CONSULTANT:

CLIENT:

CONTRACTOR:

TRONDER POWER
LTD.

NOREMCO

BUGOYE HYDROPOWER PROJECT

LEVELLING SHEET

Date24/03/2009.Levels taken for BM HEIGHTING .


FROMBM01
BACK
SIGHT

INTERMEDIATE

FORE
SIGHT

COLLIMATION
OR H. P.C

0.303

REDUCED LEVEL

1416.279

1415.976

TOBM08. PATTERN B
ADJUSTMENT

DESIGN LEVEL

REMARKS

BM01(1415.976)

0.387

4.425

1412.241

1411.854

-0.002

1411.852

CP

0.891

3.499

1409.633

1408.742

-0.003

1408.739

CP

0.703

0.711

1409.625

1408.922

-0.005

1408.917

BM02(New)

2.120

1.127

1410.618

1408.498

-0.007

1408.492

BM03(New)

0.460

1.933

1409.145

1408.685

-0.008

1408.677

BM04(New)

1.702

0.959

1409.888

1408.186

-0.010

1408.176

CP

0.934

1.528

1409.294

1408.360

-0.011

1408.349

CP

2.694

1406.600

1406.600

-0.013

1406.587

BM08(1406.587)

=
n=

-0.013
8.000
-0.002 m Per Set Up

LEVELLING SHEET
Date.Levels taken for ..
FROM

BACK
SIGHT

INTERMEDIATE

FORE
SIGHT

COLLIMATION
OR H. P.C

TOBM

REDUCED LEVEL

.. PATTERN B

DESIGN LEVEL

DISTANCE

REMARKS

76+580
76+600
76+620
76+640
76+660
76+680
76+700
76+720
76+740
76+760
76+780
76+800
76+820
76+840

968.377
968.302
968.113
967.891
967.618
967.367
967.088
966.791
966.514
966.214
965.946
965.697
965.424
965.129

968.430
968.354
968.182
967.951
967.702
967.431
967.164
966.871
966.578
966.292
966.013
965.759
965.496
965.207

968.499
968.422
968.281
968.027
967.788
967.510
967.238
966.939
966.653
966.379
966.081
965.822
965.548
965.297

968.435
968.361
968.215
967.964
967.701
967.442
967.163
966.878
966.591
966.306
966.018
965.768
965.488
965.222

968.376
968.302
968.137
967.898
967.638
967.359
967.079
966.801
966.526
966.243
965.959
965.702
965.427
965.150