Professional Documents
Culture Documents
Guling Pondasi
Guling Pondasi
= 1 x 1m tinggi flood light total = 15 m luasan tangkapan angin pada tiang (A2) = 2 x 0,18 x 14 luasan tangkapan angin pada lampu (A2) =1mx1m gaya angin frame lampu (W1) = 70 x 5,04 x Cd gaya angin pada tiang (W2) = 70 x 1 = 70 kg lengan gaya W2 lengan gaya W1
= = = = = = = = = = =
2 0.18 14 1 15 5.04 1
unit m m m2 m m2 m2
c = G1
2,4 T/m3 = = = = = = = = = = = (1,7 x 1,7 x 0,35) x 2,4 2.428 T (1,0 x 0,5 x 0,85) x 2,4 1.02 T 1T G1 x 0,85 2.063 Tm G2 x 0,85 0.867 Tm G3 x 0,85 0.85 Tm kontrol guling , SF = 1,5 Momen Penahan Momen Guling MP1 + MP2 + MP3 MG1 + MG2 3.78046 2.5074 1.508 1,5 SF W1 W2 MG1 = = = = = = 0.166 0.07 W1 x 8,4 m 1.3944 Tm W2 x 15,9 m 1.113 Tm
G2
G3 MP1
MG2
MP2
MP3
SF
1,5 aman!!
beban yang diterima oleh pondasi beban angin W1 beban angin W2 beban lampu pu Mu = = = = = = = = 1000kg (W1 x 7 m) + (W2 x 14,5 m) (165,8 x 7) + (70 x 14,5) 2175.6 kgm 22 KNm 165.8 kg 70 kg 1000 kg
7,5 m
7m
perhitungan tulangan kolom dimensi kolom b h selimut d Mu Mu A' fy f'c = = = = = = = = = = = 500 850 50 800 22 22000000 17600000 25 mm mm mm mm KNm Nmm Nmm mm
Momen luar
Mu
= = = = Mn = =
4 bh
2 1962.5 mm
>
Mu
aman
perhitungan tulangan kolom Arah X dimensi kolom b h selimut d Mu Mu A' fy f'c = = = = = = = = = = = 500 850 50 800 22 22,000,000 17,600,000 12 mm mm mm mm KNm Nmm Nmm mm
2
Momen luar
Mu
= = = = Mn = =
>
Mu
aman
jumlah tulangan digunakan di keempat sisi karena asumsi momen yang bekerja masing2 sama perhitungan tulangan kolom Arah y dimensi kolom b h selimut d Mu Mu A' fy f'c = = = = = = = = = = = 850 500 50 450 22 22,000,000 17,600,000 12 mm mm mm mm KNm Nmm Nmm mm 2 113.04 mm 240 Mpa 20 Mpa
Mu
Momen luar
= = = = Mn = =
>
Mu
aman
16 12
perhitungan tulangan kolom dimensi kolom b h selimut d Mu Mu A' fy f'c = = = = = = = = = = = 850 500 50 450 22 22,000,000 17,600,000 12 mm mm mm mm KNm Nmm Nmm mm 2 113.04 mm 240 Mpa 20 Mpa
Momen luar
= = = = Mn = =
5 bh
2 565.2 mm
>
Mu
aman
16 12 jumlah tulangan digunakan di keempat sisi karena asumsi momen yang bekerja masing2 sama
perhitungan volume
material beton baja D25 baja 12 kayu bekisting multiplex 10 mm perhitungan volume volume pemesanan 2.873 m3 3 m3 37.4 m 4 batang 110.48 m 10 batang 59.6 m 60 m 10.36 m2 5 lembar total berat besi 12 = 110,48 x 0,89 D25 = 37,4 x 3,853 total
= = =
BAR SCHEDULE
1
6 cm
20 cm 20 cm
155 cm
2
= = = =
6 cm
155 cm 3 6 cm
= = = = = = = =
12 118 cm
42 cm