Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Coronado Toll Booth Plaza Improvements

Public Workshop September 12, 2013

Goal / Purpose
RBF Consulting hired to help develop design alternatives to:
Calm Traffic Design to currently allocated budget ($840k) Beautify the Entrance to Coronado Include the Community in the process

Traffic Calming
Toolbox
Roundabouts Controls
Metering Signals Stop Sign

Speed Bumps Traffic Friction


Channelization Narrow Lanes Paving Patterns

Constraints / Operations
CHP and Caltrans Operations (See Exhibit next slide)
Use
Satellite Office for CHP Removable Barrier Machine (Zipper) Caltrans Storage/Maintenance Yard

No raised medians between lanes (to cut across road) Maintain access and parking for existing building and storage area Maintain parking and maintenance access for Zipper

Public turn-arounds (both directions)

Concept Plan
Initial Alternatives were not in budget Maintain/Improve CHP and Caltrans Operation Calm Traffic with increased Traffic Friction
Perceived narrow lanes w/ paving pattern Less overall road width

You might also like