DESIGN OF FOUNDATION

Fcu = Fc = 250 70 kg/cm 2 kg/cm 2 Fy = B.C = 3600 12.5 kg/cm 2 t/m 2

Design of F1
Col load Pw = 104 9.152 m ton m2 take Col Dim take tp.c = Lp.c = Bp.c = a= 0.3 0.4 3.20 3.00 m m m b= x
0.5

Ap.c = P / B.C = Lp.c = 3.13

dim of R.C
L R .c =

plane

footing

3.20

3.00

footing dim
2.5 m B R .c = 2.3 m

dim of
A R .c = L1 = B1 =

R.C
5.75 m m

footing
m2

2.5

2.3

1 1

B1

L1

( stress under R.C )

F= L1 2 / 2 =
0.5

P w / A R .c =

18.09

t/m 2

MW =

fx

9.04 =

mt 40.5141 cm

Mu = take c =

13.57

mt

d = cx (Mu / fcu x b) take t =

5.5

d + 6 = 46.51409 cm t= 60 cm d= 54 cm

Check of Shear ( ult stress under R.C ) F u = ( Shear force ) Qu =


27.13

t/m 2 19.81 t kg/cm 2 kg/cm 2

Fu x ( L1 - d /2 ) =

( Shear Stress )

qu =

Qu

bxd=

3.67 6.33 SAFE

( all Shear Stress ) q all =

0.49x( Fcu / 1.5)^ 0.5 =

Shear Stress IS Check of Punching ( Punching Area ) ( Punching Force )

A risist = ( ( a + d ) + ( b + d ) ) x 2 x d = Qp = ( ( a + d ) x ( b + d ) ) x Fu = 132.30 t kg/cm 2

2.03

m2

( Punching Stress ) ( All Punching Stress )


( 0.5 + a/b ) =

qp =

Qp /

A risist =

6.52

1.1

take

( 0.5 + a/b ) =

( All Punching Stress ) =

0.5 (0.5+a/b ) x (Fcu / 1.5)^ =

12.91

kg/cm 2

Punching Stress is R.F.T Mu = AS =


13.57

SAFE

mt

C= J=

5.5 0.826

M u / J . d .fy = cm 2 / m
( 8.1 cm2/ m

AS =

8.45

AS = 4.48

9.00

16

ASmin = 0.15*d =

CONCLUSION P.C R.C Short Rft 3.20 2.5


11.196

X X

3.00 2.3 16

X X / m

0.4 0.6

Long Rft

10.301

16

/ m

mt

m2

SAFE 1

UNSAFE

7.961783

12

19.90446

12

18.3121

12