IS
UNION TEXAS
PETROLEUM
CASING AND TUBING
INSPECTION SPECIFICATION
JUNE, 1995
PREPARED BY
4/47 H HILL ASSOCIATES, INC.
‘fy fag EE QUALITY PROFESSI
12777 Jones 3) ONATS. (9) 955.2084UNION TEXAS PETROLEUM
TABLE OF CONTENTS (TOC)
TABLE OF CONTENTS
SECTION ONE: Date of Last Rev
INSPECTION STANDARD GUIDELINES June 1995
SCOPE
RESPONSIBILITIES
DEFINITIONS
SELECTING THE INSPECTION PROGRAM
WELD-ON CONNECTORS
RIG-SITE WELDING
INSPECTOR QUALIFICATION
SECTION TWO:
GENERAL REQUIREMENTS June 1995
SCOPE
INSPECTION COMPANY PERSONNEL,
EQUIPMENT AND MATERIAL
IDENTIFICATION OF OCTG
MATERIAL HANDLING
NOTIFICATION REQUIRED
EVALUATION OF IMPERFECTIONS - NEW PIPE,
POST INSPECTION REQUIREMENTS.
SECTION THREE:
INSPECTION PROCEDURES,
FULL LENGTH DRIFT June 1995
RACK HYDROSTATIC TEST June 1995
VISUALO THREAD INSPECTION June 1995,
‘THREAD GAGE INSPECTION June 1995,
SPECIAL END AREA. June 1995,
ELECTROMAGNETIC INSPECTION June 1995,
FULL LENGTH MAGNETIC PARTICLE June 1995
PORTABLE ROCKWELL HARDNESS TEST June 1995
ULTRASONIC WELDLINE June 1995
FULL BODY ULTRASONIC INSPECTION June 1995
LIQUID PENETRANT INSPECTION June 1995
BUTT WELD RADIOGRAPHY June 1995
ULTRASONIC BUTTWELD INSPECTION June 1995
TRACEABILITY June 1995
INSPECTION MONITORING June 1995,
June 1995 TOC-1