Note: The scheduled receipt for part B in week 1 is 65

B (2 Req.)

Period Part A LT =1 Q = 20 SS=0


Gross requirements Scheduled receipts Projected Available Balance 21 Planned order releases

1 5 16 20 1 40 65 45 40 1 60 10 50

2 25 11 20 2 40 5 40 2 60 0 40

3 18 13 3

4 8 5 20 4 40 45 40 5 0 4 60 40 20 40 20

5 12 13 20 5 40 5 0 5 60 0 0

6 22 11 6

Period Part B LT =2 Q = 40 SS=0


Gross requirements Scheduled receipts Projected Available Balance 20 Planned order releases

0 6

Period Part C Gross requirements LT =1 Scheduled receipts Q = LFL Projected Available Balance 70 SS=10
Planned order releases

Green hi-lite designates two quantities that are DIFFERENT than the book. Use the values on THIS spread sheet. Note: Q=20 implies a FIXED lot size of 20; LFL designates lot-for-lot

A few notes / hints about this problem: 1) Note that G goes into BOTH A and F (Gross requirements will be driven from a combination of A and F); 2) Part G has a "quantity-per" of 2; 3) Part G has and order mutliple of 20 (This means that order quantities must be multiples of 20... ie 20,40,60, etc.)

G (2 required)

Period Part A Gross requirements LT =1 Scheduled receipts Q = LFL Projected Available Balance 10
Planned order releases

1 5 4 9 0 1 10 5 22 1 22 20 28 20

2 3 6 4 2 20 18 3 15 2 23 25 20

3 10 0 15 3 25 0 5 3 35 10 40

4 15 0 15 4 15 0 0 4 30 20 0

5 15 0 5 5 0 5

Period Part F Gross requirements LT =2 Scheduled receipts Q = LFL Projected Available Balance 15
Planned order releases

Period Part G LT =1 Q = mult of 20 SS=10


Gross requirements Scheduled receipts Projected Available Balance 30 Planned order releases

20

Green hi-lite designates two quantities that are DIFFERENT than the book. Use the values on THIS spread sheet.

Note: The minimum order quantity for part Y = 40


A B

Y (2 Req.)

8A
Period Part G Gross requirements LT =1 Scheduled receipts Q = LFL -1

20 As

1 8 9 1 8 1 36 10 24 40

2 8 0 8 2 36 28 40

3 8 0 8 3 36 30 40

4 8 0 8 4 36 34 0

5 8 0 8 5 36 38 40

Projected Available Balance Planned order releases

Period Part Y Gross requirements LT =2 Scheduled receipts Q = LFL Projected Available Balance Min=40
Planned order releases

48

48 40

Green hi-lite designates two quantities that are DIFFERENT than the book.

What exception message will MRP generate?

8 Bs

6 8 0 8 6 36 2

7 8 0 7 36 6