Sheet1 Bar Bending schedule

Site ID : PUNE-RIL-0067 Site Address: MR.LODHA\r\nSRI GANESH NIWAS, LANE NO 3, LAXMINAGAR, KONDHWA,BUDRUK, BEHIND VIIT/VCIC COLLEGE, PUNE48,MAHARASHTRA For:RELIANCE JIO INFOCOMM LTD Details Bar Spec. Beam B1 0.4 A 0.4 Total Length No of Bars in Meter 3.72 10 Bar Dia in mm 16 Weight in kgs 58.79 Remark

B1 reinforcement

2.92 Beam B2 0.4 B 0.4 3.63 4 16 22.95 B1 reinforcement

2.83 0.4 0.4 C 3.37 2 16 10.65 B1 reinforcement

2.57 0.4 D Beam B3 0.4 E 0.4 2.98 8 16 37.67 B1 reinforcement 0.4 3.7 2 16 11.69 B1 reinforcement

2.9

2.18 0.32 Rings 0.42 Columns 0.35 F 1.25 0.9 0.32 Links 0.32 1.28 16 8 8.09 Links 32 12 35.56 Main steel in column 1.48 37 8 21.67 Ring

Total Steel in Kgs

207.07

Concrete Quantity
Beam B1 Beam B2 Beam B3 Column/pedastal 1 1 1 4 Length 3 1.86 1.7 0.4 Width 0.4 0.4 0.4 0.4 Depth 0.5 0.5 0.5 0.45 Total 0.60 0.37 0.34 0.07 1.38 Cum Cum Cum Cum Cum