Professional Documents
Culture Documents
DL Upswitch UL Upswitch
DL Upswitch UL Upswitch
DL Upswitch UL Upswitch
Channel Switching Evaluation decision to switch can be due to: Throughput (upswitch)
Trigged by?
If (UL <= 64) pmUlUpswitchAttemptLow + If (64 < UL < 256) pmUlUpswitchAttemptMedium + If (256 <= UL < Eul) pmUlUpswitchAttemptHigh + If (UL = Eul) pmUlUpswitchAttemptEul +
If (DL <= 64) pmDlUpswitchAttemptLow + If (64 < DL < 256) pmDlUpswitchAttemptMedium + If (256 <= DL <HS) pmDlUpswitchAttemptHigh + If (DL = HS) pmDlUpswitchAttemptHs +
Check MP Load Control NO Load ok? YES Admission Control NBAP/RNSAP: Radio Link Reconfiguration Prepare NBAP/RNSAP: Radio Link Reconfiguration Ready NBAP/RNSAP: Radio Link Reconfiguration Commit RRC: Transport Channel Reconfiguration or Radio Bearer Reconfiguration NO End
NO
Possible to revert to old rate? YES Revert to old data rate End
Receive Message
NO
C 00 01318G