

Where

and

Semi-log Plot

Permeability and Skin


Flow Capacity

Skin Factor

Pressure Drawdown Example

Pressure Drawdown Example

Pressure Drawdown Example

Identifying MTR

Pressure Derivative Calculation

Pressure and Pressure Derivative

Modeling
A model is an idealization of a flow system A mathematical equation describing the flow system is solved to obtain reservoir and well parameters

Three things are required to make a model: Well type Reservoir type Boundary type

Modeling
In modeling we compare wellbore pressures calculated from the model with Wellbore pressures actually measured during the well test

Computer-Assisted Analysis

Recommended Steps:

1.Derivative Analysis 2.Straight Line Analysis 3.Modeling

Computer-Assisted Analysis

Software = SAPHIR