Chap 6 HWanswer SHEETfall
Chap 6 HWanswer SHEETfall
B (2 Req.)
1 5 16 20 1 40 65 45 40 1 60 10 50
2 25 11 20 2 40 5 40 2 60 0 40
3 18 13 3
4 8 5 20 4 40 45 40 5 0 4 60 40 20 40 20
5 12 13 20 5 40 5 0 5 60 0 0
6 22 11 6
0 6
Period Part C Gross requirements LT =1 Scheduled receipts Q = LFL Projected Available Balance 70 SS=10
Planned order releases
Green hi-lite designates two quantities that are DIFFERENT than the book. Use the values on THIS spread sheet. Note: Q=20 implies a FIXED lot size of 20; LFL designates lot-for-lot
A few notes / hints about this problem: 1) Note that G goes into BOTH A and F (Gross requirements will be driven from a combination of A and F); 2) Part G has a "quantity-per" of 2; 3) Part G has and order mutliple of 20 (This means that order quantities must be multiples of 20... ie 20,40,60, etc.)
G (2 required)
Period Part A Gross requirements LT =1 Scheduled receipts Q = LFL Projected Available Balance 10
Planned order releases
1 5 4 9 0 1 10 5 22 1 22 20 28 20
2 3 6 4 2 20 18 3 15 2 23 25 20
3 10 0 15 3 25 0 5 3 35 10 40
4 15 0 15 4 15 0 0 4 30 20 0
5 15 0 5 5 0 5
Period Part F Gross requirements LT =2 Scheduled receipts Q = LFL Projected Available Balance 15
Planned order releases
20
Green hi-lite designates two quantities that are DIFFERENT than the book. Use the values on THIS spread sheet.
Y (2 Req.)
8A
Period Part G Gross requirements LT =1 Scheduled receipts Q = LFL -1
20 As
1 8 9 1 8 1 36 10 24 40
2 8 0 8 2 36 28 40
3 8 0 8 3 36 30 40
4 8 0 8 4 36 34 0
5 8 0 8 5 36 38 40
Period Part Y Gross requirements LT =2 Scheduled receipts Q = LFL Projected Available Balance Min=40
Planned order releases
48
48 40
Green hi-lite designates two quantities that are DIFFERENT than the book.
8 Bs
6 8 0 8 6 36 2
7 8 0 7 36 6