Department : Civil Engineering Course : Construction Cost Estimating Course Code : CPM 315E Exercise 2 1. Consider the following figure, it is required to prepare a quantity take-off for the following types of work to be included on the bill of quantities:

a. Excavation. b.. Backfilling


Cost Estimating Dr. Emad Elbeltagi

c. Plain concrete footing d.Reinforced concrete footings and smells and column necks till the ground level.. e. Insulation.

2. Consider the following figure, find the same requirements as above.

Cost Estimating

Dr. Emad Elbeltagi