Professional Documents
Culture Documents
Tasks 4-Feb ##### ##### ##### 4-Mar ##### #####
Tasks 4-Feb ##### ##### ##### 4-Mar ##### #####
design (hardware design) Construction of the base Construction of the arm Construction of the gripper Construction of the cutter Implementing base motion Implementing arm motion Implementing gripper movement Implementing cutter movement Implementing serial communication Implementing wireless module Testing of the individual components of the entire system MILESTONES
M1 M2 M3 M4 D1 D2 D3 D4 D5
Validation of the design Mechanical construction of the robot Implementation of the entire robot Robot tested
Project Outline Interim Report Presentation Demonstration Final Report
##### 1-Apr 8-Apr ##### ##### ##### 6-May ###### ###### ###### 3-Jun ##### ##### #####
1-Jul
MILESTONES M1 M2 M3 M4 M5
Assembly working PLL controller working LED controller working Photodiode controller working Demostration of the televisor