Professional Documents
Culture Documents
Motor Drain Pump Certification Requirements
Motor Drain Pump Certification Requirements
com] Sent: Friday, November 12, 2004 11:07 PM To: Loh Siak Chun (OYLR&D) Cc: Chun Siew Siew (OYLR&D) Subject: SV: Motor Drain Pump Dear All,
The drain pump used in your unit need not to be certified (for IEC) The drain pump is tested as a part of the appliance
You do heating test and measure the winding temperature during normal operation. This is usually continuously pumping of water. Then you do the locked rotor test and measure the winding temperature.
Best regards
Ulf Lindmark
-------------------------------------------------------------------------------Fr n: Loh Siak Chun (OYLR&D) [mailto:lohsc@oyl.com.my] Skickat: den 8 november 2004 02:27 Till: Ulf Lindmark ES-STO Kopia: Chun Siew Siew (OYLR&D) mne: Motor Drain Pump Prioritet: H g
Dear Ulf, Do we need to get our motor drain pump tested & certified? If yes, kindly porpsoe what kind of test to be conducted. Thank you For your information, the drain pump is used in our CK units
R&D Engineer OYL Research & Development Centre Tel: 603-61570846 / 61570920 Fax: 603-61570869