Professional Documents
Culture Documents
Liner Surveyng
Liner Surveyng
Liner Surveyng
COLLEGE OF ENGINEERING
DERPARTMENT OF IRRIGATION
2ND YEAR
FALL SEMESTER
SURVEING PRACTICAL
NAME AHMED ABDULAMIR ABDULRAZAQ SEC B
2007-08
Surveying
Linear surveying
SUREVYING PRACTICAL
WEEKLY REPORTS
REP. No.
NAME
Remarks:
Linear surveying
DATE
30-10-2007
GRUOP
Checked by
Surveying
Linear surveying
Aim of test:
Prepare a plan for an open area.
cos ? = ?52+ ?12- ? 52
2*34.2*35.8
2 ?5 ?1 = 34.22+35.82-33.52
= 0.542744781
20
measuring
tape.
? =mcos-1
0.542744781
= 57.129316 ? ? ? ? ? ? ?
Procedure:
? = 75.9302002 + 76.022826 + 95.809115 + 63.178640 + 57.129316
Divide area of surv eying into numbers of triangles by taking a center point for the area and measuring
the radial distance between the center
and each point
by the 20 m tape
= point
368.070097
? ?in?the
? ?circumference
??
Results Table:
Calculations:
1 2 3 4 5
? ( (1)
?) 3.35 3.05 3.12 2.66 3.42
Triangle
?( ?) 4.1 3.8 4.3 3.25 3.35
From the sketch we get:
Triangle (2) ? ? ? ? ? ?
Discussion:
31.2 = 0.241535309
From the calculation we can conclude that the sum of the center angels () are approximately (368) due
? = cos-1 0.241535309 = 76.022826 ? ? ? ? ? ? ?
to the man-made errors in measurement and the low accuracy of the measuring tape. Drawing the map
was hard with these
errors.
Triangle
(3)
cos ? = ?32+ ?42- ? 32
2*26.6*
2 ?3 ?4 = 26.62+31.22-432
31.2 = -0.101214575
= 0.451210262