Loadings and Stability

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 17

PROJECT:LRT2-FLOODLIGHTING POLE FOUNDATION

A. Loadings
A.1 Dead Load
Gross Weight Of Monopole Tower =

96.69

kN

A.2 Wind Load


Cq = 1.4

P1

0.72

P2

6
qs= 0.000049*v^2

P3

= 0.000049*250^2

=
P4
6

Cq = 0.8

P2
P5

6
P6
6
P7
0.3

Cq = 1.4

1m x 1m
2.8
A
0.7

Pivot Point
7.5
Module

Ht.(m)

Ce

Area(mm^2)

P(kN)

31.02

1.61

1.8

12.58

30.3

1.6

3.97

24.3

1.52

2.41

8.31

18.3

1.42

2.82

9.21

12.3

1.3

3.23

9.75

6.3

1.08

3.64

9.20

0.3

1.08

0.3

6.28

P= Ce*Cq*qs*A
P1= 1.61*1.4*3.1*1.0*1.8
=

12.58

kN

3.1

P2= 1.6*0.8*3.10*1.0*2/2
=

3.97

kN

M @ A = 12. 58*33.4 6+3.97*33.1+8.31*27.1+9.21*21 .1+9.75*15.1+9.2*9.1+6.28*3.1


=

1222.69

kN-m

M @ B = 12. 58*34.16 6+3.97*33.8+8.31*27.8+9.21*21 .8+9.75*15.8+9.2*9.8+6.28*3.8


=

1264.2

kN-m

0.000049*v^2
0.000049*250^2
kPa

PROJECT

FLOODLIGHTING POLE
FOUNDATION

SUBJECT

FOUNDATION STABILITY CHECK


(MONOPOLE)

PROJECT NO.
CHECKED BY:

DATE

PREP'D BY:

DATE SEPT.11,2001

VASV

Dead Load

tp
PB x PD

Soil

t
Pivot point

FB x FD

PARAMETERS
Forces(Horizontal)
P1
12.58
P2

3.97

kN
kN

P3

8.31

kN

P4

9.21

kN

P5

9.75

kN

P6

9.20

kN

6.28

kN

7.50
7.50
0.70
0.30

M
M
M
M

P7
Dimensions
FB
FD
t
tp

Dead Load

96.69

1.00
1.00
2.80

PB
PD
H

M
M
M

kN
Materials
Soil density
16.00
Conc. Density
24.00
0.18
m

CHECK STABILITY AGAINST OVERTURNING


OVERTURNING MOMENTS
FORCE (kN)
MOMENT ARM (M) OVERTURNING MOMENT (kN-M)
P1

12.58

34.52

434.17

P2

3.97

33.80

134.12

P3
P4
P5
P6
P7

8.31
27.80
9.21
21.80
9.75
15.80
9.20
9.80
6.28
3.80
TOTAL OVERTURNING MOMENT
RIGHTING MOMENTS
FORCE (kN)
MOMENT ARM (M)
Pedestal
74.40
3.75
Footing
945.00
3.75
Soil
2,475.20
3.75
Dead Load
96.69
3.75
TOTAL RIGHTING MOMENT
FACTOR OF SAFETY
RM/OM
10.62

231.07
200.76
154.09
90.16
23.87
1,268.24
RIGHTING MOMENT (kN-M)
279.00
3,543.75
9,282.00
362.59
13,467.34
>
2.50
SAFE

kN/cu.m.
kN/cu.m.

PROJECT

FLOODLIGHTING POLE
FOUNDATION

SUBJECT

FOUNDATION STABILITY CHECK


(MONOPOLE)

PROJECT NO.
CHECKED BY:

DATE

PREP'D BY:

DATE SEPT.11,2001

CHECK STABILITY AGAINST SLIDING


GROSS HORIZONTAL FORCES
59.30
RESISTING FORCE
Pedestal
74.40
Footing
945.00
Soil
2,475.20
Total Wt. 3,494.60
RESISTING FORCE (m*Total Wt.)
615.05
FACTOR OF SAFETY
SF/RF
10.37
>
1.50

VASV

kN
kN
kN
kN
kN
kN
SAFE

PROJECT:LRT2-FLOODLIGHTING POLE FOUNDATION


SUBJECT: SHEAR CHECK

CL
soil

CB

D
d

Mx

X
My

B
t

Y
a

f'c =
30
Mpa
Pumax = 869.15 kN
t=
700
mm
b = 1000 mm

PARAMETERS
c.c
70
mm
d=
630
mm
f=
0.85
B=
7.5
m
L=
7.5
m

Pu =
qu =
CB =
CL =
Ap =

96.6
21
1000
1000

kN
kPa
mm
mm
mm^2

CHECK FOR ONE WAY SHEAR (BEAM SHEAR@CRITICAL SECTION)


0
0
nu = Vu/fbd =
Vu = Pumax
= 869.15 kN
1.62
fc' / 6 =
na =
0.91 MPa
< nu =
1.62 fail, change thickness

Vu = Pu-qu*Ap
fc' / 3
na =

=
=

CHECK FOR TWO WAY SHEAR (PUNCHING SHEAR)


0
0
np = Vu/fbd = #DIV/0! MPa
0
kN
1.83 MPa
< np = fail,
0.00
change thickness

MPa