Intersections 2
Station No: Easting (m) Northing (m) Height (m) RO Stn No: Easting (m) Northing (m) Observations From Station: Horizontal Angle Vertical Angle Deg Min Sec Deg Min Sec Easting (m) Northing (m) Observations From Station: Horizontal Angle Vertical Angle Deg Min Sec Deg Min Sec Easting (m) Northing (m) Height (m) RO Stn No: Station No: Job Ref No: Job Title: File: Date: Observer: Assistant: Instrument: Intersected Co-ordinates Easting Northing Height (m) (m) (m) Skew Error (mm)
Point No.
Point No. 1 2 3
Observations From Station: A Horizontal Angle Vertical Angle Deg Min Sec Deg Min Sec 63 11 49.0 85 34 43.0 71 34 12.0 83 17 12.0 80 23 19.0 92 56 23.0
Observations From Station: B Horizontal Angle Vertical Angle Deg Min Sec Deg Min Sec 230 45 15.0 89 23 35.0 241 35 10.0 87 16 14.0 268 23 19.0 93 45 55.0
Intersected Co-ordinates Easting Northing Height (m) (m) (m) 261.6469 187.3197 22.4835 289.9828 209.4467 28.6609 355.7367 249.6106 10.1621
Example Layout
Measured Vertical Angles (VAa & VAb) 0 = Zenith (UP) 90 = Horizontal 180 = Nadir (DOWN)
Notes: Station B (Eb,Nb, Ha) ROa & ROb may be the same point Station Height (H) is trunnion height & is sum of station Reduced Level & Instrument Height
80 = Nadir (DOWN)
eight (H) is trunnion height & is sum n Reduced Level & Instrument Height