% of Subtotal
Process
Project management & Control
PM/PE
Est
Cost Control
Scheduling
0.45
0.15
0.25
0.15
Civil/Struc/Arc
Electrical
Instrumentation
Piping
0.15
0.13
0.13
0.35
Detailed engineering
PID
Layouts
Model
Orthographics
MTO
Stress analysis
ISO
Equip/HVAC/Mechnical
Clerical
0.1
0.14
Purchasing
Expediting
0.65
0.35
Procurement
360
3600
3960
6118.646154
266
30
4680
TIC
Engineering
Percent of Total
use
0.11
0.13
0.12
2,189
0.120
0.15
0.18
0.16
2,918
1,313
438
730
438
0.072
0.024
0.040
0.024
11,309
1,696
1,470
1,470
3,958
0.093
0.081
0.081
0.217
0.58
0.64
0.62
0.07
0.05
0.1
0.33
0.1
0.05
0.3
277.07
197.90
395.81
######
395.81
197.90
######
0.08
0.11
0.1
1,131
1,583
0.062
0.087
1,824
1,186
638
0.065
0.035
14,250,000
2,280,000
18,240
5.01
2,188.80