Construction of Back-up Facilities Behind Berths No.

4 & 5 of New Mooring


Container Terminal, Chittagong.
Client : Chittagong Port Authority

Consultant : BRTC,BUET
Contractor : Project Builders Limited

SIEVE ANALYSIS OF AGGREGATE


Sample No:
Location:
Description:
ASTM

Sampling Date:
Testing Date:
Proposed Use:

Size (mm)

Sieve No

Weight

Cumulative Wt.

Retained(g) Retained (g)

2''

50

1.1/2''

38

1''
3/4''
1/2''

25
20/19.0
12.5

3/8''
2

9.5
6.3

4.75

2.36

12

1.7

16

1.18

30

0.6

40

0.425

50

0.3

80

0.18

Percent

Percent

Retained (%) Passing(%)

Spec.Requirement
ASTM C-33

100

0.15

200

0.075

Pan
Total
Fineness Modulus = ( 38+19+9.5+4.75+2.36+1.18+0.6+0.3+0.15) /100 =
Maximum Size

( mm)

(1) Original Dry Constant of Sample

MinimumSize

%
( mm)

gm

(2) Dry Constant Wt. of Sample after Washing :


gm
Percentage of Material Finer than no.200 Sieve by Washing (1)-(2) /1x100=

.........................
Lab. Technician

.........................................
Contractor's Representative

..........................
(AEN,/ NCT)

.............................
RE / BRTC, BUET.

.............................
RE / BRTC, BUET.