Laporan Kemajuan Fisik Pembesian: Pekerjaan Lokasi
Laporan Kemajuan Fisik Pembesian: Pekerjaan Lokasi
PEKERJAAN
LOKASI
No
Jenis Pekerjaan
(2).
(1).
Satuan
(3).
Volume (kg)
(4).
Progress
(%)
(5).
Sisa
Volume (kg)
Progress
(%)
Volume (kg)
(7).
(8).
(9).
(10).
PEKERJAAN PEMBESIAN
Ulir D-8 x 12 m
kg
210,279.54
26.68
8.37
66,004.50
18.30
144,275.04
Ulir D-10 x 12 m
kg
154,712.60
19.63
12.02
94,712.60
7.61
60,000.00
Ulir D-13 x 12 m
kg
33,047.04
4.19
3.13
24,648.00
1.07
8,399.04
Ulir D-16 x 12 m
kg
101,037.84
12.82
3.01
23,700.00
9.81
77,337.84
Ulir D-19 x 12 m
kg
157,295.28
19.95
8.20
64,625.40
11.76
92,669.88
6
7
Ulir D-22 x 12 m
Ulir D-25 x 12 m
kg
25,032.00
3.18
13.56
100.00
2.27
11.72
48.71
17,880.00
92,400.00
383,970.50
0.91
1.83
51.29
7,152.00
14,460.60
404,294.40
kg
Total
106,860.60
788,264.90
Realisasi
No
(1).
Jenis Pekerjaan
(2).
Satuan
(3).
Volume (kg)
(4).
Progress
(%)
(5).
Sisa
Volume (kg)
Progress
(%)
Volume (kg)
(7).
(8).
(9).
(10).
2300
4.74
450
150
7.4
12.48
360
18.96
270
26.76
150
35.76
46.2