KUIZ

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

KUIZ

1. Calculate the cost of each product using a plant-wide overhead rate based on
machine hours.

Answer :

Alphas = 1000x63jbl
= 63,000

Betas = 3400x80jbl
= 272,000

Zebas = 600x105jbl
= 63,000

Overhead Rate= 960,000


398,000
=2.41

Item Alphas Betas Zebas


D.Material 680 300 730
D.Labor 900 560 850
MOH 151.83 192.8 253.05
Total 1731.83 1052.8 1833.05

2. Calculate the activity cost rates for (1) setups,(2) engineering changes and (3)
inspection and packing.

Answer:

Item O.head dollars Activity Levels Activity Cost


M.Setups $170,000 34 setups 5000
E.Changes $320,000 400 E.changes 800
I.&Packing $470,000 500 units 94
3. Cost out the three products using an activity-based costing system.

Answer :

Item Alphas (1,000) Betas(3,400) Zebas(600)


D.Materials 680,000 1,020,000 438,000
D.Labor 900,000 1,904,000 510,000
MOH
M.Setups 25,000 45,000 100,000
E.Changes 112,000 6,400 201,600
I. & Packing 94,000 319,600 56,400
Total 1,811,000 3,295,000 358,000

Kos Seunit : $ 1,811 $ 969.12 $ 596.67

Tradisional : $ 1731.83 $ 1052.8 $ 1833.05

You might also like