Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Dhofar Power Company SAOG

Appendix 7Bl
1111
Engineering Documents to be submitted by Contractor
Clause Reference Document Description Comment
7.2.24 Design Calculations
7.2.25 Fabrication Drawings
7.5.2 Method Statement, DFT records
7.6.1 Method Statement
7.7.1 Material Test Certificates
7.7.1 Bolt & Nut Test Certificates
7.7.2 Welding Procedures If requested
7.7.2 Welders test certificates If requested
7.7.2 NDT Procedures
7.7.2 NDT Inspection Reports If requested
7.7.4 Galvanising test records If requested
7.7.4 Ingot Zinc certificates If requested
7.7.4 Pot melt analysis If requested
7.7.6 Prototype support test programme
7.7.6 Prototype test reports
7.7.7 Certificate of conformity
7.7.8 Support Erection records If requested
Construction of 132kV Overhead line between Awqad GSS &SFZ GSS
Rev. No. :A
and Associated Works (Package-1)
Volume 2 Overhead Line Specification Date : December 2010
Section 7 Supports Page :Page 35 of 38
.. . ...-..-. - - _...... _.._.. .._.- .

You might also like