Silt Content in Sand: Project Quality Assurance Manual

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

PROJECT CONSTRUCTION OF MAJOR BRIDGES IN CONNECTION WITH DOUBLING of RAILWAY LINE between BARANG-RAJATGARH(25 Kms),CUTTACK-BARANG(12 Kms) AND 3rd

LINE BETWEEN BARANG-KHURDA ROAD(35 Kms) IN RAIL VIKAS NIGAM LIMITED ( RVNL )

CLIENT

CONSULTANT WILBUR SMITH ASSOCIATES CONTRACTOR HCIL-ADHI KARYA-ARSS (JV)

PROJECT QUALITY ASSURANCE MANUAL Source Location Sampled by Sample No. : : : : : Date of Testing : Tested by :

SILT CONTENT IN SAND


Determination No. Volume of sand after submerging (V1) Volume of turbid layer after mixing sand and water and allowed for settlement (V2) Silt Content (%) = (V2/V1) X 100 Average Result : Silt content in sand (%) = Specified limit : Max 3%

Result Remarks

: Accepted / Not Accepted :

Representative (Contractor)

Q.C. Supervisor P.M.C