EMPIRICAL DESIGN METHODS UBC GEOMECHANICS RESEARCH CERM3 WORKSHOP

R. PAKALNIS - UBC

UBC MINING & MINERAL PROCESS ENGINEERING

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

INTRODUCTION
ANALYTICAL QUANTIFY ROCK MASS RELATE TO PAST PRACTICE OBSERVATIONAL PREDICTION

EMPIRICAL

SAFETY & WORKABLE


GEOMECHANICS DESIGN GROUP

UBC UBC MINING MINING & MINERAL & MINERAL PROCESS PROCESS ENGINEERING ENGINEERING

STOPE DESIGN PILLAR DESIGN SPAN DESIGN SUPPORT


1998
GEOMECHANICS DESIGN DESIGN GROUP GROUP GEOMECHANICS

UBC MINING & MINERAL PROCESS ENGINEERING

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

STRESS
INDUCED LOAD INPUT PARAMETERS GUESTIMATE

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

STRUCTURE
GEOMETRY SHEAR STRENGTH SUPPORT

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

ROCK MASS CLASSIFICATION


RMR (1976) Q - SYSTEM (1974)

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

OPENING DESIGN
STABILITY GRAPH (ELOS) CRITICAL SPAN CURVE

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

ELOS EQUIVALENT LINEAR OVERBREAK SLOUGH

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

RELAXED HW A=1 PARALLEL STRUCTURE B = 0.2, 0.3 WALL DIP

C = ( 8 - 6*COS f )

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

MODIFIED STABILITY GRAPH RADIUS FACTOR

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

RADIUS FACTOR = 1.1 X HYDRAULIC RADIUS

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

OPENING DESIGN
STABILITY GRAPH (ELOS) CRITICAL SPAN CURVE

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

SPAN DESIGN CURVE


Updated Span Design Curve (292 obs)
Span
Post Pillar Span

Span = Diameter of the largest circle which can be drawn between pillars and walls in plan view

Design Span (m)

UNSTABLE

STABLE

Rock Mass Rating


Unstable Potentially Unstable Stable

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

Updated Span Design Curve (292 obs)


Span
Post Pillar Span

Span = Diameter of the largest circle which can be drawn between pillars and walls in plan view

Design Span (m)

UNSTABLE

STABLE

WEAK ROCK MASS SEISMICITY

Rock Mass Rating


Unstable Potentially Unstable Stable

(5.5

2.5

2.5

5.5)

EXTENT OF FAILURE

6ft 5ft
(0.5*10ft*5ft*3ft)/11ft3/ton= 7ton

3ft x 3ft BOLT SPACING

10ft

GEOMECHANICS DESIGN GROUP

MINE APPLICATIONS
SPAN ESTIMATION

UBC MINING & MINERAL PROCESS ENGINEERING

NEURAL NETS USED TO ARRIVE AT A DESIGN CURVE NOT SOLELY AS A PRECDICTIVE TOOL/ BLACK BOX

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

PREDICTIVE TOOL
SPAN ESTIMATION
Original Data Stability Scatter Plot
RMR vs Sp an al l Case s pl ot 45 40 35 30 25 20 15 10 5 0 0 10 20 30 40 50 RM R (%) Stable P. Uns table 60 70

3
80

Span (m)

90

100

Unstable s table

E xpon. (st able)

Expon. (St able)

Ex pon. (P . Unst able)

292 CASE HISTORIES

(160 STABLE, 59 POT, 73 UNSTABLE)


GEOMECHANICS DESIGN GROUP

18 X 18 GRID NEURAL OUTPUT (324 pts)

UBC MINING & MINERAL PROCESS ENGINEERING

PREDICTIVE TOOL
SPAN ESTIMATION

NEURAL NET RESULTS IN CONTOUR PLOT OF 1=.100% STABLE TO 3=100% UNSTABLE TRAINING ERROR = 12%
Neural Network Stability Contour Plot
42.5

37.5

3.20 3.00 2.80 2.60 2.40 2.20

32.5

Span (m)

Unstable Zone
bl sta e

Span (m)

27.5

2.00 1.80 1.60 1.40 1.20

ne Zo

22.5

17.5

1.00 0.80 0.60 0.40 0.20

12.5

l tia n e t Po
0 10 20 30 40 50

Un

Stable Zone

7.5

0.00

60

70

80

90

100

2.5 10 20 30 40 50 60 70 80 90 100

RMR

RMR (%)

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

PILLAR DESIGN
PILLAR LOAD/UCS PILLAR WIDTH/HEIGHT

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

PILLAR STABILITY GRAPH

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

PILLAR STABILITY GRAPH

Wp/Hp < 1 SEISMICITY

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

GOLDCORP RED LAKE MINE

1700m below surface 47g/tonne GOLD

600 TPD
GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

BURST PRONE CRITERIA

STABLE
LOW BURST POTENTIAL

UNSTABLE
MEDIUM BURST POTENTIAL 1.0 < FS < 1.4 0.5 < s 1/UCS < 0.6 s 2 < Wp/Hp < 3 Ground working, pillar spalling

FAILED
HIGH BURST POTENTIAL FS<1.0 1/UCS > 0.6 Wp/Hp < 2 Substantial bursting *

Pillar Stability Graph Induced Stress Criteria Pillar Geometry Observations

FS> 1.4 on Pillar Stability Graph s 1/UCS < 0.5 Wp/Hp > 3 Minor ground working, minor spalling

* in process of being evaluated - microseismic

GEOMECHANICS DESIGN GROUP

STUDY AT QUINSAM MINE BRITISH COLUMBIA CANADA

UBC MINING & MINERAL PROCESS ENGINEERING

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

SURFACE SUBSIDENCE OVER SHALLOW EXCAVATIONS

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

ANGLE OF CRITICAL DEFORMATION IS <10o FROM VERTICAL


STRUCTURAL CONTROL DEPTH OF CAVE AS MUCH AS 14X EXCAVATION HEIGHT

GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

CONCLUSIONS
CALIBRATION TO ANALYTICAL AND INTERPOLATE, NOT EXTRAPOLATE EMPIRICAL APPROACHES

KNOW THY DATABASE TOOL MODIFIED ACCORDING TO MINE BEHAVIOUR SAFETY & WORKABLE

GEOMECHANICS DESIGN GROUP GEOMECHANICS DESIGN GROUP

UBC MINING & MINERAL PROCESS ENGINEERING

ACKNOWLEDGEMENT

NIOSH

CERM3
GEOMECHANICS DESIGN GROUP