Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

COMPRESSION SYSTEMS

operating and maintenance costs


of

AJAX slow speed Integrals


vs.

High Speed Separable Packages

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Lube oil consumption

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

OIL CONSUMPTION COMPARISON


HSSC
ENGINE COMPRESSOR ENGINE SUMP LUBE OIL REPLACEMENT CRANKCASE CAPACITY US gals (litres) AVG LUBE OIL COST (A$/litre) SUB-TOTAL COST (A$ per change) CHANGES PER YEAR SUB-TOTAL (A$ per year) POWER PISTON LUBRICATION (VAPORS AND COMBUSTION PRODUCTS) ******* DAILY MAKE-UP CONSUMPTION US gal (litres) (VAPORS AND PRODUCTS OF COMBUSTION) SUB-TOTAL (A$/DAY) SUB-TOTAL (A$/YEAR) COMPRESSOR FRAME LUBE OIL REPLACEMENT COMPRESSOR FRAME (OIL SUMP CAPACITY) US gal. (litres) CHANGES PER YEAR AVG LUBE OIL COST (A$/litre) SUB-TOTAL COST (A$ per change) SUB-TOTAL (A$ per year) YEARLY COST FIVE YEAR COST 47 (178) 2 4.00 712 1424 A$ 56,290 A$ 281,450 0 0 A$ 23,632 A$ 118,160 0 0 7 (26.5) 106 38,690 4 (15.2) 60.8 22,192 3512LE JGE4

AJAX
DPC-2804

89 (337) 4.00 1348 12 16,176

95 (360) 4.00 1440 1 1440

AJAX SAVES A$ 32,658 EACH YEAR A$ 163,290 IN FIVE YEARS

**** Data Provided by End User

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Downtime
and

Availability

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Duke Conoco Phillips

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Duke Conoco Phillips

Ajax Downtime Costs Per Year = 3.5 Days x $16,000.00 = $56,000.00 Downtime Dollars

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Berry Petroleum

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Berry Petroleum

Ajax Downtime Costs Per Year = 1.8 Days x $40,000.00 = $72,000.00 Downtime Dollars

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Conoco-Phillips AJAX Reliability


January 2007 40 AJAX Units 99.88% Reliability 39 AJAX Units 99.91% Reliability

April 2007

Burlington AJAX Reliability


January 2007 45 AJAX Units 99.82% Reliability 45 Ajax Units 99.88% Reliability

April 2007

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Fuel Efficiency

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Ajax vs High Speed - Fuel Efficiency


Actual project conditions 10.0 MMscfd @ Ps-25 Pd-850 psig

High Speed Brake HP per MMscfd = 221hp/ MMcfd At 10.0 MMcfd HP = 2210

Ajax slow speed brake HP per MMcfd = 200 hp/MMcfd At 10.0 MMcfd, HP =2000

Ajax is 9.6% More Efficient


RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Ajax vs High Speed - Fuel Efficiency

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Fuel Consumption Comparison scfd per mmscfd AJAX DPC2802 v Engine Driven Screw Compressors at various suction pressures
50.0

45.0

fuel gas flow - scfd (x 1000) per mmscfd

Discharge Pressure 150 psig


40.0

LCV

1000 btu/scf

35.0

30.0

25.0

20.0

15.0

10.0 0 2 5 10 15 20 30

suction pressure - psig

Ajax DPC 2802


RAISING PERFORMANCE. TOGETHERTM

F18/RG282

F18/TDSH 355L

COMPRESSION SYSTEMS

Cost of Operations and Maintenance

RAISING PERFORMANCE. TOGETHERTM

COMPRESSION SYSTEMS

Actual Operations and Maintenance Costs


Customer: British Petroleum Total Installed Ajax power Total No. Units Operating & maintenance cost 31,580 bhp 70 US$ 24 per bhp per year**

** Number provided by BP is current and includes all major repairs and pms except labour costs

These 70 units are operated and maintained by FOUR mechanics

RAISING PERFORMANCE. TOGETHERTM

15

You might also like