BM Heighting Bm01 - Bm08
BM Heighting Bm01 - Bm08
CLIENT:
CONTRACTOR:
TRONDER POWER
LTD.
NOREMCO
LEVELLING SHEET
INTERMEDIATE
FORE
SIGHT
COLLIMATION
OR H. P.C
0.303
REDUCED LEVEL
1416.279
1415.976
TOBM08. PATTERN B
ADJUSTMENT
DESIGN LEVEL
REMARKS
BM01(1415.976)
0.387
4.425
1412.241
1411.854
-0.002
1411.852
CP
0.891
3.499
1409.633
1408.742
-0.003
1408.739
CP
0.703
0.711
1409.625
1408.922
-0.005
1408.917
BM02(New)
2.120
1.127
1410.618
1408.498
-0.007
1408.492
BM03(New)
0.460
1.933
1409.145
1408.685
-0.008
1408.677
BM04(New)
1.702
0.959
1409.888
1408.186
-0.010
1408.176
CP
0.934
1.528
1409.294
1408.360
-0.011
1408.349
CP
2.694
1406.600
1406.600
-0.013
1406.587
BM08(1406.587)
=
n=
-0.013
8.000
-0.002 m Per Set Up
LEVELLING SHEET
Date.Levels taken for ..
FROM
BACK
SIGHT
INTERMEDIATE
FORE
SIGHT
COLLIMATION
OR H. P.C
TOBM
REDUCED LEVEL
.. PATTERN B
DESIGN LEVEL
DISTANCE
REMARKS
76+580
76+600
76+620
76+640
76+660
76+680
76+700
76+720
76+740
76+760
76+780
76+800
76+820
76+840
968.377
968.302
968.113
967.891
967.618
967.367
967.088
966.791
966.514
966.214
965.946
965.697
965.424
965.129
968.430
968.354
968.182
967.951
967.702
967.431
967.164
966.871
966.578
966.292
966.013
965.759
965.496
965.207
968.499
968.422
968.281
968.027
967.788
967.510
967.238
966.939
966.653
966.379
966.081
965.822
965.548
965.297
968.435
968.361
968.215
967.964
967.701
967.442
967.163
966.878
966.591
966.306
966.018
965.768
965.488
965.222
968.376
968.302
968.137
967.898
967.638
967.359
967.079
966.801
966.526
966.243
965.959
965.702
965.427
965.150