Professional Documents
Culture Documents
Setelah Penambahan PLTU - LFR
Setelah Penambahan PLTU - LFR
====================
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
Number of Buses:
FRM3
---0
Swing
----1
Gen.
----1
Load
----4
XFRM2
React. Line/Cable
-----
-----
Total
----6
Imp.
Tie PD
-------
Total
----Number of Branches:
6
99
---------- ----4
Method of Solution:
Newton-Raphson
System Frequency:
60.0
Hz
Unit System:
English
Data Filename:
cubo
Output Filename:
D:\etap\cubo\Untitled.lfr
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
on
====
var
----
.000
Init. Voltage
Generati
============= ==========
% Mag.
Ang.
MW
0.0
100.0
0.0
100.0
0.0
100.0
0.0
101.9
0.0
110.6
0.0
0.000
-----0.000
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
Engineer:
KLGCONSULT
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
CKT / Branch
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
CKT / Branch
Transformer
%Tap Setting
Reactor
Impedance (100 MVA Base)
============ ======================================= ============= ====
============= ========================
ID
MVA
kV
kV
% Z
X/R
From
To
X (
ohm)
X/R
% Tol.
% R
% X
------------ ------- ------ ------ ------- ----- ------ ------ ------- ------- ------ ------- ------T1
100.000 10.800 138.000
9.000 34.1 0.000 0.100
0.00
0.3
8.7
T2
100.000 20.800 138.000
9.000 34.1 0.000 0.100
0.00
0.3
8.7
BRANCH CONNECTIONS
====================
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
CKT / Branch
VA Base)
========================
========
ID
Type
Z
------------ ----------------Line1
XmitLine
16.8
Line2
XmitLine
12.6
Line3
XmitLine
Connected Bus ID
%Impedance (100 M
==========================
==================
From
To
------------ ------------
------- -------
Bus1
Bus2
3.9
16.3
Bus1
Bus3
2.9
12.2
Bus2
Bus4
2.9
12.2
12.6
Line4
33.5
T1
8.7
T2
8.7
XmitLine
Bus3
Bus4
7.8
32.6
2W XFMR
Bus5
Bus1
0.3
8.7
2W XFMR
Bus6
Bus2
0.3
8.7
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
Bus Information & Nom kV
Voltage
Generation
Motor Load Static
Load Flow
XFRM
======================== =========== ============ ============ =======
===== ====================================== =====
ID
Type kV
% Mag. Ang. MW
Mvar
MW
Mvar
MW
Mvar
To Bus ID
MW
Mvar Amp %PF % Tap
------------ ---- ----- ------ ---- ----- ----- ----- ----- --------- ------------ ----- ----- ---- ----- ----Load
Bus1
26.18 Bus2
0.00
0.00
0.00 56.74
0.00
0.00
0.00 98.88
0.00
0.00
0.00 53.25
0.00
0.00
0.00 52.53
*Bus5
0.00 Bus1
0.00
0.00
0.00
Bus6
0.00 Bus2
0.00
0.00
0.00
Bus3
Bus5
Bus2
51.59 Bus1
Bus4
21.73 38.79
Bus6
0.53-131.79
Bus3
22.83 Bus1
Bus4
Bus4
30.03 Bus2
Bus3
419 95.1
200 48.9
594 -0.4 0.100
158 -98.7
7.03
155 -97.6
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
Undervoltage Buses
Critical Limit =
98
.00 %
-----------------Bus
Oper. Voltage
Bus
Bus
Oper. Voltage
===================== =============== =====================
======= ===================== ===============
ID
kV
% Mag.
kV
ID
kV
kV
ID
kV
% Mag.
kV
------------ ------- ------ ------- ------------ ------------- ------------ ------- ------ ------Bus1
138.000
93.43 128.937* Bus2
138.000
127.962* Bus3
138.000
87.22 120.365*
Bus4
138.000
86.63 119.553*
Oper. V
oltage
Overvoltage Buses
========
% Mag.
-----92.73
00 %
----------------Bus
Oper. Voltage
Bus
Bus
Oper. Voltage
===================== =============== =====================
======= ===================== ===============
ID
kV
% Mag.
kV
ID
kV
kV
ID
kV
% Mag.
kV
------------ ------- ------ ------- ------------ ------------- ------------ ------- ------ ------Bus6
20.800 105.43 21.930*
Oper. V
oltage
========
% Mag.
------
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
Engineer:
KLGCONSULT
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
Branch Loading Summary Report
----------------------------CKT / Branch
Cable & Reactor
inding Transformer / UPS
========================= ===========================
=====================================
Loading
oading (input) ANSI Loading(output)
ID
Type
Ampacity
Amp
%
MVA
%
MVA
%
------------ ----------- -------- ------- ------------ -------- --------- --------T1
Transformer
.578
303.6 278.205
278.2 *
T2
Transformer
.000
150.0 131.792
131.8 *
Two-W
===============
Capability
MVA
---------- --100.000
303
100.000
150
Project:
Page:
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
Branch Losses Summary Report
---------------------------Flow
=====
var
----.416
.457
.224
.054
.000
.029
CKT / Branch
Connected Bus Info.
From-To Bus Flow
Losses
% Bus Voltage
Vd
============ ========================= ==================
================= ============= % drop
ID
From Bus ID To Bus ID
MW
Mvar
kW
kvar
From
To
in Vmag
------------ ------------ ------------ -------- --------------- -------- ------ ------ ------Line1
Bus1
Bus2
128.919 -10.841
7771.7 30575.8
93.43 92.73
0.71
Line2
Bus1
Bus3
88.991
28.960
3067.4 11503.3
93.43 87.22
6.21
T1
Bus1
Bus5
-274.655 -44.303
2343.7 79920.7
93.43 101.85
8.42
Line3
Bus2
Bus4
21.732
38.789
718.4 1734.1
92.73 86.63
6.09
T2
Bus2
Bus6
0.534 -131.791
534.0 18209.3
92.73 105.43
12.71
Line4
Bus3
Bus4
32.673
-5.372
1153.3 1657.0
87.22 86.63
0.59
-------- -------15588.4 143600.2
To-From Bus
=============
MW
-------- ---121.147
41
-85.924
-17
276.999
124
-21.014
-37
0.000
150
-31.520
Project:
Page:
10
Location:
PowerStation 4.0.0C
Date: 05-21-2012
Contract:
SN:
KLGCONSULT
Engineer:
Study Case: LF
File: cubo
----------------------------------------------------------------------------------------------------------------------------------
===============================================================================
====================================================
--------
MW
Mvar
MVA
=========
=========
=========
276.999
124.224
303.578
0.000
150.000
150.000
276.999
274.224
389.778
---------
---------
---------
% PF
=
=============
Swing Bus(es):
91.2 Lagging
Generators:
0.0 Lagging
Total Demand:
71.1 Lagging
------------Total Motor Load:
00.0 Lagging
0.000
0.000
261.410
130.623
Apparent Losses:
15.588
143.600
System Mismatch:
0.000
0.000
Number of Iterations =
0.000