Professional Documents
Culture Documents
Daily Market Update: 02 November 2013, Saturday
Daily Market Update: 02 November 2013, Saturday
Disclaimer/Waiver: This publication aims to provide a timely overview of the actual market trading outcomes that transpired during the relevant trading day in the Wholesale Electricity Spot Market (WESM). As such, PEMC does not make any representation or warranties as to the completeness or accuracy of the information. PEMC, li kewise, accepts no responsibility or liability whatsoever, for any loss or costs incurred by the reader arising from, or in relation to, any conclusions or assumptions derived from the information found her ein.
Ref# DMU_20131102-306
200 9000
MEGAWATT MEGAWATT
150 100
50
6000
3000 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 -50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE ENERGY OFFERS, AVAILABLE SUPPLY, AND DEMAND AT EX-ANTE
SCHEDULED HVDC FLOW AT EX-ANTE, WHICH CAN EITHER BE FROM THE VISAYAS TO LUZON OR FROM LUZON TO THE VISAYAS. ZERO INDICATES NO POWER FLOW BETWEEN THE LUZON AND VISAYAS GRIDS.
HYDRO 5.9%
2800
NAT GAS 30.5%
GEO 16.9%
MEGAWATT
2100
1400
700
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
COAL 46.5%
CAPACITY ON OUTAGE (IN MW) BY RESOURCE TYPE DURING THE TRADING DAY
DAILY GENERATION MIX BY RESOURCE TYPE (IN %) BASED ON THE SCHEDULED GENERATION DURING THE TRADING DAY
WEATHER INFORMATION
REGION LUZON VISAYAS MIN TEMP, C 24 25 MAX. TEMP, C 32 31 RAINFALL, MM 0.00 0.00
Ref# DMU_20131102-306
PRICING CONDITIONS
PEN SUMMARY
EX-ANTE HOUR LUZON CONDITION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PRICES USED LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D LLWAP_D VISAYAS CONDITION PRICES USED VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D VLWAP_D PEN PEN LUZON CONDITION PRICES USED LLWAP_X LLWAP_X LLWAP_X LLWAP_X LPE LLWAP_X LPE LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X LLWAP_X EX-POST VISAYAS CONDITION PRICES USED VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X VLWAP_X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 L L HOUR V U O B C DE PSM V U O B C DE PSM
HOURLY PRICING RESULTS FOR BOTH THE EX-ANTE AND EX-POST MARKET RUNS. IT MUST BE NOTED, HOWEVER, THAT THE PRICING CONDITIONS INDICATED IN THIS TABLE ARE NOT YET FINAL. SUMMARY OF CONDITIONS "-" MARKET RUN HAS NO PRICING ERROR PSM INDICATES THAT A CONGESTION PRICING ERROR WAS ENCOUNTERED DURING THE MARKET RUN AFFECTING EITHER REGION OR BOTH PEN INDICATES THAT A NON-CONGESTION OR LOCALIZED CONGESTION PRICING ERROR WAS ENCOUNTERED DURING THE MARKET RUN AFFECTING EITHER REGION OR BOTH MI INDICATES THAT A MARKET INTERVENTION WAS INITIATED BY THE SO OR MO AFFECTING EITHER REGION OR BOTH SUMMARY OF PRICES USED LWAP_D RTD LOAD-WEIGHTED AVERAGE PRICE LWAP_X UNCP_D UNCP_X PE AP RTX LOAD-WEIGHTED AVERAGE PRICE RTD ESTIMATED LOAD REFERENCE PRICE RTX ESTIMATED LOAD REFERENCE PRICE ESTIMATED PRICE IN PLACE OF MRR PRICE ADMINISTERED PRICE
SUMMARY OF THE REASONS BEHIND THE ISSUANCE OF PRICING ERROR NOTICES FOR EACH TRADING INTERVAL
INDICATION OF PREFIXES S INDICATES THAT THE PRICING ERROR AFFECTED THE SYSTEM (LUZON-VISAYAS) L MEANS THAT THE PEN WAS ISSUED ONLY IN LUZON INDICATES THAT THE PEN WAS ISOLATED ONLY IN THE VISAYAS
OVER-GENERATION V BASE CASE CONSTRAINT VIOLATION CONTINGENCY CONSTRAINT VIOLATION DATA ERROR OR ERRONEOUS DATA INPUT
* NOTE: PREFIXES ARE AFFIXED FOR THE REMARKS TO INDICATE THE REGION "L" FOR LUZON AND "V" FOR THE VISAYAS
Ref# DMU_20131102-306
LOAD WEIGHTED AVERAGE PRICE (SYSTEM AND REGIONAL, EX-ANTE)
ADMIN PRICE UNCONS. PRICE EST. PRICE SYSTEM LWAP MAX NODAL PRICE MIN NODAL PRICE
15000
12000
12000
9000
9000
9000
6000
6000
6000
3000
3000
3000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF PRICES USED AND THE MAXIMUM AND MINIMUM NODAL PRICES DURING THE TRADING DAY
HOURLY TREND OF THE SYSTEM AND REGIONAL LWAP DURING THE TRADING DAY
15000
80
PERCENT OF TIME
12000
60
9000
40
6000
20
3000
0 0 and Below 0 - 2000 2000 - 4000 4000 - 6000 6000 - 8000 8000 10000 10000 and Above
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
DISTRIBUTION OF THE HOURLY SYSTEM LWAP DURING THE TRADING DAY AND THE CURRENT BILLING MONTH. THE DAILY AND MONTHLY PERCENT OF TIME IS CALCULATED BASED ON A 24-HOUR TIME PERIOD AND THE TOTAL NUMBER OF HOURS DURING THE CURRENT BILLING MONTH AS OF THE TRADING DAY, RESPECTIVELY.
HOURLY LWAP TREND IN VARIOUS AREAS IN LUZON AND THE VISAYAS, SUCH AS NORTH LUZON, METRO MANILA, SOUTH LUZON, LEYTE/SAMAR, CEBU, NEGROS, BOHOL, AND PANAY
Ref# DMU_20131102-306
MARKET INDICES
MARKET RESIDUAL SUPPLY INDEX VS. PIVOTAL SUPPLIERS (SYSTEM)
200
MARKET RSI PIVOTAL SUPPLIERS
16
120
12
80
40
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURLY TREND OF THE MARKET RESIDUAL SUPPLY INDEX (MARKET RSI) PLOTTED AGAINST THE NUMBER OF PIVOTAL SUPPLIER/S. THE RSI MEASURES THE RATIO OF AVAILABLE GENERATION WITHOUT A GENERATING PLANT TO THE TOTAL GENERATION REQUIRED TO SUPPLY THE DEMAND.
THE PERCENTAGE OF TIME THAT A GENERATING PLANT WAS PIVOTAL DURING THE TRADING DAY. THE PERCENTAGE OF TIME IS CALCULATED BASED ON A 24-HOUR TIME PERIOD.
16
120
12
80
40
THE FREQUENCY AND PERCENTAGE OF TIME THAT A GENERATING PLANT BECAME THE MARGINAL GENERATOR (PRICE SETTER) DURING THE TRADING DAY. THE PERCENT OF TIME IS CALCULATED BASED ON A 24-HOUR TIME PERIOD.
Ref# DMU_20131102-306
SECURITY LIMIT
RESOURCE ID 1MARVEL_G01 1MARVEL_G01 3BACMAN_G02 3STA-RI_G03 3STA-RI_G03 REGION LUZON LUZON LUZON LUZON LUZON REASON LOAD STABILIZATION LOAD STABILIZATION COMMERCIAL OPERATION REQ START-UP LOAD LOAD STABILIZATION PMIN 100 150 18 80 165 PMAX 100 150 18 80 165 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24